Request # | Quad | Description | Requester | Information On Request |
Recommendation | Comments On Recommendation | EC Status | Ratification | Final Action |
WGQ 2025 Annual Plan Item 5 | WGQ | Review and update, as necessary, the RNG Addendum to address new regulations or new market developments related to RNG transactions under the NAESB Base Contract | WGQ Contracts Subcommittee | Recommendation Attachment 1 - Updated RNG Addendum to the Base Contract |
WGQ Request for Comments Due April 21, 2025 | ||||
WGQ 2025 Annual Plan Item 4 | WGQ | Develop Business Practice Standards, as needed, to Support Purchase and Sale Transactions related to Hydrogen. | WGQ Contracts Subcommittee | Recommendation Attachment 1 - Base Contract for Purchase and Sale of Hydrogen |
WGQ Request for Comments Due March 31, 2025 Comments Submitted by J. Flory on behalf of the Center for Houston's Future Comments Submitted by D. Burns, General Index Comments Submitted by the WGQ EC Producer Segment Members Comments Submitted by K. Sappenfield, KS Energy Consultant |
||||
R25003 | WGQ | Request to modify timelines included in NAESB WGQ Standard No. 1.3.37: Nominations Related Standards | Enercross LLC on behalf of eight interstate gas shippers across various pipelines. | ||||||
R25002 | WGQ | Request to modify NAESB WGQ Standard 5.4.25 to make certain information mandatory in the Bids, Offers, Awards datasets and the Replacement Shipper Contract Number in the Offers and Awards datasets. | Enercross LLC on behalf of eight interstate gas shippers across various pipelines. | ||||||
R25001 | WGQ | Request to modify NAESB WGQ Standard No. 1.4.5 - Scheduled Quantity to include missing pool volumes in the SQTS dataset. | Enercross LLC on behalf of eight interstate gas shippers across various pipelines. | ||||||
R24006 | WGQ | In NAESB WGQ Version 4.0, request to add two new Business Conditional data elements titled “Off-System Downstream Contract Indicator” and “Off-System Upstream Contract Indicator” to the Nomination Dataset (NAESB WGQ Standard No. 1.4.1) and add them as Conditional data elements to the Scheduled Quantity Dataset (NAESB WGQ Standard No. 1.4.5). Additionally, add them to the nomination key in NAESB WGQ Standard No. 1.3.27. | Iroquois Gas Transmission System, L.P. and TC Energy | ||||||
2024 WGQ Annual Plan Item 1 | WGQ | Review WGQ Cybersecurity Related Standards Manual, including data fields and minimum technical characteristics, and revise as needed | Electronic Delivery Mechanisms Subcommittee | Recommendation | WGQ Request for Comments Due October 10, 2024 | ||||
R24004 | WGQ | Request to add additional Data Elements to the NAESB WGQ Standard 3.4.1 Transportation / Sales Invoice dataset to accommodate the practice of charging Distance Based Rates for transportation services. | TC Energy Corporation | Recommendation | WGQ Request for Comments Due December 27, 2024 Comments Submitted by M. Agen, American Gas Association | ||||
2024 WGQ Annual Plan Item 4.a / 2024 WEQ Annual Plan Item 6.a / 2024 RMQ Annual Plan Item 3.a | WGQ, WEQ, and RMQ | Review and modify the Gas / Electric Coordination Business Practice Standards and any corresponding standards to improve communication among the operators of production facilities (producers, gatherers, processors) and pipeline and storage facilities for the timely dissemination of this coordinated communication from the these facilities to and from relevant natural gas infrastructure entities, BAs, shippers, and end-use customers (i.e., Local Distribution Companies) as needed to enhance situational awareness during extreme cold weather events without endangering sensitive commercial information | Joint WGQ/WEQ/RMQ BPS | Recommendation | WGQ, WEQ, and RMQ Request for Comments Due August 19, 2024 Comments Submitted by C. Smith, Interstate Natural Gas Association of America Comments Submitted by J. Phillips on behalf of the IRC Electric Gas Coordination Task Force |
||||
R23005 | WGQ | Request to allow TSPs to display Search Criteria to the Customer Activities Navigational Area and allow TSPs to display Favorites/Bookmarks/quick links for commonly used functions to Header or Navigational Area. Address the placement of Search Criteria and Commonly Used Screens to appear above those categories described in NAESB WGQ Standard 4.3.42 | Kinder Morgan Inc. and Enbridge (U.S.) Inc. | Recommendation | WGQ Request for Comments Due October 13, 2023 | ||||
R23004 | WGQ | Request to update condition of data element Route in NAESB WGQ Standard 2.4.3 Allocation. | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due October 19, 2023 | ||||
R23003 | WGQ | Request to add Mutually Agreeable data elements to support sending multiple contacts in one invoice in the following Datasets: 3.4.1 Transportation/Sales Invoice, 3.4.2 Payment Remittance, 3.4.3 Statement of Account and 3.4.4 Service Requester Level Charge/Allowance Invoice | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due October 19, 2023 | ||||
WGQ 2023 Annual Plan Item 4 | WGQ | Develop technical implementation business practice standards to support automation of the new Renewable Natural Gas Addendum and necessary modifications of the Base Contract for Sale and Purchase of Natural Gas | Joint WGQ BPS/EDM/Contracts Subcommittee | Recommendation Attachment 1 - Executive Summary Attachment 2 - Contract Dataset Attachment 3 - Transaction Confirmation Dataset Attachment 4 - Invoice Dataset Attachment 5 - Invoice Response Dataset Attachment 6 - FAQ Document |
WGQ Request for Comments Due August 7, 2023 | ||||
WGQ 2023 Annual Plan Item 5 | WGQ | Develop technical implementation business practice standards to support automation of the new Certified Gas Addendum and necessary modifications of the Base Contract for Sale and Purchase of Natural Gas. | Joint WGQ BPS/EDM/Contracts Subcommittee | Recommendation Attachment 1 - Executive Summary, Business Process and Practices, & Related Standards Attachment 2 - 6.4.1 Contract Dataset Attachment 3 - 6.4.2 Transaction Confirmation Dataset Attachment 4 - 6.4.3 Sale Purchase Invoice Dataset Attachment 5 - 6.4.4 Sale Purchase Invoice Response Dataset Attachment 6 - Appendix A - FAQs for Base Contract Attachment 7 - Appendix C - New Certified Gas Addendum FAQs |
WGQ Request for Comments Due June 12, 2023 Comments Submitted by Cheniere, K.Sappenfield |
||||
R23001 | WGQ | Proposed revisions to the NAESB Base Contract for Sale and Purchase of Natural Gas to improve the clarity associated with the force majeure provisions in the contract. | Southwest Power Pool, PJM Interconnection, MISO Energy, Texas Competitive Power Association, UGI Utilities and CenterPoint Energy | No Action Recommendation | WGQ Request for Comments Due October 16, 2023 Comments Submitted by Xcel Energy Comments Submitted by APGA Comments Submitted by The Petroleum Alliance of Oklahoma Comments Submitted by CenterPoint Energy Comments Submitted by ConocoPhillips Company, Global Trading, Gas & Power Americas, Chevron Natural Gas, EQT Energy LLC, BP Energy Company and Occidental Energy Marketing, Inc. Comments Submitted by National Public Gas Agency Comments Submitted by Jo-Carroll Energy Comments Submitted by the City of Tallahassee Comments Submitted by National Grid Comments Submitted by ONEOK Comments Submitted by the American Gas Association Comments Submitted by Cheniere Comments Submitted by EQT Energy Comments Submitted by Coterra Energy Comments Submitted by UGI Utilities Comments Submitted by ConEdison Comments Submitted by the Duke Energy LDCs Comments Submitted by the Duke Energy Electric Utilities Late Comments Submitted by the Municipal Gas Authority of Georgia |
||||
WGQ 2023 Annual Plan Item 1.a and 1.b | WGQ | Review minimum technical characteristics in the Appendices of the WGQ QEDM Manual, and make changes as appropriate; and Review the data used in the NAESB WGQ Internet Electronic Transport specification for data fields that may no longer be utilized and determine if these data fields can be removed | WGQ EDM | Recommendation Attachment A Attachment B |
WGQ Request for Comments Due March 23, 2023 Comments Submitted by ONEOK Comments Submitted by WGQ EDM Subcommittee on Attachment A Comments Submitted by WGQ EDM Subcommittee on Attachment B |
||||
WGQ 2023 Annual Plan Item 1.c/R22003 - Revised | WGQ | Review cybersecurity standards to determine if baseline Multi-Factor Authentication (MFA) should be integrated into standard requirements and develop supportive standards as needed. | Boardwalk Pipelines, Eastern Gas Transmission & Storage Inc., Enbridge (U.S.) Inc., Kinder Morgan, Inc., Northern Natural Gas, Southern Star Central Gas Pipeline, TC Energy Corporation, Iroquois Gas Transmission System, L.P. | Recommendation | WGQ Request for Comments Due March 10, 2023 | ||||
WGQ 2022 Annual Plan Item 6 | WGQ | Develop a Responsibly Sourced Natural Gas (RSG) Addendum to the NAESB Base Contract for various program offerings | WGQ Contracts | Recommendation Recommendation Attachment A - NAESB CG Addendum including Exhibit A (CG Transaction Confirmation) Recommendation Attachment B - Revised NAESB WGQ Contracts FAQ Document to include CG Addendum |
WGQ Request for Comments Due January 16, 2023 Comments Submitted by Cheniere, K.Sappenfield - Attachment A Comments Submitted by Cheniere, K.Sappenfield - Attachment B Comments Submitted by Cheniere, K.Sappenfield - General Comments Comments Submitted by the WGQ Contracts Subcommittee - Attachment A Comments Submitted by the WGQ Contracts Subcommittee - Attachment B Comments Submitted by EDF Comments Submitted by Project Canary |
||||
WGQ 2022 Annual Plan Item 4 | WGQ | Develop modifications to the NAESB Base Contract or a new standardized contract if it is determined beneficial. RNG Addendum is being developed for both Regulatory and Voluntary Programs. | WGQ Contracts | Recommendation Recommendation Attachment A - NAESB RNG Addendum including Exhibit A (RNG Transaction Confirmation) and Exhibit B (Transfer Certificate and Attestation) Recommendation Attachment B - Revised NAESB WGQ Contracts FAQ Document |
WGQ Request for Comments Due November 30, 2022 Comments Submitted by Cheniere, K.Sappenfield - Attachment A Comments Submitted by Cheniere, K.Sappenfield - Attachment B Comments Submitted by Cheniere, K.Sappenfield - General Comments Late Comments Submitted by the WGQ Contracts Subcommittee - Attachment A Late Comments Submitted by the WGQ Contracts Subcommittee - Attachment B |
||||
WGQ 2022 Annual Plan Item 5.a.ii and R21006 | WGQ | Request to create standard designations of critical natural gas infrastructure facilities that are essential to the operations of critical electric infrastructure facilities during impending extreme weather-related emergency operating conditions consistent with other industry designations. | WGQ BPS | No Action Recommendation | WGQ Request for Comments Due August 4, 2022 | ||||
WGQ 2022 Annual Plan Items 5.a.i and 5.a.iii | WEQ and WGQ and RMQ | Request for Standards Development to Support Coordinated Commercial Practices Between the Natural Gas and Electric Markets During Impending Extreme Weather-Related Emergency Operating Condition. | Southwest Power Pool | No Action Recommendation | WEQ/WGQ/RMQ Request for Comments Due May 26, 2022 Comments Submitted by the ISO/RTO Council's Standards Review Committee and Electric Gas Coordination Task Force Late Comments Submitted by the WEQ Standards Review Subcommittee | ||||
R21006 | WEQ and WGQ and RMQ | Request for Standards Development to Support Coordinated Commercial Practices Between the Natural Gas and Electric Markets During Impending Extreme Weather-Related Emergency Operating Condition. | Southwest Power Pool | No Action Recommendation | WEQ/WGQ/RMQ Request for Comments Due May 26, 2022 Comments Submitted by the ISO/RTO Council's Standards Review Committee and Electric Gas Coordination Task Force Late Comments Submitted by the WEQ Standards Review Subcommittee | ||||
2021 WEQ Annual Plan Item 5 and 2021 WGQ Annual Plan Item 3 | WEQ and WGQ | Develop business practices as needed to support electronic filing protocols for submittal of FERC Forms | WEQ/WGQ FERC Forms Subcommittee | No Action Recommendation | WEQ and WGQ Request for Comments Due November 22, 2021 |
||||
R21001 | WGQ | Request to modify NAESB WGQ Standard 0.4.1 Storage Information to add sender’s option data element “Cycle Indicator” | Northern Natural Gas | Recommendation | WGQ Request for Comments Due September 16, 2021 |
||||
WGQ 2020 Annual Plan Item 6.c | WGQ | Develop and/or modify the NAESB Business Practice Standards as needed to address Additional Findings and Considerations identified by Sandia National Laboratories | Recommendation | WGQ Request for Comments Due November 16, 2020 |
|||||
R20014 | WGQ | Request to update the Condition for data element "Charge Type Rate" to NAESB WGQ Standard No. 3.4.1 (Transportation/Sales Invoice). Need the ability to send a null Charge Type Rate when Blended Rates occur. | Kinder Morgan Inc | Recommendation | WGQ Request for Comments Due March 11, 2021 |
||||
R20012 | WGQ | Request to modify the Allocation Matrix (NAESB WGQ Standard 2.4.3 Allocation) to reflect usage of Service Requester Contract as mutually agreed, rather than not used, for allocation transaction types 10R and 10D. | Northern Natural Gas | Recommendation | WGQ Request for Comments Due November 17, 2020 |
||||
R20009 | WGQ | Request to add a Sender's Option data element “Location Indicator Data" to NAESB WGQ Standard No. 5.4.20 (Transactional Reporting – Capacity Release) | Kinder Morgan Inc | Recommendation | WGQ Request for Comments Due November 17, 2020 |
||||
R20007 | WGQ | Request to add the following new data elements: Authorized Service Requester Account in the Authorization to Post Imbalances (NAESB WGQ Standard No. 2.4.9), Service Requester Account in the Posted Imbalances Download (NAESB WGQ Standard 2.4.10), Account – Confirming Trader in the Imbalance Trade (NAESB WGQ Standard No. 2.4.11), and Account – Initiating Trader in the Imbalance Trade (NAESB WGQ Standard No. 2.4.11). | Boardwalk Pipelines | Recommendation | WGQ Request for Comments Due June 29, 2020 |
||||
R20006 | WGQ | Request to add four mutually agreeable data elements for Nomination Contact information to NAESB WGQ Standard No. 1.4.1 (Nomination). | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due June 29, 2020 |
||||
R20005 | WGQ | Request to add a Sender's Option data element "Call Days Remaining" to NAESB WGQ Standard No. 0.4.1 (Storage Information) | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due June 29, 2020 |
||||
R20004 | WGQ | Request new data element Capacity Block ID in the Nomination (NAESB WGQ Standard No. 1.4.1) so that is based upon the business condition of the Transportation Service Provider receiving the nomination. Add necessary validation codes in the Nomination Quick Response (NAESB WGQ Standard No. 1.4.2), as needed. Additionally, modify the nomination key in NAESB WGQ Standard No. 1.3.27, as appropriate. | Boardwalk Pipelines | Recommendation | WGQ Request for Comments Due July 2, 2020 | ||||
WGQ 2019 Annual Plan Item 2 | WGQ | Review minimum technical characteristics in Appendices B, C, and D of the WGQ Quadrant Electronic Delivery Mechanism Related Standards (QEDM) Manual, and make changes as appropriate. | Joint WGQ Electronic Delivery Mechanisms Subcommittee | Recommendation Attachment: WGQ QEDM Related Standards |
WGQ Request for Comments Due February 19, 2020 Comments Submitted by the WGQ Pipelines |
||||
R20002 | WGQ | Request to add a Sender's Option data element "Location Indicator" to NAESB WGQ Standard No. 5.4.21 (Transactional Reporting – Firm Transportation) | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due June 4, 2020 |
||||
R20001 | WGQ | Request to add a Sender's Option data element "Invoice Notes" to NAESB WGQ Standard No. 3.4.1 (Transportation/Sales Invoice) | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due June 4, 2020 |
||||
R19016 | WGQ | Request to Modify usage and condition of 'Discount Indicator' in the Offer. | Dominion Energy Transmission, Inc., Southern Star Central Gas Pipeline, Enbridge (U.S.) Inc., Algonquin Gas Transmission, LLC, Big Sandy Pipeline, LLC, Bobcat Gas Storage, East Tennessee Natural Gas, LLC, Egan Hub Storage, LLC, Garden Banks Gas Pipeline, LLC, Gulfstream Natural Gas System, L.L.C., Maritimes & Northeast Pipeline, L.L.C., Mississippi Canyon Gas Pipeline, LLC, Nautilus Pipeline Company, L.L.C., NEXUS Gas Transmission, LLC, Ozark Gas Transmission, L.L.C., Sabal Trail Transmission, LLC, Saltville Gas Storage Company L.L.C., Southeast Supply Header, LLC, Steckman Ridge, LP, Texas Eastern Transmission, LP, TransCanada Pipelines Limited, ANR Pipeline Company, ANR Storage Company, Bison Pipeline LLC, Blue Lake Gas Storage Company, Central Kentucky Transmission Company, Columbia Gas Transmission, LLC, Columbia Gulf Transmission, LLC, Crossroads Pipeline Company, Gas Transmission Northwest LLC, Great Lakes Gas Transmission Limited Partnership, Hardy Storage Company, LLC, Millennium Pipeline Company, LLC, North Baja Pipeline, LLC, Northern Border Pipeline Company, Portland Natural Gas Transmission System,Tuscarora Gas Transmission Company | Recommendation | WGQ Request for Comments Due June 4, 2020 |
||||
R19014 Attachment 1 Attachment 2 |
WGQ | Request to add a new Nomination and Scheduling Related Standard for firm shipper's nomination of its MDQ during capacity reductions prior to nomination cycles | Sabine Pass Liquefaction, LLC and Corpus Christi Liquefaction, LLC | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee by Notational Ballot on 12/14/2020 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due November 30, 2020 Comments Submitted by Sabine Pass Liquefaction and Corpus Christi Liquefaction |
||||
WGQ 2019 Annual Plan Items 6.a and 6.b | WGQ | 6.a (Review the surety assessment performed by Sandia National Laboratories and determine if standard changes are necessary) and 6.b (Develop and/or modify the NAESB Business Practice Standards as needed to address Security Issues identified by Sandia National Laboratories) | Joint WGQ EDM and RMQ IR/TEIS Subcommittees | Recommendation Attachment 1: List of Proposed Standards and Documents Changes Attachment 2: Proposed Changes to Appendices of the WGQ QEDM Attachment 3: Proposed Changes to Appendices of the IET |
WGQ Request for Comments Due January 3, 2020 |
||||
R19011 Attachment |
WGQ | Review and modify, as necessary, the EDI data set structure of NAESB WGQ Standard No. 3.4.1 (Transportation/Sales Invoice), NAESB WGQ Standard No. 3.4.4 (Service Requester Level Charge/Allowance Invoice), and NAESB WGQ Standard No. 2.4.4 (Shipper Imbalance) to ensure the data sets comply with the hierarchical structure of the 811 ASC x12 data set and can be successfully used by trading partners. | Alliance Pipeline L.P., Boardwalk Pipelines, Enbridge (U.S.) Inc., Energy Transfer, Iroquois Gas Transmission System, L.P., Northern Natural Gas, Dominion Energy Transmission Inc., Kinder Morgan Interstate Pipes, TransCanada Pipelines Limited, Southern Star Central Gas Pipeline | Recommendation Attachment |
WGQ Request for Comments Due February 10, 2020 |
||||
R19009 | WGQ | Request to Modify Reference to the Wall Street Journal - Money Rates - publication in Section 7.5 of the NAESB WGQ Standard No. 6.3.1 Base Contract for Sale and Purchase of Natural Gas. | Cheniere Corpus Christi Liquefaction, LLC | Withdrawn by Submitter - July 11, 2019 |
|||||
R19006 Attachment | WGQ | Request to change NAESB WGQ Standard No. 6.3.1 Base Contract for Sale and Purchase of Natural Gas, Section 2.25: Spot Price Publication. Argus requests that its Argus Natural Gas Americas service be added as a spot price publication reference. | Argus Media, Inc. | Recommendation Attachment: Exhibit A |
WGQ Request for Comments Due August 29, 2019 |
||||
R19001 Attachment | WGQ | Request to add a Sender's Option data element "Location Fuel Area" to NAESB WGQ Standard No. 0.4.4 (Location Data Download) | Enbridge (U.S.) Inc. | Recommendation | WGQ Request for Comments Due August 15, 2019 |
||||
R18013 | WGQ | Request to modify NAESB WGQ Standard No. 4.3.49 to allow for processing functions at the line item level on Customer Activities websites and to allow for the use of icons and/or graphical control elements for navigation and/or processing functions. | Boardwalk Pipeline Partners, LP, Northern Natural Gas, Dominion Energy Transmission Inc and TransCanada Pipelines Limited | Recommendation | WGQ Request for Comments Due August 15, 2019 |
||||
R18008 R18008-Revised |
WGQ | Request to add existing data element 'Route' to the following data set(s): NAESB WGQ Standard No. 1.4.3 - Request for Confirmation, NAESB WGQ Standard No. 1.4.3 - Confirmation Response and NAESB WGQ Standard No. 1.4.6 - Scheduled Quantity for Operator | Williams Companies, Inc | Recommendation | WGQ Request for Comments Due March 25, 2019 |
||||
R18007 / WGQ 2020 Annual Plan Item 1 | WGQ | Request to develop a standard digital representation of natural gas trade events, consistent with NAESB WGQ Standard No. 6.3.1 - NAESB Base Contract for Sale and Purchase of Natural Gas, in order to capitalize on smart contract and distributed ledger technologies. | Big Data Energy Services American Electric Power Service Corp. Adjoint Inc Tennessee Valley Authority Pariveda JKM Energy & Environmental Consulting |
Recommendation for R18007-A Attachment A - Executive Summary Attachment B - Standards Language Attachment C - Dataset Recommendation for R18007-B Attachment A - Executive Summary of NAESB WGQ Contracts Standards & Models Manual (Clean) Attachment A: (Redline) Attachment B - Standards Language: for NAESB WGQ Contracts Standards & Models Manual (Clean) Attachment B: (Redline) Attachment C - Modified 6.4.1 Contracts Dataset (Clean) Attachment C: (Redline) Attachment D - 6.4.2 Transaction Confirmation Dataset Attachment E - 6.4.3 Sale and Purchase Invoice Dataset Attachment F - 6.4.4 Sale and Purchase Invoice Response Dataset Attachment G - 6.3.1 NAESB Base Contract for Sale and Purchase of Natural Gas (NAESB Base Contract) (Clean) Attachment G: (Redline) Attachment H - 6.3.1.CA Canadian Addendum to the NAESB Base Contract (Clean) Attachment H: (Redline) Attachment I - 6.3.1.MA Mexican Addendum to the NAESB Base Contract (Clean) Attachment I: (Redline) Attachment J - FAQs for NAESB Base Contract (Clean) Attachment J: (Redline) |
WGQ Request for Comments Recommendation for R18007-A Due October 16, 2019 Comment Summary Submitted by Cheniere Corpus Christi Liquefaction Attachment C Redline Mark-up Submitted by Cheniere Corpus Christi Liquefaction Comments Submitted by Enbridge (U.S.) Inc. WGQ BPS, EDM and Contracts Subcommittee Chair's Comments Recommendation R18007-A WGQ BPS, EDM and Contracts Subcommittee Chair's Comments Recommendation R18007-A Attachment C WGQ BPS, EDM and Contracts Subcommittee Chair's Comments Recommendation R18007-A Attachment B WGQ Request for Comments Recommendation for R18007-B Due June 17, 2020 |
||||
R18006 | WGQ | Request to Add a new data element 'Pool Rank' to the following data set(s): NAESB WGQ Standard No. 1.4.4 Confirmations | Dominion Energy Transmission, Inc. and Dominion Energy Cove Point LNG, LP | Withdrawn by Submitter - September 26, 2018 | |||||
R18005 | WGQ | Request to revise references to the standard quantity for Mexico to gigajoules in the WGQ Business Practice Standards and Technical Implementation. | 8760 Inc. | Withdrawn by Submitter - May 2, 2018 | |||||
R18003 | WGQ | Request to add the data elements 'Transport Contract' to Imbalance Trade. | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due August 21, 2018 |
||||
R18001 R18001-Revised |
WGQ | Request to add the data elements - Payee's Bank Wire ABA Number' and 'Payee's Bank ACH ABA Number' to the Transportation Sales/Invoice, Payment Remittance, and Service Requester Level Charge / Allowance Invoice. | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due August 21, 2018 |
||||
R17009 | WGQ | Request to add data elements and related code values to accommodate contractual quantities stated on an MCF basis in the following data sets: Bid, Award Download, Transactional Reporting � Capacity Release, Transactional Reporting � Firm Transportation, and Transactional Reporting � Interruptible Transportation. | Enbridge (U.S.) Inc. / Spectra Energy Corp | Recommendation | WGQ Request for Comments Due March 21, 2018 | ||||
R17008 | WGQ | Request to convert the NAESB Invoice, Allocation and Imbalance datasets to XML. | Aquilon Energy | ||||||
R17007 | WGQ | Request for new NAESB standard requiring historic retrieval to reflect the data in the time period in which the information was originally provided. | Aquilon Energy | Withdrawn by Submitter - September 21, 2018 | |||||
R17006 | WGQ | Request to define a NAESB standard time frame for information to be displayed and retained on the Customer Activities Website. | Aquilon Energy | Withdrawn by Submitter - September 21, 2018 | |||||
R17005 | WGQ | Request to define a NAESB standard time frame for information to be retained on the Informational Postings Website. | Aquilon Energy | Recommendation Recommendation August 23, 2018 |
WGQ Request for Comments Due March 29, 2018 Comments Submitted by P. Connor WGQ Request for Comments Due September 21, 2018 on Recommendation August 23, 2018 |
||||
R17003 | WGQ | Request to add the data element �Right to Amend Primary Points 3 Month Limit� to NAESB WGQ Standard Nos. 5.4.24 (Offer), 5.4.26 (Award Download), and 5.4.20 (Transactional Reporting � Capacity Release) data sets, and two associated code values. | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due December 13, 2017 | ||||
R17002 | WGQ | Request to Modify the usage of data element Service Requester Contract for the Un-threaded Segment of the Pathed Non-Threaded Model in NAESB WGQ Standard Nos. 1.4.1 Nomination and 1.4.5 Scheduled Quantity data sets so that the usage of Service Requester Contract is changed to Business Conditional, based upon the business condition of the Transportation Service Provider receiving the nomination. Make corresponding modifications to other data sets, as needed, including the addition of any necessary validation codes to accommodate the requested change. Modify the nomination key in NAESB WGQ Standard No. 1.3.27, as appropriate, to reflect the change in the usage of Service Requester Contract. Additionally, add the data element Service Requester to the nomination key in 1.3.27 to reflect its mandatory usage in the Nomination. | Boardwalk Pipeline Partners, LP and Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due August 14, 2017 Comments Submitted by G. Lander, Skipping Stone, LLC |
||||
R17001 Attachment 1 - Spanish Attachment 2 - English (.docx version) Attachment 2 - English (.pdf version) |
WGQ | Request to modify NAESB WGQ Standard 1.3.14 and related standards to remove references to gigacalories as the standard quantity for nominations, confirmations and scheduling in Mexico. | TransCanada Pipelines USA, Ltd. and Spectra Energy Corp / Enbridge Inc | Recommendation | WGQ Request for Comments Due December 13, 2017 | ||||
2017 WGQ Annual Plan Item 2 | WGQ | Review minimum technical characteristics in Appendices B, C, and D of the WGQ QEDM Manual, and make changes as appropriate. | WGQ Electronic Delivery Mechanisms (EDM) Subcommittee | Recommendation Attachment |
WGQ Request for Comments Due April 25, 2017 |
||||
2017 WGQ Annual Plan Items 5.a and 5.b |
WGQ | Mexican Addendum or Base Contract: 5.a. - Consider and determine if a need for a Mexican Addendum or Base Contract 5.b. - Develop the Mexican Addendum or Base Contract according to the analysis completed in Item 5.a |
WGQ Contracts Subcommittee | Recommendation Recommendation August 22, 2017 Attachment - Exhibit A |
WGQ Request for Comments Due February 22, 2017 Comments Submitted by V. Crockett, WGQ Chairman Comments Submitted by J. Buccigross, Group 8760 Late Comments Submitted by M.de la Peza Gandara, CRE WGQ Request for Comments on Recommendation August 22, 2017 Due September 20, 2017 Comments Submitted by R. Figueiredo, Santa Fe Natural Gas Exhibit A: Late Comments Submitted by the WGQ Contracts Subcommittee in response to comments from Santa Fe Natural Gas (Redline) Exhibit A: Late Comments Submitted by the WGQ Contracts Subcommittee in response to comments from Santa Fe Natural Gas (Clean) |
||||
2017 WGQ Annual Plan Item 3.a.i 2016 WGQ Annual Plan Item 3.b.i |
WGQ | Gas-Electric Coordination - Resulting from the efforts of annual plan item 3(a), develop standards as needed and directed by the Board of Directors, which are specifically assigned to the WGQ: i. - GEH Forum Issue 22: �It would be desirable to have a set of terminology agreed upon by participants to characterize shapes, profiles, ratable, non-ratable, and so forth to facilitate discussion� |
WGQ Business Practices Subcommittee | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by M. Burroughs, American Gas Association |
||||
2017 WGQ Annual Plan Items 3.a.ii-iii 2016 WGQ Annual Plan Items 3.b.ii-iii |
WGQ | Gas-Electric Coordination - Resulting from the efforts of annual plan item 3(a), develop standards as needed and directed by the Board of Directors, which are specifically assigned to the WGQ: ii. - GEH Forum Issue 25: Communication protocols with LDCs, gas generator operators and natural gas marketing companies iii. - GEH Forum Issue 26: �Improve efficiency of critical information sharing (related to issues 22 and 25) |
WGQ Business Practices Subcommittee | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by M. Burroughs, American Gas Association |
||||
2017 WGQ Annual Plan Item 3.a.iv 2016 WGQ Annual Plan Item 3.b.iv |
WGQ | Gas-Electric Coordination - Resulting from the efforts of annual plan item 3(a), develop standards as needed and directed by the Board of Directors, which are specifically assigned to the WGQ: iv. - GEH Forum Issue 33: �Use of multiple confirmation methods in addition to traditional confirmations for intraday nominations. There is currently a good definition of Confirmation by Exception (CBE) in NAESB standards. CBE however, may not be available everywhere but there may also be additional confirmation methods that could benefit from standardization� |
WGQ Business Practices Subcommittee | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by M. Burroughs, American Gas Association |
||||
2017 WGQ Annual Plan Item 3.a.v 2016 WGQ Annual Plan Item 3.b.v |
WGQ | Gas-Electric Coordination - Resulting from the efforts of annual plan item 3(a), develop standards as needed and directed by the Board of Directors, which are specifically assigned to the WGQ: v. - GEH Forum Issue 36: �Level of confirmations: there is a wide range of data elements that are exchanged, from a minimum amount to a very large set of data. In the "Art of Scheduling," pipelines confirm at different levels, with potential for disparities. Greater standardization could produce confirming efficiencies. (For example, confirm at the shipper-to-shipper level. Or, if there are confirmations at a lower level of detail, it would be driven by model type.) See issue 17 in the first presentation.� |
WGQ Business Practices Subcommittee | Part 1 Recommendation Part 2 Recommendation Part 3 Recommendation |
WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Part 2 Recommendation Comments Submitted by C. Gold, Natural Gas Supply Association Part 2 Recommendation Comments Submitted by Y.J. Bourgeois, Anadarko Energy Services Company Comments Submitted by M. Burroughs, American Gas Association |
||||
2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 1) 2017 WGQ Annual Plan Item 3.b.ii 2016 WGQ Annual Plan Item 3.c.iii R16007 and 2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 2) |
WGQ | Gas-Electric Coordination - Address standards development requests related to gas-electric harmonization: i. - Develop business practices as needed to support R16003 and attachment: Special Efforts Scheduling Services for Natural Gas Pipeline Transportation - The proposed standard addresses certain business practices relating to Best Efforts scheduling for natural gas pipeline transportation that is: a) scheduled outside of the standard grid-wide nomination cycles, b) permits flow changes outside of standard schedule flow periods; and/or c) involves Shaped Flow Transactions (as defined in the proposed standard). |
WGQ Business Practices Subcommittee | Part 1 Recommendation NO ACTION TO BE TAKEN Part 1 Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN Part 2 Recommendation |
WGQ Request for Comments Due February 20, 2017 Submitted by C. Nicolay, Macquarie Energy LLC's Part 2 Recommendation Comments Submitted by J. Peress, Environmental Defense Fund Comments Submitted by M. Burroughs, American Gas Association |
||||
2017 WGQ Annual Plan Item 3.b.ii 2016 WGQ Annual Plan Item 3.c.iii R16007 and 2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 2) |
WGQ | Gas-Electric Coordination - Address standards development requests related to gas-electric harmonization: b.ii./c.iii. - Develop business practices as needed to support R16007: �Update the NAESB Nomination dataset and related datasets to support the ability for a service requester to submit a single nomination with hourly quantities when such a service is supported by the TSP.� b.i./c.i - Develop business practices as needed to support R16003 and attachment: Special Efforts Scheduling Services for Natural Gas Pipeline Transportation - The proposed standard addresses certain business practices relating to Best Efforts scheduling for natural gas pipeline transportation that is: a) scheduled outside of the standard grid-wide nomination cycles, b) permits flow changes outside of standard schedule flow periods; and/or c) involves Shaped Flow Transactions (as defined in the proposed standard). |
WGQ Business Practices Subcommittee | Recommendation | WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by J. Peress, Environmental Defense Fund Comments Submitted by M. Burroughs, American Gas Association |
||||
R16014 | WGQ | Request for an enhancement to NAESB WGQ Standard 4.3.80 to increase the allowable field length in ASCII Comma Separated Value (CSV) files. | Columbia Gas Transmission, LLC and FIS Energy Services | Recommendation | WGQ Request for Comments Due April 19, 2017 | ||||
R16013 | WGQ | Request to allow checkboxes and radio buttons to indicate �Yes� and/or �No� responses to Data Elements on Transportation Service Provider�s (TSP�s) Electronic Bulletin Boards (EBBs). | Columbia Gas Transmission, LLC and Boardwalk Pipeline Partners, LP | Recommendation | WGQ Request for Comments Due April 25, 2017 |
||||
R16012 | WGQ | Request to add three Business Conditional Data Elements to the Authorization to Post Imbalances dataset in NAESB WGQ Standard No. 2.4.9. Addition of these data elements will allow service requesters to authorize specific contracts and quantities for specified periods of time. | Columbia Gas Transmission, LLC | Recommendation | WGQ Request for Comments Due April 19, 2017 | ||||
R16009 Attachment 1 - Proposed Framework Attachment 2 - Rationale and Further considerations Attachment 3 - KBH Center Paper on LAUF Attachment 4 - ICF report on LAUF |
WGQ | A proposal to develop a uniform and transparent industry-wide standard for calculating LAUF for use by any entity providing natural gas delivery service that is required to report LAUF (�LAUF reporting entity� or �LRE�), including without limitation, (1) interstate pipelines, (2) storage operators, (3) intrastate pipelines, and (4) local distribution companies (�LDCs�) | Environmental Defense Fund, Citizens Utility Board, Tennessee Valley Authority, Massachusetts Attorney General�s Office and California Public Utilities Commission | Withdrawn by Submitter - December 7, 2016 | |||||
2016 WGQ Annual Plan Item 5.a and 5.b |
WGQ | a.) Consider and determine if a NAESB Liquefied Natural Gas (LNG) Master Agreement is needed. b.) Develop the LNG Master Agreement according to the analysis completed in item 5.a. |
WGQ Contracts Subcommittee | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee via Notational Ballot on 7/29/2016 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due June 20,2016 | ||||
R16007 | WGQ | Update the NAESB Nomination dataset and related datasets to support the ability for a service requester to submit a single nomination with hourly quantities when such a service is supported by the TSP. | FIS Global - Energy Services | 2016 WGQ Annual Plan Item 3.c.iii / 2017 WGQ Annual Plan Item 3.b.ii / R16007 and 2016 WGQ Annual Plan Item 3.c.i / 2017 WGQ Annual Plan Item 3.b.i / R16003 - Part 2 Recommendation | WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by J. Peress, Environmental Defense Fund Comments Submitted by M. Burroughs, American Gas Association |
||||
R16006 | WGQ | Update the Imbalance Trade (NAESB 2.4.11) dataset to re-add in the Confirming Trader�s ability to reject the trade. | FIS Global - Energy Services | Recommendation | WGQ Request for Comments Due November 2,2016 | ||||
R16005 | WGQ | Rework the usage of the Service Requester and Service Requester Contract in the NAESB 1.4.1 Nomination dataset to reflect actual usage. | FIS Global - Energy Services | Recommendation | WGQ Request for Comments Due November 29,2016 Comments Submitted by L. MacDonald, Centra Gas Manitoba Inc. |
||||
R16004 | WGQ | Update the NAESB 1.4.1 Nomination dataset to remove all non-necessary data elements and to evaluate the use of all Mutually Agreed and Business Conditional data elements for their continued relevance. | FIS Global - Energy Services | Withdrawn by Submitter - February 23, 2017 | |||||
R16003 Attachment 1 |
WGQ | Best Efforts Scheduling Services for Natural Gas Pipeline Transportation - The proposed standard addresses certain business practices relating to Best Efforts scheduling for natural gas pipeline transportation that is: a) scheduled outside of the standard grid-wide nomination cycles, b) permits flow changes outside of standard schedule flow periods; and/or c) involves Shaped Flow Transactions (as defined in the proposed standard). | Skipping Stone and Environmental Defense Fund | 2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 1) Recommendation NO ACTION TO BE TAKEN 2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 1) Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN 2017 WGQ Annual Plan Item 3.b.ii 2016 WGQ Annual Plan Item 3.c.iii R16007 and 2017 WGQ Annual Plan Item 3.b.i 2016 WGQ Annual Plan Item 3.c.i R16003 (Part 2) Recommendation |
WGQ Request for Comments Due February 20, 2017 Comments Submitted by C. Nicolay, Macquarie Energy LLC's Comments Submitted by J. Peress, Environmental Defense Fund Comments Submitted by M. Burroughs, American Gas Association |
||||
R16001 | WGQ | Request to Amend the Condition for Location Purpose Data the Transactional Data Sets: 5.4.20 Transactional Reporting- Capacity Release, 5.4.21 Transactional Reporting- Firm Transportation and 5.4.22 Transactional Reporting- Interruptible Transportation. | WBI Energy Transmission, Inc. | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 2/23/2017 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due November 2,2016 | ||||
R15008 | WGQ | Request to modify the usage of data element Service Requester Contract for the Pathed Non-Threaded Model (Un-threaded Segment) in the NAESB WGQ Standard Nos. 1.4.1 Nomination and 1.4.5 Scheduled Quantity data sets so that it is based upon the business condition of the Transportation Service Provider receiving the nomination. Make corresponding modifications to other data sets, including the addition of any necessary validation codes, as needed. Additionally, modify the nomination key in NAESB WGQ Standard No. 1.3.27, as appropriate, to reflect the change in the usage of Service Requester Contract. | Boardwalk Pipeline Partners, LP, Iroquois Gas Transmission System, L.P. and Kinder Morgan Inc | Recommendation | WGQ Request for Comments Due November 29,2016 Comments Submitted by L. MacDonald, Centra Gas Manitoba Inc. Comments Submitted by M. Burroughs, American Gas Association |
||||
R15007 | WGQ | Request to revise the Cover Page of the WGQ Base Contract (NAESB WGQ Standard No. 6.3.1) with additions regarding self-identification of counter parties to the contract. | Tennessee Valley Authority | Recommendation Attachment - Exhibit A |
WGQ Request for Comments Due November 25, 2015 Comments Submitted by J. Ryman, Encana Services Company Comments Submitted by David Portz PC Comments Submitted by M. Klyasheff, WEC Energy Late Comments Submitted by K. Sappenfield, WGQ Contracts Subcommittee Chair |
||||
R15006 | WGQ | Request regarding Rounding Standard for EPSQ Calculation. | Pacific Gas and Electric Company | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 25, 2016 |
WGQ Request for Comments Due November 27, 2015 | ||||
R15003 | WGQ | Request to add a new clause to add to the WGQ Base Contract (Standard No. 6.3.1) which conveys the concept of the following suggested (pro-forma) language: The parties to this Contract represent and warrant that at least one of the parties has a valid right to use this Contract, either through a contract purchase from NAESB or another valid acquisition method. | Jim Buccigross, 8760, Inc., on behalf of the NAESB Board Revenue Committee | Recommendation Attachment - Exhibit A Recommendation - Part 2 Part 2 Attachment - Exhibit A |
WGQ Request for Comments Due November 4, 2015 Comments Submitted by K. Sappenfield, Chair, WGQ Contracts Subcommittee Comments Submitted by David Portz PC Comments Submitted by M. Klyasheff, WEC Energy Group Comments Submitted by B. Hebenstreit, Southwestern Energy Comments Submitted by P. Lookadoo, International Energy Credit Association (IECA) Late Comments Submitted by K. Sappenfield, WGQ Contracts Subcommittee Chair WGQ Request for Comments (Recommendation - Part 2) Due April 26, 2016 |
||||
R15002 | WGQ | For NAESB WGQ Version 3.0 - Add Business Conditional (BC) data element �Waive Credit for Replacement Shipper� to NAESB WGQ Standard No. 5.4.24 - Offer | Dominion Transmission Inc. / Dominion Cove Point LNG LP | Recommendation | WGQ Request for Comments Due November 27, 2015 | ||||
2014 WGQ Annual Plan Item 6 | WGQ | Review Final Rules published by the Commodity Futures Trading Commission (CFTC) and implications to NAESB contracts. | WGQ Contracts Subcommittee | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 10/23/2014 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due September 11, 2014 Comments Submitted by R. Barry, NGSA Comments Submitted by P. Hughes, Southern Company |
||||
R14007 | WGQ | Requested Change to Wholesale Gas Quadrant Business Practice Standard 1.3.39 to accommodate a Transportation Service Provider's ability to offer enhanced nominations | T. Carlson for the Arizona Public Service Company, Salt River Project Agricultural Improvement and Power District, UNS Gas, Inc./Tucson Electric Power Company, Public Service Company of New Mexico, Arizona Corporation Commission | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 10/22/2015 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due October 13, 2015 Late Comments Submitted by P. Jones, SRP |
||||
2014 WGQ Annual Plan Item 11c | WGQ | Develop new standards and modify existing standards to support the timelines for timely, evening, ID1, ID2 and ID3 nomination cycles as specified in Attachment A of this plan and make corresponding changes where necessary to other standards such as those that support capacity release programs. The standards should be neutral on gas day start times; meaning that all references to the 9 am CCT start of the gas day should be removed. | WGQ BPS, WGQ IR/Technical | Recommendation - Part 1 - Business Standards Language Recommendation - Part 2 - Business Documentation and Implementation Guides |
WGQ Request for Comments Due August 18, 2014 Comments Submitted by K. Burch, Spectra Energy Corp Comments Submitted by A. Penner, Manitoba Hydro Comments Submitted by the American Gas Association Comments Submitted by T. Evey, Ameren Services Company Comments Submitted by A. Schafer, Duke Energy Comments Submitted by J. Sturm, ACES Comments Submitted by K. Daly on behalf of the Joint Parties listed - all of which are members of the Desert Southwest Pipeline Stakeholders Comments Submitted by C. Gold, Natural Gas Supply Association Comments Submitted by J. Phillips, ISO/RTO Council Comments Submitted by K. Daley, Interstate Natural Gas Association of America Comments Submitted by J. Phillips, Southwest Power Pool Comments Submitted by L. Ly, Kinetica Partners LLC Comments Submitted by C. Nicolay, Macquarie Energy LLC Comments Submitted by D. Davis, Williams Comments Submitted by J. Luner, Xcel Energy Services, Inc. |
||||
2014 WGQ Annual Plan Item 2 and Annual Plan Item 3 | WGQ | Sample Paper Review and Development of EBB Code Values | WGQ IR/Technical | Recommendation Attachment 1 - Additional and Nomination Related Standards Attachment 2 - Flowing Gas Related Standards Attachment 3 - Invoicing Related Standards Attachment 4 - Capacity Release Related Standards |
WGQ Request for Comments Due August 18, 2014 Comments Submitted by the WGQ Information Requirements Subcommittee Co-Chairs |
||||
2014 WGQ Annual Plan Item 10 | WGQ | Posting of Offers to Purchase Capacity (Order to Show Cause Issued March 20, 2014 � RM 14-442-000) | WGQ BPS, WGQ IR/Technical | Recommendation | WGQ Request for Comments Due August 18, 2014 Comments Submitted by the American Gas Association |
||||
2014 WGQ Annual Plan Item 8 | WGQ | Imbalance Trading � Elimination of Data Set Reference to EDI | WGQ BPS, WGQ IR/Technical | Recommendation | WGQ Request for Comments Due August 18, 2014 Comments Submitted by the WGQ IR/Technical Subcommittee Comments Submitted by the American Gas Association |
||||
R14006 | WGQ | Modify NAESB WGQ Standard Number 0.3.28 to clarify requirement | M. Schmitz, Northern Natural Gas | Recommendation | WGQ Request for Comments Due October 6, 2014 | ||||
R14005 | WGQ | Requesting Changes to Enhance Capacity Release Timeline to better coordinate Capacity Release with Gas-Electric Harmonization Timely Nomination Timeline | G. Lander, Skipping Stone | Withdrawn by Submitter - October 29, 2015 | |||||
2013 WGQ Annual Plan Item 7 | WGQ | Investigate and determine if changes to standards are needed to support adequate session encryption (SSL/TLS issues US-Cert Vulnerability Note VU#864643) | WGQ EDM | Recommendation NO ACTION TO BE TAKEN Recommendation as Approved by the WGQ Executive Committee on 02/20/2014 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due February 6, 2014 | ||||
R13011 | WGQ | Modify the EBB Creation Usage and the EBB/EDI Download Usage of data element Replacement Shipper Role Indicator from �M� to �C� in the NAESB WGQ Standard No. 5.4.24 � Offer based on whether the deal is prearranged and add conditions for both the Creation and Download. Additionally, modify the Usage from �M� to �C� in the NAESB WGQ Standard No. 5.4.26 � Award based on whether the data element was present in the creation of the Offer. | K. Van Pelt, Boardwalk Pipeline Partners, LP | Withdrawn by Submitter - December 5, 2013 | |||||
R13010 | WGQ | NAESB WGQ Version 2.1 � Add 2 data elements (SO) to Measured Volume Audit Statement � NAESB WGQ Standard No. 2.4.6 to be applied in Version 2.2 | D. Davis, Williams Gas Pipeline | Recommendation | WGQ Request for Comments Due October 15, 2014 | ||||
2013 WGQ Annual Plan Item 5.b | WGQ | Review and Analyze the Interpretations of Standards - Elimination of Interpretations and Corresponding actions | WGQ EC, WGQ BPS, IR/Technical, Contracts, EDM & Interpretations | Recommendation Attachment 1 - Standards Language Attachment 2 - Contracts FAQ Attachment 3 - Implementation Guides and Data Set Changes Recommendation - Part 2 |
WGQ Request for Comments Due October 22, 2013 | ||||
2013 WGQ Annual Plan Item 1.b | WGQ | Organize Standards Manuals for Ease of Use - Proposed modified or deleted standards as a result of development of matrix tool | WGQ IR/Technical | Recommendation Attachment 1 - Standards Language |
WGQ Request for Comments Due October 22, 2013 | ||||
2012 WGQ Annual Plan Item 14.a | WGQ | FERC Order No. 587-V issues and implications to NAESB standards - Address issues other than design capacity and modify standards as needed. | WGQ BPS | Recommendation | WGQ Request for Comments Due October 22, 2013 | ||||
R13009 | WGQ | For Version 2.0 and 2.1 NAESB WGQ Standard No. 2.4.4 Shipper Imbalance - Add Data Element �Operational Impact Area (OIA)� with a usage of Sender�s Option (SO) for all Imbalance Reporting Types. | WBI Energy Transmission, Inc. | Recommendation | WGQ Request for Comments Due April 22, 2014 | ||||
2013 WGQ Annual Plan Item 4.a | WGQ | Review minimum technical characteristics in Appendices B, C, and D of the WGQ QEDM Manual, and make changes as appropriate. (Reference NAESB Standard No. 4.3.59) | WGQ Electronic Delivery Mechanism (EDM) Subcommittee | Recommendation | WGQ Request for Comments Due September 16, 2013 | ||||
R13008 | WGQ | Add the data element �Capacity Type Location Indicator� to the Firm Transactional Reporting dataset, and four associated code values to the Offer, Bid, Award Download, and Transactional Reporting data sets. | Tennessee Gas Pipeline Company, L.L.C. | Recommendation | WGQ Request for Comments Due August 19, 2013 | ||||
R13007 | WGQ | Add the following Sender's Option (SO) data element (Replacement Shipper Contract Number (Repl SR K)) to NAESB WGQ Standard No. 5.4.26 Award Download. | Northern Natural Gas | Recommendation | WGQ Request for Comments Due August 19, 2013 | ||||
R13006 | WGQ | Requesting (846UPRD) Operational Capacity Data (873OACY) by Cycle Indicator via EDI | Skipping Stone | Recommendation | WGQ Request for Comments Due August 19, 2013 | ||||
R13005 | WGQ/REQ/RGQ | Modify WGQ/REQ/RGQ Internet Electronic Transport Examples, Version 2.0 | Oncor | Recommendation | Joint WGQ and RXQ Request for Comments Due September 16, 2013 | ||||
R13003 Attachment to R13003 |
WGQ | Modify WGQ Business Practice Standards Matrix to include additional fields | Quorum Business Solutions | Not a Request; Withdrawn | |||||
R13002 | WGQ | Add a new data element �Subject� to the NAESB WGQ Standard No. 5.4.16, System Wide Notices. | Questar Pipeline Company | Recommendation Recommendation R13002 as revised and approved by the WGQ Executive Committee on August 22, 2013 |
WGQ Request for Comments Due June 17, 2013 | ||||
2012 WGQ Annual Plan Item 14.b | WGQ | Address design capacity issues present in paragraph 30 of FERC Order No. 587-V3 | WGQ IR/Technical Subcommittee | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 18, 2013 Comments Submitted by D. Davis, Williams Gas Pipeline |
||||
2012 WGQ Annual Plan Item 1 | WGQ | Investigate how to make standards referencing, which may include reorganization, more user friendly for implementation. (Reorganize Standards Request) as per the WGQ 2012 Annual Plan Item 1 | WGQ IR/Technical Subcommittee | Recommendation Recommendation as Approved by the WGQ Executive Committee on 02/21/2013 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due February 13, 2013 | ||||
R12011 | WGQ | Add a new data element to the Operational Capacity data set. Add a new Sender�s Option (SO) data element Allocated Indicator Data to the NAESB WGQ Standard No. 0.4.2 Operational Capacity data set. | Transwestern Pipeline Company, LLC, Fayetteville Express Pipeline LLC, ETC Tiger Pipeline, LLC and Florida Gas Transmission Company LLC | Recommendation | WGQ Request for Comments Due January 6, 2014 | ||||
2012 WGQ Annual Plan Item 14a | WGQ | Modify NAESB WGQ Standard Nos. 4.3.4 and 10.3.2 as per the WGQ 2012 Annual Plan Item 14a | WGQ BPS Subcommittee | Recommendation | WGQ Request for Comments Due February 13, 2013 Comments Submitted by P. Connor, AGA |
||||
2012 WGQ Annual Plan Item 7.b | WGQ | Develop the NAESB Natural Gas Liquids Master Agreement according to the analysis completed in annual plan item 7.a | WGQ Contracts Subcommittee | Recommendation Attachment - NGL Master Agreement |
WGQ Request for Comments Due October 22, 2012 Comments Submitted by C. Metz, Enogex Comments Submitted by S. Strauss, LyondellBasell Comments Submitted by J. Lavery, Chervon Comments Submitted by T. Pantazis, ConocoPhillips Comments Submitted by E. Klecka, Targa Resources Supplemental Comments Submitted by C. Metz, Enogex |
||||
R12009 | WGQ | Add two Sender�s Option Data Elements to NAESB WGQ 5.4.22� Transactional Reporting � Interruptible Transportation. | Kinder Morgan Inc � On Behalf of All Pipelines Operated by Kinder Morgan Inc | Recommendation Recommendation as approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 | ||||
R12007 | WGQ | Modify NAESB WGQ Standard No. 5.3.70 to allow the use of Notice Type as an alternative to the Notice Type Abbreviation. | Williams Gas Pipeline | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 Comments Submitted by D. Davis, Williams Gas Pipeline and R. Hogge, Dominion Transmission |
||||
2012 WGQ Annual Plan Item 9 | WGQ | Investigate and determine if changes to standards are needed to support adequate session encryption (SSL/TLS issues US-Cert Vulnerability Note VU#864643) | WGQ EDM Subcommittee | Recommendation Recommendation as Approved by the WGQ Executive Committee on 08/28/2012 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due August 20, 2012 | ||||
2012 WGQ Annual Plan Item 5 | WGQ | Review minimum technical characteristics in Appendices B, C, and D of the WGQ QEDM Manual, and make changes as appropriate. (Reference NAESB Standard No. 4.3.59) | WGQ EDM Subcommittee | Recommendation Attachment 1: EDM Minimum Technical Review (redline) Attachment 2: EDM Minimum Technical Review (clean) |
WGQ Request for Comments Due August 20, 2012 Comments Submitted by D. Davis, Williams Gas Pipeline |
||||
2012 WGQ Annual Plan Item 4 | WGQ | Execute the plan for the development of meaningful error code values in all data sets to make them easier to understand on the TSPs� EBB web sites as compared to the X12 DISA error codes. | WGQ IR/Technical Subcommittee | Recommendation | WGQ Request for Comments Due August 20, 2012 | ||||
R12005 | WGQ | Add data element to Service Requester Level Charge/Allowance Invoice to NAESB WGQ Standard 3.4.4 | Northern Natural Gas | Recommendation Recommendation as approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 | ||||
2011 WGQ Annual Plan Item 7 / 2012 WGQ Annual Plan Item 8 | WGQ | Modify standards to remove location common code from NAESB WGQ standards. | WGQ IR/Technical Subcommittee | Recommendation - Part A Attachment 1: Additional Standards Attachment 2: Noms Related Standards Attachment 3: Flowing Gas Related Standards Attachment 4: Invoicing Related Standards Attachment 5: Capacity Release Related Standards Attachment 6: Location Data Download Recommendation - Part B - Interpretations |
WGQ Request for Comments Due June 11, 2012 | ||||
R12004 | WGQ | Add contact data elements to Withdrawal of Request for Imbalance. | Northern Natural Gas | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 Comments Submitted by D. Davis, Williams Gas Pipeline |
||||
R12003 | WGQ | Add contact detail data elements to Imbalance Trade datasets | Northern Natural Gas | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 Comments Submitted by D. Davis, Williams Gas Pipeline |
||||
R12002 | WGQ | Add the data element Releaser Contract Capacity Type in the Offer (WGQ Standard No. 5.4.24), Award Download (WGQ Standard No. 5.4.26), and Transactional Reporting � Capacity Release (WGQ Standard No. 5.4.20) datasets. | ETC Tiger Pipeline, LLC | ||||||
2012 WGQ Annual Plan Item 6 | WGQ | Review requirements and develop an addendum to the NAESB Base Contract for Federal Acquisition Regulations (FAR) and Government Contract Compliance (GCP) clauses. | WGQ Contracts Subcommittee | Recommendation Attachment 1: Government Acquisitions Provision Addendum (GAPA) Attachment 2: FAQ as Related to GAPA Recommendation as approved by the WGQ Executive Committee on May 3, 2012 (Members Accessible) Attachment 1: Government Acquisitions Provision Addendum (GAPA) as approved by the WGQ Executive Committee on May 3, 2012 (Members Accessible) Attachment 2: FAQ as Related to GAPA as approved by the WGQ Executive Committee on May 3, 2012 (Members Accessible) |
WGQ Request for Comments Due March 12, 2012 Comments Submitted by R. Parker, ExxonMobil Gas & Power Marketing Comments Submitted by J. Jarvis, Encana Late Comments Submitted by K. Sappenfield, WGQ Contracts Chairman (revised GAPA FAQs dated May 3, 2012) |
||||
R11021 | WGQ | Modify language of WGQ Standard No. 5.3.2 such that it meets the original intent and is consistent with Interpretations 7.3.15 and 7.3.46 | Group 8760 LLC | Recommendation Attachment 1 Attachment 2 Attachment 3 |
WGQ Request for Comments Due August 20, 2012 Comments Submitted by P. Connor on behalf of American Gas Association Comments Submitted by D. Davis, Williams Gas Pipeline |
||||
R11019 | WGQ | Develop a Natural Gas Liquids (NGL) Master Agreement similar to the NAESB Base Contract for Sale and Purchase of Natural Gas in an effort to increase the efficiency and decrease the costs of trading NGL commodities. | Williams Energy Resources LLC | ||||||
2011 WGQ Annual Plan Item 8.a | WGQ | Changes to the NAESB WGQ Standard Nos. 10.2.8 and 10.2.30 to support consistency with Retail and WEQ Activities. | Joint WGQ EDM/Contracts Subcommittees | Recommendation | WGQ Request for Comments Due November 7, 2011 | ||||
R11018 - Revised | WGQ | Delete data ordering standards and create a new data grouping standard | Natural Gas Pipeline Company of America LLC and Dominion Transmission Inc. | Recommendation | WGQ Request for Comments Due June 11, 2012 | ||||
R11017 | WGQ | Modify NAESB WGQ Standard No. 4.3.52 | Natural Gas Pipeline Company of America LLC | Recommendation | WGQ Request for Comments Due June 11, 2012 | ||||
R11016 | WGQ | Add a new data set, Swing Service Overtakes | Williams Gas Pipeline on behalf of Transcontinental Gas Pipe Line | Recommendation Recommendation as Approved by the WGQ Executive Committee on 08/28/2012 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due August 20, 2012 | ||||
2011 WGQ Annual Plan Item 7 | WGQ | Determine if location common codes as formulated are needed. If location common codes are needed, then determine if existing specifications are sufficient, or conversely, if not needed, develop plan for modifications to support removal of location common code from NAESB WGQ standards. | WGQ Business Practice Subcommittee | Recommendation | WGQ Request for Comments Due October 14, 2011 | ||||
2011 WGQ Annual Plan Item 6 | WGQ | WGQ Contracts Subcommittee | Recommendation Recommendation as Approved by the WGQ Executive Committee on 08/18/2011 NO ACTION TO BE TAKEN |
WGQ Request for Comments Due August 8, 2011 | |||||
R11013 - Revised | WGQ | Add new Nomination, Scheduled Quantity data elements to the standards. | Williston Basin Interstate Pipeline Company and Dominion Transmission Inc. | Recommendation Recommendation R11013 as revised and approved by the WGQ Executive Committee on August 22, 2013 |
WGQ Request for Comments Due July 11, 2013 | ||||
R11012 | WGQ | Add the data elements Up Activity Code, Down Activity Code, Up Transaction Type, Down Transaction Type to the Nominations (WGQ Standard No. 1.4.1) and Scheduled Quantity (WGQ Standard No. 1.4.5 Data Sets. | Spectra Energy | Recommendation Recommendation as revised and approved by the WGQ Executive Committee on February 21, 2013 |
WGQ Request for Comments Due February 13, 2013 | ||||
R11011 - Revised | WGQ | NAESB WGQ Standard Nos. 5.4.24: Offer � add a code value to the Business Conditional data element �Capacity Type Location Indicator� for capacity that is �Primary thru Storage�, NAESB WGQ Standard Nos. 5.4.20, 5.4.25 and 5.4.26 Transactional Reporting � Capacity Release, Bid and Award � add a date element that is Business Conditional �Capacity Type Location Indicator�. | Williston Basin Interstate Pipeline Company and Williams Gas Pipeline |
Recommendation | WGQ Request for Comments Due June 11, 2012 | ||||
R11010 | WGQ | Modify the data element �Minimum Acceptable Volumetric Commitment Quantity� and add a new data element for Minimum Acceptable Volumetric Commitment Quantity-Location. | Williston Basin Interstate Pipeline Company | Withdrawn by Submitter - September 9, 2011 | |||||
R11009 | WGQ | Modify the data element �Minimum Volumetric Commitment Quantity� and add a new data element for Minimum Volumetric Commitment Quantity-Location. Also, standard usage. | Williston Basin Interstate Pipeline Company | Withdrawn by Submitter - September 9, 2011 | |||||
R11008 | WGQ | Add one new data element �Life of Reserves Indicator� in the following Transaction Dataset | Enbridge (U.S.) Inc. | Recommendation Recommendation as approved by the WGQ Executive Committee on May 3, 2012 (Members Accessible) |
Request for Comments Due March 29, 2012 | ||||
R11007 | WGQ | Modify the Discount Indicator Code Value Description for Code Value 1 and 2 | Williston Basin Interstate Pipeline Company | Recommendation Recommendation as approved by the WGQ Executive Committee on February 23, 2012 (Members Accessible) |
Request for Comments Due December 12, 2011 | ||||
R11006 (MC11004) | WGQ | Enhance data element �Releaser Designation of Acceptable Bidding Basis� for Standard 5.4.24 - Offer | Alliance Pipeline L.P. | Will be processed as a Minor Correction | |||||
R11005 | WGQ | Enhance Standard 5.4.20 � Capacity Release, 5.4.24 � Offer , 5.4.25 � Bid, & 5.4.26 � Award Download | Alliance Pipeline L.P. | Withdrawn by Submitter - February 3, 2011 | |||||
R11004 (MC11001-04) | WGQ | Add Negotiated Non-Renewal Charge and AOS Charge data elements for Transactional Reports including Firm Transportation, Capacity Release and IT | Alliance Pipeline L.P. | Recommendation | WGQ Request for Comments Due August 11, 2011 | ||||
R11003 (MC11003) | WGQ | Enhance data element �Bidder Designation of Bidding Basis for Standard 5.4.26 � Award Download. | Alliance Pipeline L.P. | Will be processed as a Minor Correction | |||||
R11002 (MC11002) | WGQ | Enhance data element �Bidder Designation of Bidding Basis for Standard 5.4.25 � Bid | Alliance Pipeline L.P. | Will be processed as a Minor Correction | |||||
R11001 (MC11001) | WGQ | Enhance data element �Rate Form/Type Code� under 5.4.24 � Offer, 5.4.25 � Bids, 5.4.26 � Award Download | Alliance Pipeline L.P. | Will be processed as a Minor Correction | |||||
R10011 | WGQ | Change the length of the GS02 �Application Sender�s Code� and GS03 �Application Receiver�s Code� from the current 12 characters to the ANSI standard 15 characters. | Kinder Morgan Inc. | Withdrawn by Submitter - November 27, 2012 | |||||
R10010 | WGQ | Add data elements �Nominated Receipt Point Quantity� and �Nominated Delivery Point Quantity� to the (shipper) Scheduled Quantity document. | Kinder Morgan Inc. | Recommendation | WGQ Request for Comments Due October 22, 2013 | ||||
R10009 | WGQ | Add a new data element to Standard 5.4.21 (Transactional Reporting � Firm Transportation). | Iroquois Gas Transmission System, L.P. | Recommendation | WGQ Request for Comments Due March 11, 2011 | ||||
R08028/2010 WGQ Annual Plan Item 3/2009 WGQ Annual Plan Item 4/2008 WGQ Annual Plan Item 3 | WGQ | Eliminate Standards 5.4.4. (Replacement Capacity) | El Paso Natural Gas | Recommendation Rec/Attachment 1 Offer Rec/Attachment 2 Bid Rec/Attachment 3 Award Download Rec/Attachment 4 Withdrawal Download Rec/Attachment 5 Business Documentation Rec/Attachment 6 Principles/Standards/Interpretations as modified in redline Recommendation with revised attachments as approved by the WGQ EC on August 19, 2010 Rec/Attachment 1 Offer revised by the WGQ EC on August 19, 2010 Rec/Attachment 2 Bid revised by the WGQ EC on August 19, 2010 Rec/Attachment 3 Award Download Rec/Attachment 4 Withdrawal Download Rec/Attachment 5 Business Documentation revised by the WGQ EC on August 19, 2010 Rec/Attachment 6 Principles/Standards/Interpretations as modified in redline revised by the WGQ EC on August 19, 2010 |
WGQ Request for Comments Due August 13, 2010 Comments Submitted by D. Davis, Williams Gas Pipeline Additional Comments Submitted by D. Davis, Williams Gas Pipeline Late Comments Submitted by D. Davis, WGQ IR/Technical Subcommittees |
||||
R10007 | WGQ | Change the Offer, Bid and Award downloads to have the ability to communicate multiple indexed rates for a given offer. | Tennessee Gas Pipeline | Recommendation | WGQ Request for Comments Due February 2, 2011 | ||||
R10006 (MC10024) | WGQ | Add Additional Reduction Reason code value(s) to NAESB WGQ Standard 1.4.6 | Dominion Transmission | Will be processed as a Minor Correction | |||||
R10005 | WGQ | Modify 5.3.26 to eliminate possible disputes over consequences associated with Bid Basis� not selected by the Releasing Shipper | Natural Gas Pipeline of America | Recommendation | WGQ Request for Comments Due August 11, 2011 | ||||
2010 WGQ Annual Plan Item 5 | WGQ | WGQ EDM Subcommittee | Recommendation | WGQ Request for Comments Due June 24, 2010 | |||||
R09014, 2010 WGQ Annual Plan Item 6 | WGQ | WGQ BPS and EDM Subcommittees | Recommendation | WGQ Request for Comments Due June 24, 2010 | |||||
R10004 | WGQ | Change the usage of the element Ending Time from Mandatory to Business Conditional in the Nominations dataset; Change the usage of the elements Beginning Time and Ending Time from Mandatory to Business Conditional in the Pre-determined Allocation dataset and Change the usage of Beginning Time (or equivalent element for the specific document below) and Ending Time (or equivalent element for the specific document below) from Mandatory to Senders Option in the Request for Confirmation, Confirmation Response, Scheduled Quantity and Scheduled Quantity for Operator, Allocation, Shipper Imbalance, Measurement Information, Measured Volume Audit Statement, and Transportation / Sales Invoice documents. | Natural Gas Pipeline of America | Recommendation Recommendation Recommendation as approved by the WGQ Executive Committee on February 23, 2012 (Members Accessible) |
WGQ Request for Comments Due September 3, 2010 No Comments Received Request for Comments Due December 12, 2011 |
||||
R10003 | WGQ | This request proposes the addition of two new data elements �Discount Begin Date� and �Discount End Date� in the following Transaction Datasets: Transactional Reporting � Capacity Release, NAESB WGQ Standard No. 5.4.20 and Transactional Reporting � Firm Transportation, NAESB WGQ Standard No. 5.4.21. | Williams Gas Pipeline | Recommendation | WGQ Request for Comments Due November 1, 2010 | ||||
R10001 | WGQ | Update the NAESB Wholesale Gas Quadrant (WGQ) Quadrant Electronic Delivery Mechanism (QEDM) Manual to add the ability to provide Informational Postings reports downloads in a CSV file format. | Enbridge, Kern River Gas Transmission and Spectra Energy Transmission | Recommendation | WGQ Request for Comments Due August 5, 2010 | ||||
R09025 | WGQ | Create a new WGQ EDM standard | 8760 Inc. | Recommendation | WGQ Request for Comments Due June 24, 2010 | ||||
R09022 | WGQ | Change Charge Type conditionality in NAESB WGQ Standard No. 3.14.1 Transportation/Sales Invoice | Natural Gas Pipeline Company of America | Recommendation | Request for Comments Due June 17, 2010 | ||||
R09021 | WGQ | Add a S/O data element to NAESB WGQ Standard no. 3.4.1 � Transportation/Sales Invoice | Natural Gas Pipeline Company of America and Williams Gas Pipeline |
Recommendation | Request for Comments Due June 17, 2010 | ||||
R09020 (MC10004) | WGQ | Add additional Charge Type and Service Requestor Level Charge/Allowance Amount Descriptor code values to NAESB WGQ Standard No. 3.4.1 | Natural Gas Pipeline Company of America | Will be processed as a Minor Correction | |||||
R09019 Attachment to R09019 |
WGQ | Create two additional Allocation Transaction Type codes to improve the reporting of Pathed Non-Threaded levels of detail in the Allocation Statement | NGPL | ||||||
R09018 | WGQ | Add a new MA data element to the Nominations dataset for Model �T� called �Path Rank� | NGPL | Recommendation | WGQ Request for Comments Due February 2, 2011 | ||||
R09017 Attachment to R09017 |
WGQ | Develop a new ISDA Gas Confirmation Form for use with the ISDA Gas Annex based on the current Confirmation Form under the NAESB Base Contract for Sale and Purchase of Natural Gas | WGQ Contracts Subcommittee | Recommendation Attachment: Exhibit A |
Request for Comments Due November 23, 2009 | ||||
R09016 | WGQ | Add Rate Schedule data element to the Bid Upload and Bid Download datasets | Northern Natural Gas | Recommendation | WGQ Request for Comments Due November 1, 2010 | ||||
R09014 | WGQ | Create a section/heading under Informational Postings called Regulatory to include all filings made to the FERC | Tennessee Valley Authority | Recommendation | WGQ Request for Comments Due June 24, 2010 | ||||
R07009, 2008 Annual Plan Item 3 and 2009 Annual Plan Item 2a | WGQ | WGQ Contracts Subcommittee | Recommendation - R07009, 2008 WGQ Annual Plan Item 3 and 2009 WGQ Annual Plan Item 2a Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Clean) Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Redline) |
Request for Comments Due October 26, 2009 Comments Submitted by D. Gussow, FPL |
|||||
R09013 | Add a Bi-directional Indicator to NAESB WGQ Version 1.8 standard 5.4.13-Operationally Available and Unsubscribed Capacity data set. | Natural Gas Pipeline Company of America | |||||||
R09012 | Add the data elements �No-Notice Release Type� and �No-Notice Release Type Description� with BC usage for EBB to the data sets: 5.4.1 Offer Download, 5.4.7 Offer Upload and 5.4.9 Offer Upload Notification | Boardwalk Pipeline | Withdrawn by Submitter - October 22, 2010 | ||||||
R09011 | WEQ/WGQ | Change the term Power Plant Operator to Power Plant Gas Coordinator in WEQ-011 | Midwest ISO | Recommendation 2009 WEQ Annual Plan Item 5(a)(2),5(i)/R08004/R09011 Attachment WEQ-011 (Redline) Attachment WEQ-011 (Clean) WGQ Recommendation R09011 WGQ Recommendation R09011 as revised by the EC on June 4, 2010 Attachment WEQ-011 as revised by the EC on June 4, 2010 (Redline) Attachment WEQ-011 as revised by the EC on June 4, 2010 (Clean) |
WEQ Request for Comments Due November 2, 2009 Comments Submitted by the NAESB Standards Review Subcommittee Comments Submitted by M. Kulas, Consumers Energy Company Late Comments in Response to the Consumers Energy Comments Submitted by the WEQ and WGQ BPS Co-Chairs WGQ Request for Comments Due April 29, 2010 |
||||
R09010 | Add the data elements �Location Term Start Date� and �Location Term End Date� with BC usage for EBB to the data sets: 5.4.1 Offer Download, 5.4.7 Offer Upload and 5.4.9 Offer Upload Notification | Boardwalk Pipeline | Withdrawn by Submitter - October 22, 2010 | ||||||
R09009 | Add four business conditional data elements to the imbalance trading NAESB WGQ data sets 2.4.11�2.4.16. | Kinder Morgan Energy Partners | Recommendation | WGQ Request for Comments Due August 11, 2011 | |||||
R09008 | Add two business conditional data elements to the Offer Upload, NAESB WGQ Standard 5.4.7 for (1) Responsibility for Out of Path Overrun and (2) Out of Path Location Changes. These data elements should be conditional in standards 5.4.1 and 5.4.3. | Natural Gas Pipeline Company of America | Recommendation | WGQ Request for Comments Due August 11, 2011 | |||||
2008 WGQ Annual Plan Item 8 and 2009 WGQ Annual Plan Item 7 | WGQ | WGQ EDM Subcommitee | Recommendation | Request for Comments Due June 3, 2009 | |||||
2009 WGQ Annual Plan Item 9 | WGQ | WGQ EDM Subcommitee | Recommendation | Request for Comments Due April 13, 2009 Comments Submitted by I. King, Dominion Transmission, Inc. |
|||||
R09007 | Update the NAESB Wholesale Gas Quadrant (WGQ) Quadrant Electronic Delivery Mechanism (QEDM) Manual to delete Netscape as a supported browser and add Mozilla Firefox as another browser option | Williams Gas Pipeline, Northern Natural Gas, El Paso - Tennessee Gas/El Paso - EPNG | Recommendation | Request for Comments Due June 3, 2009 | |||||
R09006 | Add a new data element �Contract� in the following Transaction Datasets for the NAESB WGQ Version 1.8 release: NAESB WGQ Standard No. 3.4.2, Payment Remittance and NAESB WGQ Standard No. 3.4.4, Service Requester / Charge Allowance Invoice | Williams Gas Pipeline | Recommendation | Request for Comments Due February 26, 2010 | |||||
R09005 Attachment to R09005 |
Revise Appendix D of the QEDM document to remove references to UDP 1604 for Secure ICA. | NGPL | Recommendation | Request for Comments Due June 3, 2009 | |||||
R09004 Attachment to R09004 |
Revise existing NAESB WGQ Standards 4.3.23, 4.3.26, 4.3.32 and 4.3.33, and add one new WGQ Standard 4.3.xx to conform existing standards to the new eTariff standards, ratified by NAESB membership on April 4, 2008 and adopted in the Commission�s Order No. 714, Electronic Tariff Filings, Final Rule, issued on September 19, 2008. | Panhandle Eastern Pipe Line Company | Recommendation | Request for Comments Due June 11, 2009 | |||||
R09002 | Add two new ActiveX control browser plug-ins, Microsoft Reporting Services Client Print Control and Microsoft Silverlight to the NAESB Wholesale Gas Quadrant (WGQ) Quadrant Electronic Delivery Mechanism (QEDM) Manual in Appendix B and Appendix C. | Enbridge, Inc. | Recommendation | Request for Comments Due June 3, 2009 | |||||
R09001 | Add two data elements to the Transactional Reporting �Interruptible Transportation Document (5.4.22) | Natual Gas Pipeline Company of America | Recommendation | Request for Comments Due January 20, 2010 Comments Submitted by I. King, Dominion Transmission |
|||||
R08028 | Eliminate Standards 5.4.4. (Replacement Capacity) | El Paso Natural Gas | Recommendation Rec/Attachment 1 Offer Rec/Attachment 2 Bid Rec/Attachment 3 Award Download Rec/Attachment 4 Withdrawal Download Rec/Attachment 5 Business Documentation Rec/Attachment 6 Principles/Standards/Interpretations as modified in redline Recommendation with revised attachments as approved by the WGQ EC on August 19, 2010 Rec/Attachment 1 Offer revised by the WGQ EC on August 19, 2010 Rec/Attachment 2 Bid revised by the WGQ EC on August 19, 2010 Rec/Attachment 3 Award Download Rec/Attachment 4 Withdrawal Download Rec/Attachment 5 Business Documentation revised by the WGQ EC on August 19, 2010 Rec/Attachment 6 Principles/Standards/Interpretations as modified in redline revised by the WGQ EC on August 19, 2010 |
WGQ Request for Comments Due August 13, 2010 Comments Submitted by D. Davis, Williams Gas Pipeline Additional Comments Submitted by D. Davis, Williams Gas Pipeline Late Comments Submitted by D. Davis, WGQ IR/Technical Subcommittees |
|||||
R08026 - PDF format R08026 - Word format |
Modify NAESB WGQ Standard No. 4.3.23 to clarify placement of TSP reporting obligations to provide easy access to other posted information, not required by the Commission on a generic basis, but posted as a result of tariff requirements or voluntarily. | National Fuel Gas Distribution | Recommendation | Request for Comments due January 5, 2009 Comments Submitted by M. Shepard, Mewbourne Oil Company Comments Submitted by M. Novak, National Fuel |
|||||
R08024 | Add a new validation code for Offer Upload Quick Response, Add the error code � Missing Special Terms and Misc Notes | Boardwalk Pipelines | Recommendation Recommendation Attachment 1 - including TIBPs, Sample Papers, Data Dictionaries and Code Values Dictionaries Recommendation Attachment 2 - Data Element Quick Guides Recommendation Attachment 3 - Technical Change Log | Request for Comments due May 11, 2009 | |||||
R08023 (MC08023) | WGQ | Add Surcharge Codes for Capacity Release Transactions to clarify the surcharge types available for transactions. | Enbridge Energy Partners | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
2007 WGQ Annual Plan Item 6A & 2008 WGQ Annual Plan Item 3 | WGQ | Updated Physical Gas Annex to ISDA Agreement, based on the recently completed revised NAESB Base Contract for Sale and Purchase of Natural Gas (NAESB Standard 6.3.1, 9/5/06) | WGQ Contracts Subcommitee | Recommendation Recommendation - R07009, 2008 WGQ Annual Plan Item 3 and 2009 WGQ Annual Plan Item 2a Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Clean) Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Redline) |
Request for Comments due August 27, 2008 Cover Letter to Comments Submitted by R. Ficken, Williams Gas Marketing Comments Submitted by R. Ficken, Williams Gas Marketing Cover Letter to Late Comments Submitted by K. Sappenfield, Chair, WGQ Contracts Subcommittee Late Comments Submitted by K. Sappenfield, Chair, WGQ Contracts Subcommittee Late Comments Submitted by R. Patino, ISDA Request for Comments Due October 26, 2009 |
||||
R08022 (MC08022) | WGQ | Add Rate ID codes to Transactional Reporting datasets. | Northern Natural Gas | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08021 | WGQ | Implement a minor adjustment to the Measured Volume Audit Statement to allow for 40 instances of the MEA segment in the QTY loop | El Paso Natural Gas | Assigned to WGQ Technical Subcommittee on 9/8/08 | |||||
R08020 | WEQ and WGQ | Provide for enhanced granularity for public utilities in identifying critical operational flow orders, WEQ and WGQ | Tennessee Valley Authority, Southwest Power Pool, ISO New England, PJM Interconnection and Midwest ISO | Assigned to WEQ BPS and WGQ BPS on 9/8/08 | Recommendation | Request for Comments due January 29, 2010 | |||
R08019 | WGQ | Change the usage for the data element �Maximum Tariff Rate� from mandatory to sender�s option within the dataset Award Download. | Boardwalk Pipeline Partners | Assigned to WGQ Business Practices Subcommittee (BPS) on 9/8/08 | Recommendation Recommendation Attachment 1 - including TIBPs, Sample Papers, Data Dictionaries and Code Values Dictionaries Recommendation Attachment 2 - Data Element Quick Guides Recommendation Attachment 3 - Technical Change Log | Request for Comments due May 11, 2009 | |||
R08018 (MC08018) | WGQ | Add �Reservation and Commodity� as a new Rate Identification Code within the dataset Transactional Reporting � Firm Transportation. | Boardwalk Pipeline Partners | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08017 (MC08017) | WGQ | Add the transaction type �Reservation/Enhanced Hourly Flow� to NAESB WGQ Standard 3.4.1 Transportation/Sales Invoice and Add the code values (MIS) Miscellaneous and (SST) State Sales Tax for the data element �Service Requester Level Charge/Allowance Amount Descriptor� to NAESB WGQ Standard 3.4.1 Transportation/Sales Invoice and NAESB WGQ Standard 3.4.4 Service Requester/Charge Allowance Invoice | Boardwalk Pipeline Partners | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08016 (MC08016) | WGQ | Add Reduction Reason code to Operator Scheduled Quantity to support existing business practices and to more accurately define decreased quantities for shippers and operators. | Northern Natural Gas | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08015 | WGQ, REQ and RGQ | Streamline current TPA by removing the Exhibits from the agreement and relegate such information as contained in the Exhibits to operational worksheet(s). | Kinder Morgan Inc. | Assigned to WGQ Contracts Subcommittee and the WGQ Electronic Delivery Mechanisms Subcommittee jointly, along with the Retail BPS should there be any changes needed to the retail documents on 9/8/08 | Recommendation Exhibit A - Trading Partner Agreement (Clean) Exhibit A - Trading Partner Agreement (Redline) Exhibit B - Trading Partner Worksheet Exhibit C - Frequently Asked Questions (2009 TPA & TPW) Exhibit D - Internet ET (Clean) Exhibit D - Internet ET (Redline) Exhibit E - WGQ QEDM (Clean) Exhibit E - WGQ QEDM (Redline) Exhibit F - Retail QEDM (Clean) Exhibit F - Retail QEDM (Redline) |
Request for Comments Due April 13, 2009 WGQ/REQ/RGQ Supplemental Notice to Request for Formal Comments Due April 13, 2009 Comments on TPA Submitted by S. Meyers, ANR Pipeline Company Additional Comments on TPA Submitted by S. Meyers, ANR Pipeline Company Comments on TPW Submitted by S. Meyers, ANR Pipeline Company Comments on TPW Submitted by D. Forth, TransCanada U.S. Pipelines Central Comments Submitted by I. King, Dominion Transmission, Inc. |
|||
WGQ 2007 Annual Plan Item 7c and WGQ 2008 Annual Plan Item 4c | WGQ | Consider whether changes to existing intra-day schedules would benefit all shippers, and provide better coordination between gas and electric scheduling. (FERC Order No. 698 issued 6-25-07, Docket Nos. RM05-5-001 and RM96-1-027 as related to the NAESB reports submitted in Docket No. RM05-28-000) | Recommendation | Request for Comments due July 2, 2008 Comments Submitted by D. Chezar, National Grid Gas Delivery Companies Comments Submitted by L. Pennock, Salt River Project Comments Submitted by D. Petersen, Pacific Gas & Electric Company Comments Submitted by D. Kijowski, PSEG Energy Resources and Trade LLC Comments Submitted by B. Gray, Arizona Corporation Commission Comments Submitted by V. Crockett, Tennessee Valley Authority Comments Submitted by W. Scharfenberg, New Jersey Natural Gas Company Joint Comments Submitted by K. Daly for the Arizona Public Service Company, The Boeing Company, El Paso Electric, ISO New England, Inc., Midwest Independent Transmission System Operator, Inc., Missouri Public Service Commission, New York Independent System Operator, Old Dominion Electric Cooperative, PJM Interconnection, L.L.C., Salt River Project Agricultural Improvement and Power District, Southwest Power Pool, Tennessee Valley Authority, Tucson Electric Power Co., UNS Gas, Inc. and Virginia Power Energy Marketing, Inc. Comments Submitted by A. Clair, Old Dominion Electric Cooperative Joint Comments Submitted by M. Arnaout for Interested LDCs: BGE, ConEdison, National Fuel, National Grid, New Jersey Natural, NiSource, PSEG, Southern California and Washington Gas Light Comments Submitted by S. Tomalty, FPL Group Comments Submitted by G. Donohue, Independent Power Producers of New York Comments Submitted by M. Doyle, BG Energy Merchants, LLC and Dynegy Marketing and Trade Supplemental Comments Submitted by K. Daly, Arizona Public Service Company Comments Submitted by C. Sherman, New England Power Generators Association Comments Submitted by M. Novak, National Fuel Gas Distribution Late Comments Submitted by J. Cashin, the Electric Power Supply Association |
|||||
R08014 (MC08014) | WGQ | Create a new Nominations Transaction Type code value to support Operational Sales and Operational Purchases for Nominations and all related documents where Transaction Type appears. | Kinder Morgan Energy Partners | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08013 (MC08013) | WGQ | Create a new Nominations Transaction Type code value to support Wheeling service on Rockies Express Pipeline LLC for Nominations and all related documents where Transaction Type appears. | Kinder Morgan Energy Partners | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R08012 (MC08012) | WGQ | Add 2 detail (contract) level code values to Validation Code and Message elements in Nomination Quick Response dataset to generate an error message when nominated quantity is below EPSQ. | Northern Natural Gas | Assigned to WGQ Information Requirements Subcommittee on 9/8/08 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
WGQ 2007 Annual Plan Item 7b and WGQ 2008 Annual Plan Item 4b | WGQ | Recommendation Recommendation Part 2 - Technical Implementation |
Request for Comments due May 2, 2008 Comments Submitted by D. Rudd, New Jersey Natural Gas Company Comments Submitted by G. Schoepp, Williston Basin Interstate Pipeline Company Request for Comments on Recommendation Part 2 due July 7, 2008 |
||||||
WGQ 2007 Annual Plan Item 7a and WGQ 2008 Annual Plan Item 4a | WGQ | Recommendation Recommendation Revised by the WGQ EC on June 25, 2008 Recommendation Recommendation Attachment 1 - including TIBPs, Sample Papers, Data Dictionaries and Code Values Dictionaries Recommendation Attachment 2 - Data Element Quick Guides Recommendation Attachment 3 - Technical Change Log | Request for Comments due May 2, 2008 Comments Submitted by P. Love, NGPL Request for Comments due May 11, 2009 |
||||||
R08010 (MC09003(B)) | WGQ | Add the data element �Cycle Indicator� in the Transaction Datasets for NAESB WGQ Standard No. 5.4.1, Offer Download (C), NAESB WGQ Standard No. 5.4.2, Bid Download (C), NAESB WGQ Standard No. 5.4.3, Award Download (C), and NAESB WGQ Standard No. 5.4.7, Offer Upload (BC) and add corresponding error/warning codes in the Transaction Data Set for NAESB WGQ Standard No. 5.4.8, Offer Upload Quick Response | Williams Gas Pipeline | Assigned to WGQ BPS on 3/19/08 | Recommendation | Request for Comments due July 22, 2009 Comments Submitted by the WGQ IR/Technical Chairs |
|||
R08009 (MC08009) | WGQ | Add a validation code value (Sub-detail) in NAESB WGQ Standard No. 1.4.2, Nomination Quick Response and add a code value for the data element Reduction Reason Code in NAESB WGQ Standard No. 1.4.5, Scheduled Quantity | Williams Gas Pipeline | Assigned to WGQ IR on 3/19/08 March 30, 2009 - Will now be processed as a Minor Correction |
Recommendation | Request for Comments due November 5, 2008 | |||
R08008 | WGQ | Develop customer security administration standards | Florida Power & Light Company | Assigned to WGQ BPS on 3/19/08 | Recommendation | Comments Submitted by P. Love, NGPL Request for Comments due August 16, 2010 |
|||
2007 WEQ Annual Plan Item 5 and 2007 WGQ Annual Plan Item 8 | WEQ and WGQ | Develop business practices as needed to support the e-Tariff program including submittal of tariffs and metadata. (Docket No RM01-5-000) |
Recommendation Recommendation Attachment | Request for Comments Due February 27, 2008 Comments Submitted by L. Morrison, ISO New England Comments Submitted by eTariff Chairs Attachment to Comments Submitted by eTariff Chairs Comments Submitted by M. McCain, Spectra Energy Comments on Shared Tariff Filing Issue by New England Participating Transmission Owners Comments Submitted by P. Brown, PJM Cover Letter to Comments Submitted by the ISO Group Comments Submitted by the ISO Group Comments Submitted by H. Bartholomot, EEI Comments Submitted by D. Mihalik, AOPL Comments Submitted by M. Regulinski, Dominion Resources Services |
3/4/08 approved by the EC via notational ballot. | Ratified on 4/4/08 | Final Action Posted on 4/7/08 | ||
R08007 | WGQ | Modify WGQ Standard 4.3.16 regarding download formats | Natural Gas Pipeline Company of America | Assigned to WGQ BPS and WGQ EDM on 2/19/08, Assigned to WGQ EDM on 10/20/08 | Recommendation | Request for Comments due January 19, 2009 | |||
R08006 | WGQ | Add a new data field to the Measured Volume Audit Statement dataset | Boardwalk Pipeline Partner, LP | Assigned to WGQ BPS on 2/19/08 | Recommendation | Request for Comments due June 17, 2009 | |||
2007 WGQ Annual Plan Item 3 and Retail 2007 Annual Plan Item 9 - Develop or amend WGQ technical standards, as appropriate, to address the DOE Sandia National Laboratories 2006 surety assessment findings and recommendations (WGQ)/Address issues raised in the Department of Energy�s Sandia National Laboratories on NAESB technical standards and respond to the surety assessment finding and recommendations (REQ/RGQ) | WGQ and REQ/RGQ | 2007 WGQ Annual Plan Item 3 and Retail 2007 Annual Plan Item 9 - Develop or amend WGQ technical standards, as appropriate, to address the DOE Sandia National Laboratories 2006 surety assessment findings and recommendations (WGQ)/Address issues raised in the Department of Energy�s Sandia National Laboratories on NAESB technical standards and respond to the surety assessment finding and recommendations (REQ/RGQ) | Recommendation Recommendation Revised by the WGQ EC 05/15/08 and approved by the Retail EC's on 6/3/08 |
Request for Comments due January 14, 2008 | |||||
2007 WGQ Annual Plan Item 4 and Retail 2007 Annual Plan Item 6 - Prepare a joint analysis for AS2 and AS3 protocols as compared to the NAESB IET | WGQ and REQ/RGQ | 2007 WGQ Annual Plan Item 4 and Retail 2007 Annual Plan Item 6 - Prepare a joint analysis for AS2 and AS3 protocols as compared to the NAESB IET | Recommendation | Request for Comments due November 6, 2007 | |||||
R07018 | WGQ | Add Code Values to NAESB WGQ Transactional Reporting Data Sets WGQ Standard 5.4.20 � Transactional Reporting Capacity Release, WGQ Standard 5.4.21 � Transactional Reporting � Firm Transportation and WGQ 5.4.22 � Transactional Reporting � Interruptible Transportation | Spectra Energy Transmission | Recommendation Recommendation Attachment 1 - including TIBPs, Sample Papers, Data Dictionaries and Code Values Dictionaries Recommendation Attachment 2 - Data Element Quick Guides Recommendation Attachment 3 - Technical Change Log | Request for Comments due May 11, 2009 | ||||
R07017 | WGQ | Add 2 Warning Messages to the NAESB WGQ Data Sets - WGQ Standard 1.4.1 - Nominations and WGQ Standard 1.4.2 � Nomination Quick Response | Spectra Energy Transmission | Recommendation | Request for Comments due November 5, 2008 | ||||
R07016 | WGQ | Add two code values for the Reduction Reason data element in the Confirmation Response, Scheduled Quantity, and Scheduled Quantity for Operator datasets to identify pipeline emergency maintenance and pipeline facility installation | Transwestern Pipeline Company | Recommendation | Request for Comments due November 5, 2008 | ||||
R07015 | WGQ | Request that NAESB add a new internet browser plug-in, Adobe Flash Player, to the NAESB Wholesale Gas Quadrant (WGQ) Quadrant Electronic Delivery Mechanism (QEDM) Manual in APPENDIX B | Williams Gas Pipeline - Northwest Pipeline | Recommendation | Request for Comments due January 14, 2008 | ||||
R07014 | WGQ | Move the data errors and warnings from the Confirmation Response to the Quick Response dataset. | El Paso Corporation | Recommendation | Request for Comments due May 7, 2009 Comments Submitted by I. King, Dominion Transmission, Inc. |
||||
R07012 | WGQ | Add 4 new meter type code values to the Measured Volume Audit Statement | Texas Gas Transmission | Recommendation | Request for Comments due November 5, 2008 | ||||
R07011 | WGQ | Add code values to Charge Type element in Transportation/Sales Invoice dataset | Northern Natural Gas | Recommendation R96121A-23/R07011 | Request for Comments due November 5, 2008 | ||||
R07009 | WGQ | Review and update the Physical gas Annex to ISDA Agreement, based on the recently completed revised NAESB Base Contract for Sale and Purchase of Natural Gas (NAESB Standard 6.3.1, 9/5/06) | Cheniere Marketing Inc. | Recommendation - R07009, 2008 WGQ Annual Plan Item 3 and 2009 WGQ Annual Plan Item 2a Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Clean) Recommendation Attachment 1 - 2009 Amendment Addendum to the ISDA North American Gas Annex - Exhibit A (Redline) |
Request for Comments Due October 26, 2009 Comments Submitted by D. Gussow, FPL |
||||
2007 WGQ Annual Plan Item 5 | WGQ | 2007 WGQ Annual Plan Item 5 - Develop FAQs for the updated NAESB Base Contract for Sale and Purchase of Natural Gas dated September 5, 2006. |
Recommendation | Request for Comments due July 1, 2007 Comments Submitted by P. Precht, Baltimore Gas and Electric Company Comments Submitted by K. Van Pelt, Panhandle Eastern Pipe Line Comments Submitted by R. Denton, BP Energy Company Comments Submitted by E. Gillaspie, Coral Energy Resources, L.P. |
|||||
R07008 | WGQ | Add the Bidder Contact E-mail Address data element and the Bidder Contact Phone Number to the Award Download dataset | Texas Gas Transmission | Recommendation | Request for Comments due June 17, 2009 | ||||
2007 WGQ Annual Plan Item 6 | WGQ | 2007 WGQ Annual Plan Item 6 - Update the NAESB WGQ Canadian Addendum related to the UPDATE of the NAESB WGQ Base Contract for Sale and Purchase of Natural Gas (NAESB WGQ Standard 6.3.1) dated September 5, 2006 and other industry comments proposed during the discussions. | Recommendation | Request for Comments due April 11, 2007 Comments Submitted by M. Shepherd, Mewbourne Oil Company |
|||||
R07006 | WGQ | Add Reduction Reason code to Operator Scheduled Quantity | Northern Natural Gas | Assigned to WGQ IR on 5/1/07 | Recommendation | Request for Comments due November 5, 2008 | |||
R06023 | WGQ | Add new Reduction Reason code values for Scheduled Quantity, Scheduled Quantity for Operator and any other applicable NAESB datasets. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation Recommendation as Revised by the WGQ EC on November 6, 2008 - (redline) Recommendation as Revised by the WGQ EC on November 6, 2008 - (clean) |
Request for Comments due November 5, 2008 Comments Submitted by R. Young, Boardwalk Pipeline Partners, LP |
|||
R06022 (MC06022) | WGQ | Add new Location Quantity Type Indicator code values for Offer Download, Bid Download, Award Download, Replacement Capacity, Offer Upload, Offer Upload Notification, Operationally Available, Unsubscribed Capacity, Bid Upload, Transactional Reporting � Capacity Release, Firm Transportation, and Interruptible Transportation. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R06021 | WGQ | Add new code values for Transaction Type in Nomination, Scheduled Quantity, Transportation/Sales Invoice and any other applicable NAESB datasets. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06020 | WGQ | Add new code values for Pre-determined Allocation Quick Response, standard 2.4.2, at the detail level. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06019 | WGQ | Add new code values for Pre-determined Allocation Quick Response, standard 2.4.2, at the sub-detail level. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06018 | WGQ | Add new code values for Confirmation Response Quick Response, standard 1.4.2, at the detail level. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06017 | WGQ | Add new code values for Nomination Quick Response, standard 1.4.2, at the sub-detail level. | Texas Gas Transmission, LLC | Assigned to WGQ IR on 10/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06016 | WGQ | Expand the processing definition for "Submit" (found in standard 4.3.69) to include the sending of records to the TSP for processing from the Form as well as the Matrix. | Texas Gas Transmission, LLC | Assigned to WGQ BPS on 10/23/06, Assigned to WGQ EDM on 10/20/08 | Recommendation | Request for Comments due January 19, 2009 | |||
R06015 (MC06015) | WGQ | Add code values for the Rate Identification Code data element in the Offer Download, Bid Download, Award Download, Offer Upload, Offer Upload Quick Response, Offer Upload Notification, Bid Upload and Bid Upload Quick Response datasets. | Duke Energy Gas Transmission | Assigned to WGQ IR on 9/5/06 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R06014 | WGQ | Add code values for the Rate Identification Code data element in the Transactional Reporting datasets. | Duke Energy Gas Transmission | Assigned to WGQ IR on 9/5/06 | Recommendation | Request for Comments due November 7, 2007 | |||
R06013 | WGQ | Add code values for the Charge Type data element in the Transportation/Sales Invoice dataset. | Duke Energy Gas Transmission | Assigned to WGQ IR on 9/5/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R06012 | WGQ | Add two (2) new code values for the data element �Transaction Type� into Scheduled Quantity and Invoice Datasets. | Williams Gas Pipeline | Assigned to WGQ IR on 8/1/06 | Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
R06011 | WGQ | Add 3 detail (contract) level and 1 sub detail (nomination) level code values to Validation Code and Message elements in Nomination Quick Response dataset. | Northern Natural Gas | Assigned to WGQ IR on 8/11/06 | Recommendation | Request for Comments due November 7, 2007 | |||
R06009 | WGQ | Develop a standard that would enhance the communications between Transportation Service Providers (TSP) and their customers pertaining to nominations related deadlines. | Tennessee Gas Pipeline Company | Assigned to WGQ BPS on 5/18/06 | |||||
R06008 | WGQ | Modify WGQ Business Practice Standard 4.3.90 to clarify that all available data at representative points should be made available by Transmission Service Providers. | National Fuel Gas Distribution Corporation | Assigned to WGQ BPS on 5/18/06 | Recommendation Revised Recommendation |
Request for Comments due December 1, 2006 Comments - WGQ Pipeline Minority Report - Submitted by K. Van Pelt, Panhandle Eastern Comments Submitted by K. Burch, Duke Energy Gas Transmission Comments Submitted by D. Sharo, NiSource Gas Transmission and Storage Companies Comments Submitted by M.Novak, National Fuel Gas Distribution Corporation Late Additional Comments Submitted by W. Griffith, WGQ Pipeline Segment EC Members and EC Alternates Request for Comments on Revised Recommendation due May 8, 2007 |
|||
R06007 | WGQ | Add Reduction Reason code to Scheduled Quantity, Operator Scheduled Quantity and Confirmation Response. | Northern Natural Gas | Assigned to WGQ IR on 5/18/06 | Recommendation | Request for Comments due November 7, 2007 | |||
R06005 | WGQ | Add "Special terms and Miscellaneous notes" as SO data element to the Transactional Reporting - Interruptible Transportation data set (5.4.22) | El Paso Eastern Pipelines | Assigned to WGQ BPS on 5/18/06 | |||||
R06004 | WGQ, RGQ and REQ | Minor revisions to EDI Trading Partner Agreement Standard 6.3.3 | Columbia Gas Transmission Corp. | Assigned to WGQ Contracts and Retail Contracts on 1/23/06 | |||||
R06003 (MC06003) | WGQ | Add "Compression Use Surcharge" code value for "Surcharge Identification Code" data element. | Northern Plains Natural Gas Company, LLC | Assigned to WGQ IR on 1/23/06 March 30, 2009 - Will now be processed as a Minor Correction |
|||||
R06001 | WGQ | Add two Nomination Transaction Type codes to support the nomination and tracking of the shipping entity or producing entity on the interconnecting facility where title tracking is employed by the TSP. | Kinder Morgan | Assigned to WGQ IR on 1/23/06 | Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
R05030 | WGQ | Modify specified transaction sets to allow for variable monthly release quantities, variable monthly bid quantities and variable monthly award quantities, subject to variable monthly minimum offer quantities. | El Paso Natural Gas Company | Assigned to WGQ BPS on 1/23/06 | |||||
R05029 | WGQ | Add new Adjustment Type Code Value to 2.4.3 Allocation and 2.4.4 Shipper Imbalance datasets. | Northern Natural Gas | Assigned to WGQ IR on 1/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R05028 Attachment 1 to R05028 |
WGQ | Add two new Allocation Transaction Type codes to improve the reporting of Pathed Non-Threaded levels of detail in the Allocation Statement. | Kinder Morgan Inc. | Assigned to WGQ IR on 1/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R05027 | WGQ | Add two new data elements to the Nomination and Scheduled Quantity data sets that 1) permit the service requestor to identify a specified path for the nominated transaction, and 2) provide shippers the ability to identify the specific month of an imbalance they may want to clear. | El Paso Natural Gas Company | Assigned to WGQ BPS on 1/23/06 | Recommendation Recommendation as approved by the WGQ Executive Committee on February 23, 2012 (Members Accessible) |
Request for Comments Due December 12, 2011 | |||
R05025 | WGQ | Add new Adjustment Type Code Value to 2.4.4 Shipper Imbalance dataset | Northern Natural Gas | Assigned to WGQ IR on 1/23/06 | Recommendation | Request for Comments due November 5, 2008 | |||
R05024 | WGQ | Add code values to Charge Type element in Transportation/Sales Invoice dataset. | Northern Natural Gas | Assigned to WGQ IR on 9/19/05 | Recommendation | Request for Comments due November 5, 2008 | |||
R05023 | WGQ | Add new Adjustment Type Code Value to 2.4.4 Shipper Imbalance dataset. | Northern Natural Gas | Assigned to WGQ IR on 9/19/05 | Recommendation | Request for Comments due November 5, 2008 | |||
R05022 | WGQ | Standard to limit the use of special characters in a Package ID | El Paso Eastern Pipelines | Assigned to WGQ BPS on 9/19/05 | |||||
R05021 | WGQ | Modify existing and/or develop additional standard(s) for displaying Entity codes when D-U-N-S Numbers do not exist. | El Paso Eastern Pipelines | Assigned to WGQ BPS on 9/19/05 | |||||
2005 WGQ Annual Plan Item 4 | WGQ | 2005 WGQ Annual Plan Item 4 | Electronic Delivery Mechanism (EDM) Subcommittee | Recommendation | Request for Comments due August 19, 2005 |
||||
R05017 | WGQ | Delete or change the usage of the data element Rate Form/Type Code from datasets 5.4.20, 5.4.21 and 5.4.22 | El Paso Eastern Pipelines | Assigned to WGQ BPS on 7/8/05 | Recommendation | Request for Comments due November 7, 2007 | |||
R05015 | WGQ | Add language to the NAESB WGQ Implementation Guide(s) discussing the use of discretionary verbs. | National Fuel Gas Distribution Corporation | Recommendation | Request for Comments due June 15, 2006 | ||||
R05014 | WGQ | Review the current NAESB WGQ's "Base Contract for Purchase and Sale of Natural Gas" for possible update and revisions to reflect current industry practices and applicable general terms and conditions. | EnCana Gas Marketing and NAESB WGQ Contracts Subcommittee | Assigned to WGQ Contracts on 7/8/05 | Recommendation | Request for Comments due June 1, 2006 Comments Submitted by K.Sappenfield, EnCana Marketing (USA) Comments Submitted by M.Wolosek, Nicor Gas Company Comments Submitted by D.Gussow, Florida Power & Light Comments Submitted by J.Schuch, General Motors Comments Submitted by K. Burch, Duke Energy Gas Transmission Texas, also supported by El Paso Pipelines Comments Submitted by A. Do, Merrill Lynch Commodities, Inc. Comments, Document 1 - Submitted by A. Zaguli, ExxonMobil Gas & Power Marketing Document 2 - Submitted by A. Zaguli, ExxonMobil Gas & Power Marketing Comments Submitted by W. Roberts, The Peoples Natural Gas Company, d/b/a Dominion Peoples Comments Submitted by J. McNeill, Salt River Project Comments Submitted by S. Butler, Consolidated Edison of New York, Inc. Comments Submitted by R. Denton, BP Energy Company Late Comments Received 6/5/06 - Submitted by M.Novak, National Fuel Gas Distribution Corporation Late Additional Comments Received 6/6/06 - Submitted by S.Butler, Consolidated Edison Company of New York, Inc. Late Comments Received 6/6/06 - Submitted by E.Tanos, Washington Gas Light Company Late Additional Comments Received 6/13/06 - Submitted by D.Gussow, Florida Power & Light Late Additional Comments Received 6/26/06 - Submitted by M.Novak, National Fuel Gas Distribution |
|||
R05012 | WGQ | Add Reduction Reason code to Scheduled Quantity, Operator Scheduled Quantity and Confirmation Response. | Northern Natural Gas | Assigned to WGQ IR on 7/8/05 | Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
R05011 | WGQ | Add new Adjustment Type Code Value to 2.4.3 Allocation and 2.4.4 Shipper Imbalance datasets | Northern Natural Gas | Assigned to WGQ IR on 7/8/05 | Recommendation | Request for Comments due November 5, 2008 | |||
R05010 | WGQ | Add code values to Validation Code and Message elements in Nomination Quick Response dataset | Northern Natural Gas | Assigned to WGQ IR on 7/8/05 | Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
R05006 | WGQ | Add code value to Validation Code and Message elements in Nomination Quick Response dataset. | Northern Natural Gas | Assigned to WGQ IR on 4/20/05 | Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
Revised R05005 | WGQ | Add new transaction type codes to the Nomination 1.4.1, Shipper Scheduled Quantity 1.4.5, and Transportation Sales Invoice 3.4.1 data sets. | Northern Natural Gas | Assigned to WGQ IR on 4/20/05 | Recommendation Revised Recommendation from WGQ IR submitted on 1/31/08 |
Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
|||
R05003 | WGQ | Amend WGQ standard 3.4.1 to add new code value for special fuel surcharges | Florida Gas Transmission Company | Assigned to WGQ IR on 4/20/05 | Recommendation | Request for Comments due November 5, 2008 | |||
WGQ 2005 Annual Plan Item 3 | WGQ | WGQ 2005 Annual Plan Item 3 Please also see WGQ 2004 Annual Plan Item 7 |
WGQ EDM | Recommendation QEDM Manual |
Request for Comments due April 8, 2005 Comments Submitted by R. Mills, ChevronTexaco |
||||
2005 WGQ Annual Plan Item #8 FERC Order 2004 (Affiliate Order) | WGQ | 2005 WGQ Annual Plan Item #8 FERC Order 2004 (Affiliate Order) | NAESB WGQ Business Practices Subcommittee | Recommendation | Request for Comments due March 24, 2005 |
||||
R04041 | WGQ | Amend and add new WGQ data elements in pre-determined allocation dataset | Northern Natural Gas | Assigned to WGQ IR on 1/10/05 | Recommendation | Request for Comments due November 5, 2008 | |||
R04040 | WGQ | Develop new WGQ data element in nomination quick response dataset | Northern Natural Gas | Assigned to WGQ IR on 1/10/05 Withdrawn by Submitter - February 8, 2006 |
|||||
R04039 | WGQ | Develop new WGQ data element in transportation/sales invoice dataset | Northern Natural Gas | Recommendation | Request for Comments due November 5, 2008 | ||||
R04038 | WGQ | Amend WGQ standard 5.4.13 to indicate whether an overrun quantity has been scheduled. | Transwestern Pipeline Company LLC | Recommendation - 5/17/2010 Attachment 1 - Data Dictionary Attachment 2 - EDI Technical Recommendation - 7/22/2010 Attachment 1 - Data Dictionary - 7/22/10 Attachment 2 - EDI Technical - 7/22/10 Attachment 3 - EDISM G873OACY - 7/22/10 Attachment 4 - EDISM G873UNSC - 7/22/10 |
Request for Comments Due June 17, 2010 Comments Submitted by D. Field, Southern Star Central Gas Pipeline |
||||
R04033 | WGQ | Amend WGQ standards 2.4.3 and 2.4.4 to add new allocation and shipper imbalance data elements. | Northern Natural Gas | Recommendation | Request for Comments due November 5, 2008 | ||||
R04031 | WGQ | Amend WGQ Standard 4.3.59 to change the timing of the technical review process. | Williams Gas Pipeline and Latitude Technologies | Recommendation | WGQ Request for Comments Due June 11, 2012 | ||||
R04030 Attachment to R04030 |
WGQ, REQ, RGQ | Develop new WGQ data element for transaction tracking or duplicate detection. | TDTWG - ERCOT Working Group | Recommendation | Request for Comments due May 27, 2005 | ||||
R04029 | WGQ | Develop new WGQ data element to permit nomination of multiple locations in single data set. | Gas Transmission Northwest Corporation | ||||||
WGQ 2004 Annual Plan Item 7 | WGQ | WGQ 2004 Annual Plan Item 7 Please also see WGQ 2005 Annual Plan Item 3 |
WGQ EDM | Recommendation Recommendation Attachment |
Request for Comments due November 12, 2004 |
||||
R04028 Attachment to R04028 |
WGQ | Amend WGQ Standard 6.3.1, Base Contract for Natural Gas, to allow alternative cover page. | Florida Power and Light Company | Revised Recommendation Recommendation Attachment |
Request for Comments due June 13, 2005 |
||||
R04027 (MC04027) | WGQ | Develop new code values for Capacity Type Location Indicator data element. | Texas Gas Transmission | March 30, 2009 - Will now be processed as a Minor Correction | |||||
R04026 | WGQ | Amend WGQ Standard 1.4.1 to add new storage limitation code value. | Northern Natural Gas | Recommendation | Request for Comments due November 7, 2007 | ||||
R04025 | WGQ | Amend WGQ Standards 1.4.1, 1.4.5 and 3.4.1 to add new imbalance adjustment clarification code value. | Northern Natural Gas | Withdrawn by Submitter - August 26, 2005 | |||||
R04024 | WGQ | Amend WGQ Standard 3.4.1 to add new charge type code data element. | Northern Natural Gas | Recommendation | Request for Comments due November 5, 2008 | ||||
R04023 | WGQ | Amend WGQ Standards to add new reduction reason code data element. | Northern Natural Gas | Recommendation | Request for Comments due November 7, 2007 | ||||
R04022 (Word Format) |
WGQ | Amend WGQ Standards 1.4.5 and 1.4.6 to allow new reduction reason codes. | El Paso Western Pipelines | Recommendation Recommendation Revised by the WGQ EC on Nov 8, 2007 |
Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
||||
R04021 (Word Format) |
WGQ, WEQ | Develop standards for daily operational communications between pipelines and power plants | Natural Gas Pipeline Co. of America, CrossCountry Energy and Salt River Project | Recommendation Recommendation Revised by the WEQ/WGQ ECs on May 31, 2005 Recommendation R04021-A WGQ: Gas/Electric Operational Communications Technical Implementation | Request for Comments due May 25, 2005 Comments Submitted by B. Kedrowski, We Energies Comments Submitted by B. Gray, El Paso Electric Company Comments Submitted by M. Shepard, Mewbourne Oil Company Comments Submitted by G. Brown, California ISO Comments Submitted by L. Ell, Entergy Comments Submitted by J. Smith, Entergy Services, Inc. Gas Group Comments Submitted by K. York, Tennessee Valley Authority Comments Submitted by M. Desselle, American Electric Power Comments Submitted by J. Lewis, American Gas Association Comments Submitted by L. Crowley, NJR Companies Comments Submitted by K. Van Pelt, Pipeline Segment Comments Submitted by K. Burch, Duke Energy Corporation Comments Submitted by G. Ogenyi, Conectiv Comments Submitted by P. Larger, Progress Energy Carolinas Request for Comments on R04021-A due July 8, 2005 |
||||
R04019 (Word Format) |
WGQ | Review the draft International Swaps & Derivatives Association, Inc. (ISDA) Gas Annex to the ISDA Master Agreement (Gas Annex) for possible adoption as WGQ standard. | EnCana Gas Marketing (USA) Inc. | Recommendation ISDA Gas Annex Model Form User's Guide for the Model ISDA Gas Annex |
Request for Comments due November 17, 2004 |
||||
R04018 | WGQ | Amend WGQ Standard 1.3.60 and Dataset 1.4.4 to permit two new data elements. | Iroquois Gas Transmission System, LP | Withdrawn by Submitter - July 20, 2006 | |||||
R04017 | WGQ, REQ, RGQ | Modify WGQ Standard 6.3.3, Trading Partner Agreement, to allow its application in both retail and wholesale markets. | National Fuel Gas Distribution | Recommendation Recommendation Cover Letter Recommendation Modified 3/4/05 by the REQ/RGQ/WGQ EC |
Request for Comments due February 11, 2005 Comments Submitted by J. Minneman, PPLSolutions Comments Submitted by K. Farley, ERCOT Comments Submitted by M. Edwards, Dominion Virginia Power Comments Submitted by M. Novak, National Fuel Gas Distribution |
||||
R04016 | WGQ, WEQ | Develop a standard definition for Energy Day. | KeySpan Utility Services and Duke Energy Gas Transmission | Withdrawn by Submitter - February 27, 2006 Withdrawl Letter |
|||||
R04015 | WGQ | Add new data element to WGQ Capacity Release standards. | Texas Gas Transmission | Withdrawn by Submitter - June 29, 2004 | |||||
R04014 | WGQ | Amend the WGQ Standard 2.4.6 dataset, Measured Volume Audit Statement. | Northern Natural Gas | Recommendation | Request for Comments due May 26, 2009 | ||||
R04012 | WGQ | Amend the WGQ Standard 2.4.6 dataset, Measured Volumne Audit Statement. | Northern Natural Gas | Recommendation | Request for Comments due November 5, 2008 | ||||
WGQ Annual Plan Item 7, RGQ Annual Plan Item 12, REQ Annual Plan Item 14 | WGQ, RGQ, REQ | WGQ Annual Plan Item 7, RGQ Annual Plan Item 12, REQ Annual Plan Item 14 | REQ & RGQ TEIS and WGQ EDM | Recommendation Revised Recommendation as approved by the Retail ECs on 5/5/04 Revised Recommendation as approved by the Retail and WGQ ECs on 5/6/04 |
Request for Comments due April 28, 2004 Comments Submitted by Dominion |
||||
2004 WGQ Annual Plan Item #2 FERC Order 2004 (Affiliate Order) | WGQ | 2004 WGQ Annual Plan Item #2 FERC Order 2004 (Affiliate Order) | NAESB WGQ Business Practices Subcommittee | Recommendation Revised Recommendation as Approved by the WGQ EC on 5/6/04 |
Request for Comments due April 16, 2004 Comments Submitted by the Pipeline Segment |
||||
R04010 | WGQ | Add new data element to WGQ Capacity Release standards. | Natural Gas Pipeline of America | ||||||
R04009 | WGQ | Add new data element to WGQ Capacity Release standards. | Natural Gas Pipeline of America | Withdrawn by Submitter - February 3, 2004 | |||||
R04008 | WGQ | Add new data element to WGQ Capacity Release standards. | Natural Gas Pipeline of America | ||||||
R04004 | WGQ | Add new data element to WGQ standard 3.4.2, Invoicing. | Williams Gas Pipeline | Recommendation | Request for Comments due November 5, 2008 | ||||
R04003 | WGQ | Add new data element to WGQ standard 3.4.1, Invoicing. | Williams Gas Pipeline | Recommendation | Request for Comments due June 17, 2009 | ||||
R04002 | WGQ | Add 2 new data elements to WGQ standards 3.4.1 and 3.4.4, Invoicing. | Williams Gas Pipeline | Recommendation | Request for Comments due November 5, 2008 | ||||
R04001 | WGQ | Add new data element to WGQ standards 2.4.4 dataset, Shipper Imbalance. | Williams Gas Pipeline | Recommendation | Request for Comments due November 5, 2008 | ||||
R03036 | WGQ | Conform WGQ capacity release release standards 5.3.zD to FERC policy in RP03-545. | KeySpan | Withdrawn by Submitter - September 18, 2006 | Recommendation | Request for Comments due June 15, 2006 | |||
R03035 Attachment to R03035 |
WGQ | (A) Establish web-based reporting of existing gas quality paramaters, (B) standardize methodologies for calculating gas quality paramaters, and (C) determine the need for gas quality standards. | Florida Power & Light Company | Recommendation - Revised by the WGQ EC on 9/16/04 R03035B Recommendation |
Request for Comments due September 13, 2004 Comments Submitted by Mirant Comments Submitted by Constellation Generation Group Comments Submitted by Williston Basin Interstate Pipeline Company Comments Submitted by Mewbourne Oil Company Request for Comments (R03035B) due May 9, 2006 |
||||
R03034 | WGQ | Modify WGQ Dataset 1.4, nominations data mapping, to allow for Model type to be sent at a detailed level. | El Paso Eastern Pipelines and ANR Pipeline | Withdrawn by Submitter - 4/7/04 | |||||
R03033 | WGQ | Amend WGQ Base Contract to include an alternative dispute resolution agreement as a special provision. | American Arbitration Association | Revised Recommendation | Request for Comments due June 13, 2005 |
||||
R03032 | WGQ | Change existing data elements of NAESB WGQ Transactional Reporting - Firm Transportation Standard 5.4.21 | National Fuel Gas Distribution Corporation | Recommendation | Request for Comments due November 7, 2007 | ||||
R03031 R03031 - Revised November 20, 2003 | REQ, RGQ, WEQ, WGQ | Investigate and review possible modifications to the WGQ Intraday Nominations, Confirmation Scheduling, and Gas Day standards, including possible standards for coordination of wholesale electric and wholesale gas scheduling. | Tennessee Valley Authority | Interim Report Final Report |
|||||
R03030 | WGQ | Add two new transaction type codes to the Nomination 1.4.1, Shipper Scheduled Quantity 1.4.5, and Transportation Sales Invoice 3.4.1 data sets. | Northern Natural Gas | Recommendation | Request for Comments due August 19, 2005 |
||||
R03029 | WGQ | Add a new Notice Type to System-Wide Notices Standard 5.4.16 to support firm capacity including subscribed ROFR Capacity. | Northern Border Pipeline Company | Recommendation Recommendation Revised by the WGQ EC on Nov. 8, 2007 |
Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
||||
R03028 | WGQ | Add a reduction reason code to Scheduled Quantity, Operator Scheduled Quantity and Confirmation Response. | Northern Natural Gas | Recommendation | Request for Comments due November 7, 2007 | ||||
R03027 | WGQ | Add a mutually agreeable data element - Nomination Segment Type - in the transaction specific data group of the Nomination and Scheduled Quantity datasets. | SunGard Energy Systems | Withdrawn by Submitter - December 4, 2013 | Recommendation | Request for Comments due November 5, 2008 | |||
R03026 | WGQ | Add a mutually agreeable data element - Overlap Priority - in the Offer Upload, Offer Download, Notification and Award datasets. | SunGard Energy Systems | Withdrawn by Submitter - April 3, 2013 | |||||
R03025 | WGQ | Add a new notice type - Rates and Charges - to NAESB WGQ Standard 4.3.29. | El Paso Eastern Pipelines | Recommendation | Request for Comments due November 7, 2007 | ||||
R03024 | WGQ | Add code values for the Charge Type data element in the Transportation/Sales Invoice (3.4.1). | Northern Natural Gas | Withdrawn by Submitter - August 26, 2004 | |||||
R03023 | WGQ and RGQ | Adopt XML File Format as a new industry standard for exchange of natural gas custody transfer measurement data. | PGAS Systems | ||||||
R03022 | WGQ | Reinstate the Transaction Types of 09 - Imbalance Transfer and 11 - Storage Inventory Transfer. | Columbia Gas Transmission Corp. | Recommendation | Request for Comments due August 19, 2005 |
||||
R03021 | WGQ | Create a new Standard that indicates that unless otherwise denoted, all times contained with the NAESB WGQ Standards are Central Clock Time. | National Fuel Gas Distribution Corp. | Recommendation | Request for Comments due November 7, 2007 | ||||
R03020 | WGQ | Develop a new defined term/definition for Applicable Regulatory Authority and review NAESB WGQ Standards to make corresponding changes. | National Fuel Gas Distribution Corp. | Recommendation | Request for Comments due November 7, 2007 | ||||
R03019 | WGQ | Add a New Reduction Reason Code - Underperformance Confirming Party Reduction (UPR) - at Receipt Location. | El Paso Western Pipelines | Recommendation | Request for Comments due August 19, 2005 |
||||
R03016 | WGQ | Add a new code value - Corrected / Updated - for Contract Status to provide the ability to identify when the contract data as reported on the transactional reports has been corrected or updated. | Williams Gas Pipeline | Recommendation Recommendation Revised by the WGQ EC on Nov. 8, 2007 |
Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
||||
R03015 | WGQ | Modify the usage of the Downstream Rank data element in the threaded segment of the pathed non-threaded model in WGQ Standard 1.4.1 from Not Used to Mutually Agreeable. | TransCanada PipeLines Limited | ||||||
R03012 | WGQ | Modifications to NAESB WGQ Transactional Reporting - Interruptible Transportation Standard 5.4.22 to enhance the display of interruptible data at the Sender's Option, including the additional of new data elements, changes to existing data elements, and the addition of new code values. | El Paso Corporation | Recommendation | Request for Comments due November 7, 2007 | ||||
R03011 | WGQ | Modifications to NAESB WGQ Transactional Reporting - Firm Transportation Standard 5.4.21 to enhance the display of firm data at the Sender's Option, including the addition of new data elements, changes to existing data elements, and the addition of new code values. | El Paso Corporation | Recommendation | Request for Comments due November 7, 2007 | ||||
R03010 | WGQ | Modifications to the NAESB WGQ Transactional Reporting - Capacity Release Standard 5.4.20 to enhance the display of capacity release data sets at the Sender's Option, including modifications to existing data elements and new data elements. | El Paso Corporation | Revised Recommendation | Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
||||
R03009 | WGQ | Add a Transactional category to the Informational Posting under NAESB WGQ Standard 4.3.21 and the following subcategories to NAESB WGQ Standard 4.3.23: Transactional Firm, Interruptible, Capacity Release. | El Paso Corporation | Recommendation | Request for Comments due November 13, 2006 | ||||
R03008 | WGQ | Request a new mutually agreeable data element - Nominations Intra-day Indicator - to be added to the Nominations data set. | El Paso Eastern Pipelines | Revised Recommendation Recommendation 2 |
Revised Request for Comments due May 11, 2005 Request for Comments due August 19, 2005 |
||||
R03006 R03006 Attachment 1 - Gas Daily R03006 Attachment 2 - Natural Gas Intelligence Bid Week R03006 Attachment 3 - NGI Daily Price Index R03006 Attachment 4 - Platts Gas Market Report |
WGQ | Set standards names, definitions and regional classifications for the natural gas trading points most commonly used in the pricing tables appearing in industry publications. | Intelligence Press Inc. | Withdrawn by Submitter | |||||
R03005 | WGQ | Add code values for the Service Code data element in the Transportation /Sales Invoice (3.4.1) | Northern Natural Gas | Recommendation | Request for Comments due November 13, 2006 | ||||
R03004 | WGQ | Request a new code value, Exceed Family of Contracts MDQ, for the data element Reduction Reason that will be used with the NAESB Scheduled Quantity data sets. | El Paso Eastern Pipelines | Recommendation | Revised Request for Comments due May 11, 2005 |
||||
2003AP5 - 2003 Annual Plan Item 5 |
WGQ | Modify the minimum technical characteristics found in Appendices C, D and E of the EDM Manual, in accordance with NAESB WGQ Annual Plan Item 5 and NAESB WGQ Standard 4.3.59 | NAESB 2003 WGQ Annual Plan | Recommendation | |||||
2003AP6 - 2003 Annual Plan Item 6 |
WGQ | 2003AP6 - 2003 Annual Plan Item 6 |
NAESB 2003 WGQ Annual Plan | Recommendation Recommendation 2 Recommendation - Revised November 2003 Recommendation - Revised November 6, 2003 by the EC |
|||||
R03003 | WGQ | Modify the minimum technical characteristics found in Appendices C, D and E of the EDM Manual, in accordance with NAESB WGQ Annual Plan Item 5 and NAESB WGQ Standard 4.3.59 | NAESB WGQ EDM Subcommittee | Withdrawn by Submitter | |||||
R03002 | WGQ | Review NAESB WGQ Version 1.6 Standards Booklets and Implementation Guides to remove references to actions and dates that have already passed. | National Fuel Gas Distribution Corporation | Recommendation | |||||
R03001 | WGQ | Request two new data elements be added to the Request for Confimation, Confirmation Response and Scheduled Quantity for Operator. The new data elements would be used at the same level as the Location Data and would be used to define a limit on the total amount of capacity that could be confirmed as delivery or receipt. | El Paso Western Pipelines | Recommendation | Request for Comments due November 7, 2007 | ||||
R02012 | WGQ | Modify the NAESB WGQ Capacity Release Standards and data sets to incorporate the October 1, 2002 reinstatement of the price cap on capacity release transactions. | KeySpan | Recommendation | |||||
R02011 | WGQ | Add code values for NAESB WGQ Standard 2.4.3 - Allocation, NAESB WGQ Standard 2.4.4 - Shipper Imbalance. | Williams Gas Pipeline | Recommendation | Request for Comments due November 7, 2007 | ||||
R02010 | WGQ | Add Path Balancing Reduction to the NAESB Confirmation Response (1.4.3), the NAESB Scheduled Quantity (1.4.5), and NAESB Scheduled Quantity for Operator (1.4.6). | Gulf South Pipeline Company, LP | Recommendation | Request for Comments due August 19, 2005 |
||||
R02009 | WGQ | Add new reduction reasons for the Scheduled Quantity (1.4.5) and Scheduled Quantity for Operator (1.4.6). | CMS Panhandle Pipeline Companies | ||||||
R02008 | WGQ | Add new transaction types in the Nomination (1.4.1) and Scheduled Quantity (1.4.5) data sets. | CMS Panhandle Pipeline Companies | Recommendation | Request for Comments due November 13, 2006 | ||||
R02007 | WGQ | Add new data element 'Notes Codes' and two related codes for the Invoicing data sets (3.4.1). | Tennessee Gas Pipeline | Recommendation | Request for Comments due November 7, 2007 | ||||
R02006 | WGQ | Add a code value for the Nomination Quick Response (1.4.2). | Enron Transportation Services Company | Recommendation | Revised Request for Comments due May 11, 2005 |
||||
2000AP9 - Order 637 Transactional Reporting |
WGQ | Implement 2000 GISB Annual Plan Item 9 regarding FERC Order 637, specifically action items VIII, IX & XIII. | GISB 2000 Annual Plan | Recommendation | |||||
Executive Committee - Ongoing | WGQ | Make various changes to the NAESB EDM Manual to update the "Minimum Technical Characteristics" for NAESB Web Sites. | NAESB EDM Subcommittee | Recommendation | |||||
R02005 | WGQ | Add a New Business Conditional data element and code values for a Rights to Amend Primary Point indicator in the Capacity Release Data Sets. | ANR Gas Pipeline | Recommendation Recommendation 2 |
|||||
R02004 | WGQ | Add new code values for the discount indicator in the Capacity Release Data Sets. | ANR Gas Pipeline | Recommendation | Request for Comments due May 10, 2006 | ||||
R02003 | WGQ | Add a new Capacity Release data element - Discount Indicator. | Tennessee Gas Pipeline Companies | Recommendation | Request for Comments due May 10, 2006 | ||||
R02002 | WGQ | Development of an industry-wide timeline to allow for recalls and renominations at the Intra-Day 1 and Intra-Day 2 nomination cycles. | KeySpan | Recommendation Recommendation 2 Recommendation 3 |
|||||
R02001 | WGQ | Strengthen the FTA Agreement to record that all properly executed FTA Agreements have resulted in payment. | U.S. Department of Energy and Visage Energy | ||||||
R01021 | WGQ | Add for Code Values for the Nomination Scheduled Quantity, Pre-determined Allocation, Allocation, Shipper Imbalance, and Transportation/Sales Invoice data sets. | Questar Pipeline Company | Recommendation | |||||
R01020 | WGQ | Add an identifier for 'XML' to the list of possible identifiers for the EDI/EDM spcification. |
Systrends, Inc. | Recommendation | |||||
R01019 | WGQ | Add a new header element, REFNUM, to the EDI/EDM specification. | Systrends, Inc. | Recommendation | |||||
R01018 | WGQ | Add code values for the Transaction Type data element. | ANR Pipeline | Recommendation Recommendation Attachment 1 Recommendation Attachment 2 Recommendation Attachment 3 Recommendation Attachment 4 |
Request for Comments due February 2, 2005 | ||||
R01017 | WGQ | Add a Date Time Period Format Qualifier for seasonal Start Date and Seasonal End Date. | Enron Transportation Services Company | Recommendation Recommendation - Revised by WGQ Executive Committee on 2/23/06 |
Request for Comments due February 22, 2006 | ||||
R01016 - Revised | WGQ | Replace the requirement to use proprietary PGP 2.6.6 compliant products with open standard for PGP, called OpenPGP. | Systrends, Inc. | Recommendation | |||||
R01015 | WGQ | Add two Reduction Reason code values to the Confirmation Response, Scheduled Quantity and Scheduled Quantity for Operator datasets. | Enron Transportation Services Company | Withdrawn by Submitter | |||||
R01014 | WGQ | Add elements to the Transportation/Sales Invoice and the Service Requester Level Charge/Allowance Invoice. | Williams Gas Pipeline | Withdrawn by Submitter | |||||
R01013 | WGQ | Add a code value description to the Reduction Reason in the Scheduled Quantity and the Scheduled Quantity for Operator. | Williams Gas Pipeline | Recommendation | Revised Request for Comments due May 11, 2005 |
||||
R01012 | WGQ | Modify the data dictionaries to reflect indented data items to be used by developers of EBB implementations of the affected datasets. | Williams Gas Pipeline | Withdrawn by Submitter - 5/7/04 | |||||
R01011 | WGQ | Add a warning message for the data element Validation Code in the Pre-determined Allocation Quick Response (2.4.2) data set. | CMS Panhandle Pipeline Companies | Recommendation | Request for Comments due May 11, 2005 |
||||
R01010 | WGQ | Add Reduction Reason code values to the Confirmation Response, Scheduled Quantity and Scheduled Quantity for Operator standards to be used to communicate a reduction in nominated quantities. | Enron Transportation Services Company | Recommendation | Request for Comments due August 19, 2005 |
||||
R01009 | WGQ | Add a Maximum Limited Days data element to the Offer Upload Notification and the Offer Download. | Enron Transportation Services Company | Withdrawn by Submitter | |||||
R01008 | WGQ | Add a Transaction Type code Value 'Meter Bounce-Overrun' to the Nomination, Scheduled Quantity, Pre-determined Allocation, Allocation, Shipper Imbalance and Transportation/Sales Invoice data sets. | Enron Transportation Services Company | Recommendation | Request for Comments due August 19, 2005 |
||||
R01007 | WGQ | Add a Limited Firm Day Percentage data element to the Transportation/Sales Invoice. | Enron Transportation Services Company | Withdrawn by Submitter | |||||
R01006 | WGQ | Add Reduction Reason code values to the Scheduled Quantity and Scheduled
Quantity for Operator data sets. (See related GISB Request R99052.) |
Enron Transportation Services Company | Recommendation | |||||
R01005 | WGQ | Add a Capacity Release Percentage to Offer Upload, Offer Upload Notification, Offer Download, Bid Upload, Bid Download, and Award Download. | Enron Transportation Services Company | ||||||
R01004 | WGQ | Add a Storage Cycle Indicator data element to Offer Upload, Offer Upload Notification, Offer Download, Bid Upload, Bid Download, and Award Download. | Enron Transportation Services Company | Withdrawn by Submitter - June 30, 2005 | |||||
R01003 | WGQ | Add a System Management Service Quantity data element to various capacity release datasets. | Enron Transportation Services Company | Recommendation Recommendation 2 |
Request for Comments due November 13, 2006 Request for Comments due November 7, 2007 Comments Submitted by L. Spangler, Latitude Technologies |
||||
R01002 | WGQ | Add a Net Present Value data element to the header level of the Award Download (5.4.3). | Enron Transportation Services Company | Withdrawn by Submitter | |||||
R01001 | WGQ | Add a data element to the Offer Upload, Offer Upload Notification, Offer Download and the Award Download. | Enron Transportation Services Company | Recommendation Recommendation 2 |
|||||
R00027 | WGQ | Add a Status data element to the Offer Download, Bid Download and the Award Download. (GISB Interpretation No. 7.3.43). | Enron Transportation Services Company | Recommendation | Request for Comments due February 22, 2006 | ||||
R00026 | WGQ | Resolve the issues defined in the BPS minutes of 10/10/2000 and 10/11/2000 related to FERC Order No. 637. | CapacityCenter.com | ||||||
2000AP9 - Order 637 Items Assigned to the Business Practices Subcommittee |
WGQ | 2000AP9 - Order 637 Items Assigned to the Business Practices Subcommittee |
GISB 2000 Annual Plan | Recommendation 1
Recommendation 2 Recommendation 3 Recommendation 3 - Priority Action Items 1 and 2 - Revised |
|||||
Order 637 Index of Customers | WGQ | Order 637 Index of Customers | GISB 2000 Annual Plan | Recommendation 1
Recommendation 2 - amended and adopted by the EC on 10/12/00 and 10/19/00 |
|||||
2000AP9 - Order 637 Items Assigned to the Information Requirements Subcommittee |
WGQ | 2000AP9 - Order 637 Items Assigned to the Information Requirements Subcommittee |
GISB 2000 Annual Plan | Recommendation - Action Item 11 - Priority #3 | |||||
EII Request to Accommodate Capacity Release EBB and Flat File Requirements in Data Dictionaries | WGQ | EII Request to Accommodate Capacity Release EBB and Flat File Requirements in Data Dictionaries | Recommendation 1
Recommendation 2 |
||||||
R00025 | WGQ | Modify the GISB procedures for development and implementation of new datasets to expedite the completion and adoption of the Imbalance Trading transaction sets. | Altra Energy Technologies, Dynegy Marketing & Trade and PanCanadian Petroleum | Recommendation | |||||
R00024 | WGQ | Add code values for the Charge Type data element in the Transportation/Sales Invoice. | Enron Gas Pipeline Group | Recommendation | Request for Comments due August 19, 2005 |
||||
R00023 | WGQ | Add Rollover Rights Indicator and Rollover Rights Terms data elements to the header level of the Offer Download (5.4.1), Offer Upload (5.4.7) and Offer Upload Notification (5.4.9), with corresponding validation codes added to the Offer Upload Quick Response (5.4.8). | Enron Gas Pipeline Group | Recommendation | Request for Comments due May 10, 2006 | ||||
R00022 | WGQ | Add Right of First Refusal Indicator and Right of First Refusal Terms data elements to the Offer Download, Offer Upload and Offer Upload Notification, with corresponding validation codes added to the Offer Upload Quick Response. | Enron Gas Pipeline Group | Recommendation | Request for Comments due May 10, 2006 | ||||
R00021 | WGQ | Review EDI/EDM standards and manuals to ensure that the EDI/EDM software is case-insensitive. | Enron Gas Pipeline Group | ||||||
R00020 | WGQ | Add code values for the Charge Type data element in the Transportation/Sales Invoice, and add definitions for two existing Charge Type code values. | Enron Gas Pipeline Group | Recommendation | |||||
R00019 | WGQ | Change the usage of Releaser Company Code from Mandatory to Conditional in the Bid Upload. | CMS Panhandle Pipeline Companies | Recommendation | Request for Comments due February 22, 2006 | ||||
R00018 | WGQ | Add a new business conditional data element - producer - to the Nomination Related Datasets. | CMS Panhandle Pipeline Companies | Withdrawn by Submitter | |||||
R00017 | WGQ | Develop ED1 X.12 dataset standards for requesting AutoNoms service and providing corresponding supplier allocation. | Reliant Energy Gas Transmission | ||||||
R00016 | WGQ | Add �loop in� and �loop out� code values to the list of Reduction Reasons for Standards 1.4.4 (Confirmation Response) and 1.4.5 (Scheduled Quantity). | El Paso Natural Gas Company | Recommendation | |||||
R00015 | WGQ | Add a Bidder�s Contingency Terms data element to Bid Download and Bid Upload with corresponding validation codes to the Bid Upload Quick Response. | Enron Gas Pipeline Group | Recommendation | |||||
R00014 | WGQ | Add Signatory Name and Signatory Title data elements to the Bid Upload and the Offer Upload Bidder Confirmation, with corresponding validation codes added to the Bid Upload Quick Response and Offer Upload Bidder Confirmation Quick Response. | Enron Gas Pipeline Group | Recommendation | Request for Comments due February 22, 2006 | ||||
R00013 | WGQ | Add Bidder Invoice Contact and Bidder Invoice Address data elements to the Bid Upload and the Offer Upload Bidder Confirmation with corresponding validation codes added to the Bid Upload Quick Response and Offer Upload Bidder Confirmation Quick Response. | Enron Gas Pipeline Group | Recommendation | Request for Comments due February 22, 2006 | ||||
R00012 | WGQ | Add Bidder Notice Address and Bidder Notice Contact data elements to the Bid Upload and the Offer Upload Bidder Confirmation with corresponding validation codes added to the Bid Upload Quick Response and Offer Upload Bidder Confirmation Quick Response. | Enron Gas Pipeline Group | Recommendation | Request for Comments due February 22, 2006 | ||||
R00011 | WGQ | Add new Transaction Type code values for use in Nominations, Scheduled Quantities, Allocations, Imbalances, and Invoicing. | NGPL | Recommendation | |||||
R00010 | WGQ | Add Rate Identification Codes to the Offer Download, Bid Download, Award Download, Offer Upload, Offer Upload Quick Response, Offer Upload Notification, Bid Upload and Bid Upload Quick Response. | Recommendation | Request for Comments due May 11, 2005 |
|||||
R00009 | WGQ | Modify GISB Standard No. 4.3.18 to be consistent with GISB Standard No. 4.3.65. | NGPL | ||||||
R00008 | WGQ | Add a business practice for the content of the Storage Balance Report. | CapacityCenter.com | ||||||
FTTF Minimum Guidelines | WGQ | FTTF Minimum Guidelines | . | Recommendation | |||||
R00007 | WGQ | Add a data element to the Transportation/Sales Invoice (3.4.1) to identify charges as commodity or reservation. | Enron Gas Pipeline Group | Withdrawn by Submitter - December 16, 2004 | |||||
R00006 - Amended R00006 |
WGQ | Add 12 new code values for the Transaction Type data element in the nomination, flowing gas, and invoicing (as appropriate) related data sets. | Southern Natural Gas Company | Recommendation Revised Recommendation Recommendation - 5/17/06 |
Request for Comments due August 19, 2005 No Comments Received Request for Comments due February 22, 2006 No Comments Received Request for Comments due June 15, 2006 |
||||
R00005 | WGQ | Add a new data element �Swing Fuel Option Ind� (�SG Fuel Opt�) to the Pre-determined Allocation (2.4.1). | Tennessee Gas Pipeline Company | Recommendation | Request for Comments due May 11, 2005 |
||||
R00004 | WGQ | Add a new data element �Limit Type� (�Limit Type�) to the Predetermined Allocation (2.4.1). | Tennessee Gas Pipeline Company | Recommendation | Request for Comments due May 11, 2005 |
||||
R00003 | WGQ | Add code values of the Charge type data element in Transportation/Sales Invoice document. | Great Lakes Gas Transmission Company | Withdrawn by Submitter - May 24, 2004 | |||||
R00002 | WGQ | Review the possible use of Extensible Markup Language (XML). | Enron Gas Pipeline Group | Withdrawn by Submitter | |||||
R00001 | WGQ | Review the existing GISB security mechanisms and make appropriate revisions. | Enron Gas Pipeline Group | Withdrawn by Submitter | |||||
R99052 | WGQ | Add a code value description for the Service Code data element in the Transportation/Sales Invoice (3.4.1). The Service Code data element is used to specify the type of service being rendered under the contract. The additional code value description �Limited Firm Transportation� indicates that the transportation service was provided on a limited basis. | Enron Gas Pipeline Group | Recommendation | |||||
R99051 | WGQ | Change the usage code of several fields on the Transportation/Sales Invoice (3.4.1) from Business Conditional (BC) to Sender�s Option (SO), as the sending of these data elements is determined by the sender of the document. | Williams Gas Pipeline | Recommendation | |||||
R99050 | WGQ | Change the definition of the data element Tax Identification Code in the Transportation/Sales Invoice (3.4.1) to reflect that the code is assigned to the Remit to Party. | Williams Gas Pipeline | Recommendation | |||||
R99049 | WGQ | Add the data element Remit to Party to the Transportation/Sales Invoice (GISB Std. 3.4.1). In the current Invoice, the Remittance Address data element is used to send both the name and the address for the Remit to Party. | Williams Gas Pipeline | Revised Recommendation | |||||
R99048 | WGQ | Modify the GISB standard contracts and models to correct any references to "19" century in date fields. | Altra Energy Technologies | Recommendation | |||||
R99047 | WGQ | Provide a means of sending the data element Accounting Period in the Transportation/Sales Invoice (3.4.1). Currently, this data element is sent in several other GISB documents, such as the Pre-Determined Allocation, Allocation, Shipper Imbalance and Measurement Information. However, it is not currently in the Invoice. | Williams Gas Pipeline | Recommendation | |||||
R99046 | WGQ | Modify GISB Standard No. 3.4.1 to enable the sending of more than one Charge Type for a Line Number in the Transportation/Sales Invoice (3.4.1). Currently, the document accommodates only one Charge Type for each Line Number, but it is typical for an invoice line to have more than one charge type. | Williams Gas Pipeline | Recommendation | |||||
EII Data Set Changes - July 30, 1999 | WGQ | Recommendation | |||||||
R99045 | WGQ | Add a code value to the list of valid code values for the Charge Type data element in the Transportation/Sales Invoice (3.4.1), to accurately reflect a Reservation Charge Credit as described in one of firm rate schedules. | Duke Energy Corporation | Recommendation | |||||
R99044 | WGQ | Add the Transaction Type �Backhaul� to the Nomination, Scheduled Quantity, Shipper Imbalance, Transportation/Sales Invoice, and other documents where the Transaction Type appears, so that the requested Transaction Type can indicate whether to charge standard rates or backhaul rates. | Williams Gas Pipeline | Recommendation | |||||
R99043 | WGQ | Add a data element called �Minimum Volumetric Commitment Percentage Evaluation Code� to the Offer Upload (5.4.7) and the Offer Download (5.4.1) datasets. | Williams Gas Pipeline | Recommendation | |||||
R99042 | WGQ | Add a data element called �Bidder�s Contingency Terms� to the Bid Upload, the Bid Download, and other Capacity Release datasets where the Bidder�s Contingency Indicator is used. The new data element is defined as �a description of the contingencies applicable to the bid.� The data element would be a text field that would be required whenever the Bidder�s Contingency Indicator indicated that the bidder had specified a contingency with respect to the bid. | Williams Gas Pipeline | ||||||
R99041 | WGQ | Allow multiple Reduction Reasons to be sent on the Scheduled Quantity to track up to five instances where a reduction can take place. The additional reduction reasons should have a usage of MA. (Multiple reasons are not necessary on the Sched Qty for Op or the Confirmation Response.) | Columbia Gas Transmission | Recommendation | |||||
R99040 | WGQ | Add a Reduction Reason code value to the Confirmation Response (1.4.4), Scheduled Quantity (1.4.5) and Scheduled Quantity for Operator (1.4.6) data sets to be used to communicate a reduction in nominated quantities as a result of non-compliance with the processing affidavit requirements. | Enron Gas Pipeline Group | Recommendation | |||||
R99039 - Revised | WGQ | Add code values to the Transaction Type data element to identify and more accurately account for the gas transactions for Services Requestors and enhance the ability to communicate the nominations and scheduled quantities after the allocation process. | Columbia Gas Transmission | Recommendation | |||||
R99038 | WGQ | Add a data element of �Maximum Rate Indicator� to the Nomination dataset with a usage of BC, to be used by Service Requesters moving gas under Interruptible transportation service to support the scheduling process. | Koch Gateway Pipeline | Revised Recommendation | |||||
EBB Internet Implementation Standards Recommended by the Task Force as of June 7, 1999 addressing Capacity Release and Contracting | WGQ | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||||
Technical EII Changes as of June 7, 1999 | WGQ | Recommendation | |||||||
1999AP7 - Imbalance Subcommittee Recommended Standards | WGQ | GISB 1999 Annual Plan | Revised Recommendation 1 - as adopted by the EC on 7/15/99
Recommendation 2 EC Revised Imbalance Netting and Trading Recommendation Corrected, EC Revised Imbalance Netting and Trading Recommendation |
||||||
EII Data Sets for Invoicing as of June 7, 1999 | WGQ | Recommendation | |||||||
EII Data Sets for Flowing Gas as of June 7, 1999 | WGQ | Recommendation | |||||||
EII Data Sets for Nominations as of June 7, 1999 | WGQ | Corrected Recommendation | |||||||
R99037 | WGQ | Add a new data element �Confirmation Level� (�Conf Lvl�) to the Request for Confirmation, Confirmation Response, and Scheduled Quantity for Operators to differentiate between the roles of the confirming parties on a Transportation Service Provider that supports multi-level confirmations. | Tennessee Gas Pipeline | Recommendation Recommendation - 1/6/05 |
Request for Comments due February 2, 2005 | ||||
R99036 - as revised by the EC 7/15/99 | WGQ | Review and recommend changes to the EDM Standards Manual, to ensure that the text of the manual is supported by existing standards and recommend incorporation of changes in the EDM manual to streamline the manual consistent with existing standards. | Group 8760 | Recommendation | |||||
R99035 | WGQ | Review and recommend changes to the existing body of EDM standards to support standards convergence across other standards setting groups, such as AIAG, UIG, and EDI-INT. The recommendations would be guided by a principle of backward compatibility with the existing GISB standards. | Group 8760 | Recommendation | |||||
R99034 | WGQ | Develop ANSI ASC X12 EDI standards for electronic contracting between the TSP and the shipper for transportation and storage services, request for services, transportation service agreements, rate agreements and confirmations. | Reliant Energy Gas Transmission | Recommendation | |||||
R99033 | WGQ | Add the name and definition for design capacity and scheduled quantity to the data set 5.4.13 Operationally Available and Unsubscribed Capcity. | Dynegy | Recommendation Recommendation - 5/17/2010 Attachment 1 - Data Dictionary Attachment 2 - EDI Technical Recommendation - 7/22/2010 Attachment 1 - Data Dictionary - 7/22/10 Attachment 2 - EDI Technical - 7/22/10 Attachment 3 - EDISM G873OACY - 7/22/10 Attachment 4 - EDISM G873UNSC - 7/22/10 |
Request for Comments Due June 17, 2010 Comments Submitted by D. Field, Southern Star Central Gas Pipeline |
||||
Notices Task Force Recommended Standards | WGQ | Recommendation Revised Recommendation - as adopted by the EC on 5/20/99 |
|||||||
Common Codes Principle and Standards | WGQ | Recommendation Recommendation - Part 2 Recommendation - as adopted by the EC on 5/20/99 - (Revised 7/9/99) |
|||||||
R99032 | WGQ | Add a data element "Point Substitution Indicator" to the Offer Upload and Offer Download. | Williams Gas Pipeline | Recommendation Recommendation 2 |
|||||
R99031 | WGQ | Add a data element "Confirmation Intra-day Indicator" to the Request for Confirmation, Confirmation Response, Confirmation Response Quick Response and Scheduled Quantity for Operator data sets. | TransCapacity | Revised Recommendation Recommendation 2 |
Revised Request for Comments due May 11, 2005 Request for Comments due August 19, 2005 |
||||
R99030 | WGQ | Determine if an EDI data set is needed for the Entities Lookup List if the list is displayed on the Entities Web site. | Tennessee Gas Pipeline | ||||||
R99029 | WGQ | Determine if an EDI data set is needed for the Locations List if the list is displayed on the Entities Web site. | Tennessee Gas Pipeline | Corrected Recommendation | |||||
R99028 | WGQ | Determine if an EDI data set is needed for the Plant Meter List if the list is displayed on the Entities Web site. | Tennessee Gas Pipeline | Recommendation | |||||
R99027 | WGQ | Determine if an EDI data set is needed for the Cashout Pricing Index if the Index is displayed on the Entities Web site. | Tennessee Gas Pipeline | Recommendation | |||||
R99026 | WGQ | Determine if an EDI data set is needed for the EDI Implementation Guide Supplement if the supplement is displayed on the Entities Web site. | Tennessee Gas Pipeline | Recommendation | |||||
R99025 | WGQ | Determine if an EDI data set is needed for the Trading Partner Agreement if the Trading Partner Agreement is displayed on the Entities Web site. | Tennessee Gas Pipeline | Recommendation | |||||
R99024 | WGQ | Change the name and definition of several data elements in capacity release transaction to be consistent with the names of data elements in other transactions. | Tennessee Gas Pipeline | Recommendation | |||||
R99023 | WGQ | Add a code value to the Charge Type Code for the Invoice data set for "conditional reservation charge". | Panhandle Eastern Pipeline | Recommendation | |||||
R99022 | WGQ | Provide a means for replacement shippers to electronically execute contracts for awarded capacity. | Williams Gas Pipeline | ||||||
R99021 | WGQ | Add three new code values to the Validation Code in the Confirmation Response Quick Response (1.4.7). These Validation Codes would be error messages at the sub-detail level. | ANR Pipeline | Recommendation A
Corrected Recommendation B |
|||||
R99020 | WGQ | Modify the Capacity Release data sets to accommodate the releasing shipper's ability to specify whether Gas Transaction Points can be changed after the capacity has been awarded. The data sets affected are Offer Upload, Offer Download, Award Download and Offer Upload Notification. | Enron Gas Pipeline | Recommendation Recommendation 2 |
|||||
R99019 | WGQ | Add a data element "Secondary Rights Indicator" to the Capacity Release data sets for Offers, Offers Download, UPPD and UPPD Notification. | ANR Pipeline | ||||||
R99018 | WGQ | Add a data element "Segmentation Indicator" to the Capacity Release data sets for Offers, Offers Download, UPPD and UPPD Notification. | ANR Pipeline | ||||||
R99017 | WGQ | Add a data element "Location/Quantity Type Indicator" to Capacity Release Data Sets 5.4.1, 5.4.2, 5.4.3, 5.4.7, 5.4.8, 5.4.9. | Tennessee Gas Gas Pipeline | Withdrawn by Submitter | |||||
R99016 | WGQ | Add a data element "Capacity Type Indicator" to Capacity Release Data Sets 5.4.1, 5.4.2, 5.4.3, 5.4.7, 5.4.8, 5.4.9. | Tennessee Gas Pipeline | Recommendation | |||||
R99015 | WGQ | Define a means of sending Capcity Release want ads to the TSP to be posted, requesting a download of the want ads, and sending the want ads download to the requester. | Williams Gas Pipeline | Recommendation | |||||
R99014 | WGQ | Define a means of sending a Recall or Reput data set to the Transportation Service Provider to indicate that a capacity holder intends to recall or reput capcity previously released through the Capacity Release process, and sending a response data set and notification data set. This request may be linked to R99077. | Williams Gas Pipeline | Withdrawn by Submitter | |||||
R99013 | WGQ | Define a means of requesting and providing pre-approved bidders list used in capacity release. | Williams Gas Pipeline | Recommendation Attachment 1 to R99013 Recommendation - TIBP/Paper Sample/Data Dictionary Attachment 2 to R99013 Recommendation - Data Element Cross Reference Attachment 3 to R99013 Recommendation - 105 Dataset |
Request for Comments due May 10, 2006 | ||||
R99012 | WGQ | Create Approved Bidders List Download and Request for Approved Bidders List Download EDI data sets to allow trading partners to request and receive a list of the current approved capacity release bidders available on the transportation service provider. | Texas Eastern Transmission | Withdrawn by Submitter | |||||
R99011 | WGQ | Create Match Upload and Request for Match Upload Quick Response EDI data sets to allow trading partners to provide information to match a winning bid and for transportation service providers to send validations regarding the match upload to the trading partner. | Texas Eastern Transmission | Withdrawn by Submitter | |||||
R99010 | WGQ | Create Recall Upload and Recall Upload Quick Response data sets for trading partners to submit a recall of capacity to a TSP and the TSP to send a validation of the recall upload to the trading partner. | Texas Eastern Transmission | Withdrawn by Submitter | |||||
R99009 | WGQ | Add data elements to the Award download (5.4.3) for comparability between EDI and Web Sites. | Texas Eastern Transmission | Withdrawn by Submitter | |||||
R99008 | WGQ | Add standard data sets, elements and/or code values to the Capacity Release Related Standards to accomplish the reposting of an offer to release capacity subsequent to the close of an open season. | Colorado Interstate Gas | Recommendation | |||||
R99007 | WGQ | Add new data sets for capacity release to accomplish the recall and reput of released capacity. | Colorado Interstate Gas | Withdrawn by Submitter | |||||
R99006 | WGQ | Add a data element to the Pre-determined Allocation and Pre-determined Allocation Quick Response data sets to facilitate response processing currently supported through the ANSI X12 data element that identifies location level (POC 01) and similarly for the Request for Confirmation, Confirmation Response and Confirmation Response Quick Response data sets (PO1 01). | Williams Gas Pipeline - Transco | ||||||
R99005 | WGQ | Modify the definitions for Operational Delivery Quantity and Operational Receipt Quantity in the Shipper Imbalance (2.4.4) data set. | Williams Gas Pipeline - Central | Recommendation 1
Recommendation 2 Revised Recommendation |
|||||
EBB Internet Implementation Standards Recommended by the Task Force as of January 20, 1999 | WGQ | Revised Recommendation - as adopted by the EC on 3/18/99 | |||||||
R99004 | WGQ | Add code values to the Transaction Type data element in the Transportation/Sales Invoice (3.4.1) to support consistency from nomination through billing. | Algonquin Gas Transmission | Recommendation | |||||
R99003 | WGQ | Add two new code values for the Capacity release - Operationally Available and Unsubscribed Capacity data set (G840OAUC) for the existing data element Location/Quantity Type Indicator. | ANR Pipeline Company | ||||||
Revised R99002 | WGQ | Modify the nomination deadlines and associated gas days from December 28, 1999 to January 3, 2000 to accommodate any software or hardware problems related to Year 2000. | Tennessee Gas Pipeline and TransCapacity | ||||||
R99001 | WGQ | Add the Nominator Tracking Id to the SI data segment of the Transportation/Sales Invoice as a conditional data element based on the value being present earlier in the process. | TransCapacity | ||||||
1998AP6 - Title Transfer Tracking | WGQ | GISB 1998 Annual Plan | Recommendation
Recommendation - Revised Recommendation 2 |
||||||
R98091 | WGQ | Add a DTM segment to the sub-detail level of the GISB Transportation/Sales Invoice (G811TSIN) to reduce the number of detail loops required for each contract when date ranges are needed to reflect volume or rate changes for different rates. | ANR Pipeline | ||||||
EBB Internet Implementation Standards for Flowing Gas and Flat Files | WGQ | Recommendation - as adopted by the EC on 1/21/99 | |||||||
R98090 | WGQ | Revise the definition language for Service Provider's Activity Code in the nominations standards, including the addition of two addtional data elements to the definition -- Service Requester Contract and Transportation Type, and the specification of usages for the data elements specified for the definition. | ANR Pipeline | Recommendation | |||||
R98089 | WGQ | Add a code value of "RD" to the ANSI data element Acknowledgement Type in the BAK segment of the Confirmation Response (Standard 1.4.4) transaction set. The code value "RD" means Reject with Detail (the Request for Confirmation transaction set - Standard 1.4.3) and would be utilized when the entire transaction was rejected due to header level errors. | ANR Pipeline | Recommendation
Recommendation B |
|||||
R98088 | WGQ | Modify the Scheduled Quantity data set to add the data element "Confirmation Quantity" with a sender's option usage to allow all Service Requesters to view their meter balance information. | Koch Gateway Pipeline | Recommendation | |||||
R98087 | WGQ | Create a new data set and add a new code value to the Upload or Request for Download and associated response data sets -- both mutually agreeable -- to allow an Operator to request a download of physical meters and volumes behind an aggregate/ logical meter that is allocable. | Koch Gateway Pipeline | ||||||
R98086 | WGQ | Proposed standards are requests to establish a consistent manner to notify service requesters of such [intraday bumps referenced in Order No. 587-G] intraday bumps as well as standardize Internet email notification of Operational Flow Orders (OFO) and Critical Notices. | Columbia Gulf Transmission | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R98085 | WGQ | Revise the Nomination data set to accommodate sending only one common code at custody transfer locations where the transportation service provider knows the relationship between the Contract Identifier and the Identifier Code (e.g. pooling points, logical points). | Enron Capital & Trade | Recommendation | |||||
R98084 - Revised | WGQ | Define a means of requesting and sending a dataset that communicates Gas Quantity Statement data. | Transco | Recommendation
Revised Recommendation |
|||||
R98083 | WGQ | Define a means of requesting and sending a dataset that communicates Measurement Data by Company. | Transco | ||||||
R98082 | WGQ | Define a means of requesting and sending a dataset to communicate RTU Events. | Transco | Recommendation Attachment 1 to Recommendation - Data Element Xref Attachment 2 to Recommendation - 814 Dataset Attachment 3 to Recommendation - Transaction Table |
Request for Comments due May 10, 2006 | ||||
R98081 | WGQ | Define a means of requesting and sending a dataset that communicates RTU Alarms. | Transco | Recommendation Attachment 1 to Recommendation - Data Element Xref Attachment 2 to Recommendation - 814 Dataset Attachment 3 to Recommendation - Transaction Table |
Request for Comments due May 10, 2006 | ||||
R98080 | WGQ | Define a means of requesting and sending a dataset that communicates "Gas Quality Data". | Transco | ||||||
R98079 | WGQ | Define a means of requesting and sending a dataset that communicates AGA History Measurement Audit data. | Transco | ||||||
R98078 | WGQ | Define a means of requesting and sending the dataset "Allocation for Poolers". | Transco | ||||||
R98077 | WGQ | Define a means of requesting and sending the dataset "Laboratory Analysis of Measurement Sample Data". | Transco | ||||||
R98076 | WGQ | Define a means of communicating additional types of volumes on the Allocation dataset (2.4.3) and the Measurement Information dataset (2.4.5). | Transco | ||||||
R98075 | WGQ | Define a means of communicating Nitrogen and Carbon Dioxide volumes by meter by day on the Measured Volume Audit Report dataset (2.4.6). | Transco | ||||||
R98074 | WGQ | Define a means of requesting a dataset that communicates Pre-determined Allocation (PDA) information to those parties who can submit PDA information to the Transportation Service Provider. In addition, define a means of sending a dataset that communicates hourly measurement volumes at the meter level, either by creating a new dataset or by modifying an existing dataset. | Transco | ||||||
R98073 | WGQ | Define a means of requesting and sending a dataset that communicates hourly measurement volumes at the meter level, either by creating a new dataset or by modifying an existing dataset. | Transco | ||||||
R98072 | WGQ | Define a means of requesting and sending a dataset that communicates measurement volumes at the meter level, for both current and historical periods, either by creating a new data set or by modifying an existing dataset. | Transco | ||||||
R98071 | WGQ | Add data elements to the Storage Balance Download transaction set requested by Texas Eastern Transmission in Request R98065: Balance Status, Transferred Injection Quantity and Transferred Withdrawl Quantity. | Panhandle Eastern / Trunkline | ||||||
R98070 | WGQ | Create an EDI transaction set titled "PMA Contract Summary Download" and its corresponding request transaction set, "Request for PMA Contract Summary Download" in order for a trading partner to be able to request and to receive information related to prior month adjustments for a specified accounting period. | Panhandle Eastern / Trunkline | ||||||
R98069 | WGQ | Add data elements to the Shipper Imbalance (2.4.4): Contract Daily Tolerance, Quantity in Excess of Daily Contract Tolerance, Variance Percent and Variance Quantity. | Panhandle Eastern / Trunkline | Recommendation 1
Recommendation 2 Revised Recommendation |
|||||
R98068 | WGQ | Add data elements to the Measurement Information (2.4.5): Point Relationship and Proprietary Meter Code. | Panhandle Eastern / Trunkline | Recommendation | |||||
R98067 | WGQ | Add code values to the list of valid code values for the Transaction Type data element in the Pre-determined Allocation (2.4.1) and Allocation (2.4.3): Suspense Gas Claim and Delivery of Claimed Suspense Gas. | Texas Eastern Transmission | Recommendation | |||||
R98066 | WGQ | Add code values to the list of valid code values for the Transaction Type data element in the Pre-determined Allocation (2.4.1) and Allocation (2.4.3): No-Notice Service, No-Notice Pre-Injection, No-Notice Balancing, No-Notice Due Transportation Service Provider Balancing, and No-Notice Due Service Requester Balancing. | Texas Eastern Transmission | Recommendation | |||||
R98065 | WGQ | Create an EDI transaction set titled Storage Balance Download and its corresponding request transaction set, Request for Storage Balance Download in order for a trading partner to be able to request and to receive balance information for storage contracts. | Texas Eastern Transmission | ||||||
R98064 | WGQ | Add the data elements listed below to the Shipper Imbalance Statement(2.4.4): Delivery Zone Identifier, Direction of Flow, Receipt Zone Identifier, and Service Requester. | Texas Eastern Transmission | Recommendation 1
Recommendation 2 Revised Recommendation |
|||||
R98063 | WGQ | Add the data elements listed below to the Allocation (2.4.3) and the Pre-determined Allocation (2.4.1): Measured Direction of Flow and Rate Schedule. | Texas Eastern Transmission | Withdrawn by Submitter | |||||
December 17, 1998 EC Adopted EII Standards | WGQ | Revised Recommendation - as adopted by the EC on 12/17/98 | |||||||
R98062 | WGQ | Add a new standards data set to the Nomination Related Standards (1.4.X) to allow a Park and Loan shipper to submit a request for a specific Park/Loan deal Park/Loan deal requests should include: Park/Loan contract, Request for "Park" or "Loan" , Park/Loan Location, Maximum Park/Loan Quantity, Park/Loan Deal Term and Park/Loan Deal Rate. | Colorado Interstate Gas | Recommendation
Recommendation 2 |
|||||
R98061 | WGQ | Add a new standard data set to the Nomination Related Standards (1.4.X) to allow No Notice Transportation (NNT) shippers to request authorization for overrun deliveries under their NNT contracts. | Colorado Interstate Gas | Recommendation
Recommendation 2 |
|||||
R98060 | WGQ | Give the functional acknowledgement a Transaction Set ID. The Transaction Set ID would be used as the value for "transaction set." Transaction set is a data element in the EDM Implementation Guide. The Functional Acknowledgement is the only document that has not been assigned a Transaction Set ID. | Columbia Gas Transmission | Recommendation | |||||
R98059 | WGQ | Add a new data set, Scheduled Quantity for Pools Report, to communicate the scheduled quantities at pools. | Transco | Withdrawn by Submitter | |||||
R98058 | WGQ | Add the following code value description and definition for the Charge Type data element in the Transportation/Sales Invoice (3.4.1): Code Value Description Code: Voluntary GRI, Value Definition: A charge type to identify a voluntary contribution to GRI. | El Paso Natural Gas | Recommendation A | |||||
R98057 | WGQ | Add three data elements to the Scheduled Quantity (1.4.5) and Scheduled Quantity for Operators (1.4.6) datasets. The data elements are as follows: SQ Status, Month to date and Confirmed Quantity. | TransCapacity | Recommendation | |||||
R98056 | WGQ | Add two new datasets to accomplish the following purposes: Upload of Service Requester Information to upload a change of a service requesters name, address or DUNS Number to the Transportation Service Provider and Upload of Service Requester Information Quick Response to provide a relevant quick response download to the upload of change of service requester information. | TransCapacity | ||||||
R98055 | WGQ | Add new code values for the "Transaction Type" data element in the nomination, invoicing (as appropriate), and flowing gas (as appropriate) related datasets. These code values would be used for nomination and scheduling of the following: Suspense gas, No-notice service, Flow day diversion and Authorized point overrun. | TransCapacity | Recommendation | |||||
R98054 | WGQ | Add a new data element, Accounting Data 2, to the Nomination and Confirmation data sets that allows the customer to enter additional information about the transaction. | El Paso Natural Gas | Recommendation | |||||
R98053 | WGQ | Add a new data element, Accounting Data 1, to the Nomination and Confirmation data sets that allows the customer to enter additional information about the transaction. | El Paso Natural Gas | Recommendation | |||||
R98052 | WGQ | Add a new data field called "tax code" to the Nomination dataset to provide a taxation code value that may be applicable to a nomination line item. This tax code could be used for the Canadian Goods and Services Tax (GST) export declaration. | TransCanada PipeLines | Recommendation | |||||
R98051 | WGQ | Add TransCanada PipeLine mainline (TCPL) requests that a new field be added to the Nomination and Scheduled Quantity datasets. This new field called "Minimum Quantity" would to provide shippers with an option of specifying a floor quantity below which the nomination would cease to have effect. This field should be Business Conditional. | TransCanada PipeLines | Recommendation | |||||
R98050 | WGQ | Add a new data set, "Storage and Park/Loan Balance Information", plus a new code value, "Storage and Park/Loan Balance", in the Upload of Request for Download (and Response) data sets to facilitate the transfer of storage and park/loan information to and from trading partners. | TransCapacity | Recommendation Recommendation Attachment 1 Recommendation Attachment 2 Recommendation Attachment 3 Recommendation Attachment 4 |
Request for Comments due February 2, 2005 | ||||
R98049 | WGQ | Add a new data set, "Credit Status Information", plus a new code value, "Credit Status", in the Upload of Request for Download (and Response) data sets to facilitate the transfer of credit status and approved bidder information to and from trading partners. | TransCapacity | ||||||
R98048 | WGQ | Add a new data set, "Fuel Matrix Information", plus a new code value, "Fuel Matrix", in the Upload of Request for Download (and Response) data sets to facilitate the transfer of fuel matrix information to and from trading partners. | TransCapacity | ||||||
R98047 | WGQ | Add a new data set, "Supported Code Value Information", plus a new code value, "Supported Code Values", in the Upload of Request for Download (and Response)data sets to facilitate the transfer of valid code value information to and from trading partners. | TransCapacity | Recommendation Recommendation - Attachment 1 Recommendation - Attachment 2 Recommendation - Attachment 3 Recommendation - Attachment 4 |
Request for Comments due November 7, 2007 | ||||
R98046 | WGQ | Add a Processing Rights Indicator data elements to the sub-detail level of the Nomination (1.4.1) and Scheduled Quantity (1.4.5) data sets. | Enron Gas Pipeline Group | Recommendation | |||||
R98045 | WGQ | Create an EDI transaction set for In-Field Storage Transfer. | Duke Energy | Withdrawn by Submitter | |||||
R98044 | WGQ | Add nine data elements (Change Indicator, Confirmation Status, County, Estimated BTU, Location Operator, Physical Direction of Flow, Preliminary Allocation Method, Previous Day Scheduled Quantity, State Abbreviation) to the Scheduled Quantity for Operator (1.4.6) data set. | Duke Energy | Recommendation | |||||
R98043 | WGQ | Add eight data elements (Change Indicator, Confirmation Status, County, Location Operator, Physical Direction of Flow, Preliminary Allocation Method, Previous Day Scheduled Quantity, State Abbreviation) to the Request for Confirmation (1.4.3) data set and two data elements (Location Operator and Transaction Status Code) to the Confirmation Response (1.4.4) data set. | Duke Energy | Recommendation | |||||
R98042 | WGQ | Add four data elements (Bid Up Indicator, Delivery Location Confirmation Status, Fuel Percent, Receipt Location Confirmation Status) to the Scheduled Quantity (1.4.5) data set. | Duke Energy | Recommendation | |||||
R98041 | WGQ | Add contract data elements and bid rate data elements to allow the nomination of a "Super-Nom." | Columbia Gas Transmission | Withdrawn by Submitter | |||||
R98040 | WGQ | Add a new data set, Storage Balance Report, to the Flowing Gas Implementation Guide. This will include 12 new data elements that are described in the request. | Columbia Gas Transmission | Recommendation Recommendation Attachment 1 Recommendation Attachment 2 Recommendation Attachment 3 Recommendation Attachment 4 |
Request for Comments due February 2, 2005 | ||||
R98039 | WGQ | Add a "Move to Cycle" data item to both nomination and confirmation transactions which will enable customers to automatically renominate or reconfirm the quantity on a transaction in subsequent cycles that was reduced during processing in the previous cycle. | El Paso Natural Gas | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R98038 | WGQ | Create an ANSI ASC X12 document that allows a Transportation Service Provider to send out a "Lesser of Rule" Confirmation Warning transaction prior to the end of the confirmation process. | Koch Gateway Pipeline | ||||||
R98037 | WGQ | Add a non-textual data element that will tie the offers of a Not-Stand-Alone Offer together to the existing UPPD data set and the Non-Prearranged Deals data set under development. | Columbia Gas Transmission | Recommendation | Request for Comments due February 22, 2006 | ||||
R98036 - Revision 2 | WGQ | Implement a mechanism to allow Producer to request ranking
of market contracts by location where the upstream entity is the Producer. The response to this
request should include an acknowledgement that the ranking was approved by the TSP. Request Revision: Add a new transaction identifier, Producer Ranking, to the Request for Confirmation and Confirmation Response in order to indicate when the dataset is being used for producer ranking. |
ANR Pipeline | ||||||
R98035 - Revision 2 | WGQ | Add a data element for "pre-limit quantity" to nomination/
confirmation related transaction datasets. Implement a mechanism to request a list of active
pre-approved, pre-limit quantities by SR, Operator, LDC or Producer. Implement a mechanism
to allow LDC or Operator to request pre-limit quantities for each contract or location. Request Revision: Add a new transaction identifier, Pre-Limit Quantities, to the Request for Confirmation and Confirmation Response in order to indicate when the dataset is being used for pre-limit quantities. |
ANR Pipeline | Recommendation A
Recommendation B |
|||||
R98034 - Revised | WGQ | Initiate standards, data elements, code values and X12 ANSI implementation guides to allow customer access (EDI/EDM and EBB/EDM) to directly add, change and delete various entity information including addresses, contacts, phone numbers and business uses. | ANR Pipeline | ||||||
R98033 | WGQ | Provide the Service Requester (i.e. pooler) with the ability to request pooling information for any specified time period via a proposed Scheduled Quantity of Poolers Dataset. Add a new data element for "Contract." | ANR Pipeline | Withdrawn by Submitter | |||||
R98032 | WGQ | Add data elements for Market Balance Service nominations: MBS Storage Quantity, MBS Injection Quantity and MBS Withdrawl Quantity. Nomination business key ID (NomID) - created by TSP to use in lieu of the business keys. One unique Nom ID for each unique business key. Modify the datasets to accommodate multiple occurrences of Associated Contracts for each MBS nomination. | ANR Pipeline | ||||||
Revised R98031 | WGQ | Develop an EDI dataset to allow Confirming Parties to elect to "Confirm by Exception" as provided for in 1.2.11 and 1.3.22. This would be classified as a "new transaction." | Tennessee Gas Pipeline | Recommendation | |||||
R98030 | WGQ | Modify GISB Standard 3.4.1 to include enhancements to the sales invoice to the GISB Implementation Guides. | Texaco Natural Gas | ||||||
R98029 | WGQ | Change the usage and definition of the Transaction Status Code "AE" in the 855 Quick Response transaction set. The definition of "AE" should change from "Acknowledge - With Exception Detail Only: Error(s) or warning(s) occurred in the transaction. Transaction has been acknowledged. Error(s) and warning(s) follow." to "Acknowledge: Transaction has been acknowledged. all processed line items, i.e. sub-detail, to follow." | TransCapacity | ||||||
R98028 | WGQ | Add two code values (Suspense Gas Claim and Delivery of Claimed Suspense Gas) to the list of valid code values for the Transaction Type data element in the Nomination (1.4.1), Scheduled Quantity (1.4.5) Imbalance (2.4.4) and Transportation/Sales Invoice (3.4.1). | Duke Energy Corp. | Recommendation | |||||
R98027 | WGQ | Add five code values (No-Notice Service, No-Notice Pre-Injection, No-Notice Balancing, No-Notice Due Transportation Service Provider Balancing, No-Notice Due Service Requester Balancing) to the list of valid code values for the Transportation Type data element in the Nomination (1.4.1), Scheduled Quantity (1.4.5) Imbalance (2.4.4) and Transportation/Sales Invoice (3.4.1). | Duke Energy Corp. | Recommendation | |||||
R98026 | WGQ | Add the data elements "Bid Up Indicator" and "Fuel Percent" to the Nomination dataset 1.4.1. | Duke Energy Corp. | Revised Recommendation - as adopted by the EC on 3/18/99 | |||||
R98025 | WGQ | Add a code value description and definition for the Charge Type data element in the Transportation/Sales Invoice document (GISB Standard No. 3.4.1). | Enron Gas Pipeline Group | Recommendation | |||||
R98024 | WGQ | Add a validation code description to the Validation Code data element in the Nomination Quick Response (GISB Standard No. 1.4.2), applicable at the sub-detail level. | TransCapacity | Recommendation | |||||
R98023 | WGQ | Add eight Reduction Reason code value descriptions and definitions for the Scheduled Quantity (1.4.5) and Scheduled Quantity for Operator (1.4.6). | Enron Gas Pipeline Group | Recommendation | |||||
R98022 | WGQ | Order 587G provides that "Pipelines will be permitted cost-of-service recovery in subsequent section 4 rate cases for the costs of the interactive web site only if the pipelines together with GISB create standards governing the access to, presentation, and format ("look and feel") of the sites." I am requesting that GISB develop standards consistent with the Order. | Providence Gas Co. | ||||||
R98021 | WGQ | Modify the implementation of the CTT segment within the Shipper Imbalance and the Transportation/Sales Invoice. In these transactions, the CTT should be the accummulation of the number of ITI segments. | Columbia Gas Transmission | Recommendation | |||||
OBA Standards - Item 1c | WGQ | GISB 1998 Annual Plan | Revised Recommendation | ||||||
R98020 | WGQ | Develop a standard Agency Agreement and associated business practice standards whereby transportation service providers (TSPs) or their agents provide TSP's business parties an Agency Agreement whereby the business parties would appoint the TSP or the TSP's agency to act as agent for the business coordination purpose of collecting and disseminating bueiness party identification codes. These business parties would include but not be limited to service requesters, interconnected service providers, information service providers, end-use customers, marketers and producers. | TransCapacity | ||||||
R98019 | WGQ | Develop a long term master purchase and sales contract for natural gas. | PG&E Texas Industrial Energy | ||||||
R98018 | WGQ | Add a method to the Scheduled Quantity by Contract (865SQTS) and the Scheduled Quantity for Operator (865SQOP) to send multiple (up to ten) Reduction Reason Codes (additional Reduction Reason Codes are MA) and add a new data element Reduction Quantity (MA) multiple times (up to 10). Definition of Reduction Quantity - Quantity associated with Reduction Reason Code. | El Paso Natural Gas & SoCal Gas | Recommendation | Request for Comments due February 2, 2005 | ||||
R98017 | WGQ | Modify the data dictionary to add text to the Release Term Start Date and Release Term End Date in the Capacity Release Award Notice. | Columbia Gas Transmission | Recommendation | |||||
R98016 | WGQ | Correct an omission in the cross reference of the Measurement Information document by the inclusion of the usage for Ending Flow Date and Ending Flow Time. | Columbia Gas Transmission | Recommendation | |||||
R98015 | WGQ | Change the usage of Meter Operator to BC in the Measured Volume Audit Statement. | Columbia Gas Transmission | Recommendation | |||||
R98014 | WGQ | Add Preparer ID and Recipient ID to the Measured Volume Audit Statement. | Columbia Gas Transmission | ||||||
R98013 | WGQ | Modify the Measured Volume Audit Statement to make the values for Static Pressure Range consistent with Static Pressure, and Maximum Differential Pressure with Differential Pressure. | Columbia Gas Transmission | Recommendation | |||||
R98012 | WGQ | Add a new standard to describe when and under what circumstances Allocation Statements are sent to shippers. | TransCapacity | Recommendation Recommendation 1 - Revised by EC 9/16/99 Recommendation 2 |
|||||
R98011 | WGQ | Add new standards and definitions to standardize the PDA/ Allocation process and standardize the terms parties use when referring to various processes known as allocation. | TransCapacity | Recommendation Recommendation 1 - Revised by EC 9/16/99 Recommendation 2 |
|||||
R98010 | WGQ | Add the data element "Payment Remittance Total Amount" to the Payment Remittance data dictionary. | Exxon | Recommendation | |||||
R98009 | WGQ | Add the data element "Remit to Party" to the Statement of Account and the Payment Remittance data dictionaries. | Exxon | Recommendation | |||||
R98008 | WGQ | Add the data elements Offer Number and Replacement Shipper's Contract Number to the Invoice. | Columbia Gas Transmission | Recommendation | |||||
R98007 | WGQ | Add a quantity field to the invoice, the Maximum Daily Quantity (MDQ). | Columbia Gas Transmission | Recommendation | |||||
R98006 | WGQ | Change the definition and condition of Allocation Rank Level so that it may be used with the "swing" Allocation Method. | Columbia Gas Transmission | Recommendation | |||||
R98005 | WGQ | Modify standards 2.4.4 and 3.4.1 for conforming changes such that the field "Package ID" is conditional usage consistent with the requirements of standard 1.3.24. | TransEnergy Management | Recommendation | |||||
R98004 | WGQ | Develop an energy industry standardized continuing guaranty similar in form to a GISB contract. | Idaho Power Company | ||||||
R98003 | WGQ | Revise the Transportation Invoice as follows: Method 1 - Use the ITA12 element in the ITA segmetn to send the quantity that may be accumulated by the shipper to arrive at a total quantity for a point with a contract. Recommend that this be a mandatory field or Method 2 - Create a new ITA segment and map the charge type, price tier and a new data element Charge Type Rate to this lower level of detail; these would be mandatory data elements. | Enron Capital & Trade Resources | ||||||
R98002 | WGQ | Develop a contract that could be used for the long and short term sale of natural gas and EFPs as well as having a rider for long and short term electrical power and generating capacity. | American Electric Power | ||||||
R98001 | WGQ | Modify the usage or condition of Associated Contract in the PDA and Allocation Statement. | Columbia Gas Trans. | Recommendation | |||||
R97128 | WGQ | Add new Service Code values to the Invoice. Additional values are needed to identify Firm Gathering Service, Interruptible Gathering Service and Gas Processing Service. | Columbia Gas Trans. | Recommendation | |||||
R97127 | WGQ | For locations and entities, add an error message that indicated "Inactive" (for example, in active Upstream ID). | Columbia Gas Trans. | Recommendation | |||||
R97126 | WGQ | Add an error code and message to "Table A - Internet EDM Standard Error Codes and Messages". An EDM error is needed for EDI translation errors. | Columbia Gas Trans. | Recommendation | |||||
R97125 | WGQ | Add a data element to Confirmation transactions pursuant to GISB Standard 1.4.4 which will provide the "available capacity" at the interconnect point level. This would be a "mutually agreeable" data element. | SoCal Gas, EPNG, Mojave PL | Withdrawn by Submitter | |||||
R97124 | WGQ | Specify the use of a current ANSI mandatory data element (assigned Identification, P01 01) and add it as a business data element to the 855 Nomination Quick Response document. | TransCapacity | Recommendation
Revised Recommendation Recommendation - 2nd Revised |
|||||
Intraday | WGQ | FERC | Revised Recommendation | ||||||
R97123 | WGQ | When a pipeline invoice due date is also a non-business day, the payment date should be determined by whether the previous day is a business day. | National Fuel Gas Dist. | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R97122 | WGQ | Add a code value to the UPPD Status code data element in the Upload to Pipeline of Prearranged Deal - Validation (GISB Standard 5.4.8). | TransCapacity | ||||||
R97121 | WGQ | Add a new Standard to the Nominations Related Standards to enable service requesters to contract with third-party agents which agents would provide required fuel at appropriate points. | TransCapacity | ||||||
R97120 | WGQ | Adopt and publish as a GISB Standard the file format for downloads of a Transportation Service Provider's Index of Customers as that specified by the FERC in Order No. 581. | TransCapacity | ||||||
R97119 | WGQ | Add a new GISB Business Practice Standard to the Electronic Delivery Mechanism Related Standards describing the Transportation Service Provider's responsibility in terms of e-mailing of Operational Flow Orders (OFO's) and Critical Notices. | TransCapacity | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R97118 | WGQ | Add two new codes to the Transaction Type data element to
delineate nominations of imbalance trades across contracts in the Nomination and nomination
related data sets. Please refer to 1997AP7 |
TransCapacity | Revised Recommendation 1 - as adopted by the EC on 7/15/99
Recommendation 2 |
|||||
R97117 | WGQ | Add two new business practice standards, one new assoicated
dataset (EDI document) to facilitate the posting of Shippers' Imbalances, and a new code value
for the Data Sets Requested data element in the Upload of Request for Download of Posted Data
Sets (GISB Standard No. 5.4.14) and Response to Upload of Request for Download of Posted Data
Sets (GISB Standard No. 5.4.15). Please refer to 1997AP7 |
TransCapacity | Revised Recommendation 1 - as adopted by the EC on 7/15/99
Recommendation 2 |
|||||
R97116 | WGQ | Add a new business practice standard and an assoicated data element to the Nomination and Scheduled Quantity datasets. | TransCapacity | Recommendation | |||||
R97115 | WGQ | Modify "Condition" of Delivery Location, Downstream Identifier Code, Receipt Location and Upstream Identifier Code in Standard 1.4.1 - Nomination dataset to correspond to the instructions for Interpretations 7.3.8, 7.3.9, 7.3.10 and 7.3.11. | Altra Energy | Recommendation | |||||
R97114 | WGQ | Reclassify usage of data elements bid number and offer number from mandatory to business conditional in the Upload to Pipeline of prearranged Deals (UPPD) Bidder Confirmation and UPPD Bidder Validation documents. | TransCapacity | ||||||
R97113 | WGQ | Reclassify Standards 2.3.14, 2.3.26, and 3.3.15 to the category of "Principles". | Exxon Company USA | ||||||
R97112 | WGQ | Create a new business practice standard for storage, makeup and pooling nominations to be regarded as stand-alone nominations accepted or rejected on their own merit. | TransCapacity | ||||||
R97111 | WGQ | Modify the Capacity Release UPPD and Bidder Confirmation datasets to enable Releasing Shippers (without pre-arranged bidders) and bidders (in addtion to pre-arranged bidders) to employ the EDI datasets to effectuate capacity release transactions other than through on-line EBBs. | TransCapacity | Recommendation
Revised Recommendation B - as adopted by the EC on 7/15/99 |
|||||
R97110 | WGQ | The time appearing in the field "Posting Date/Time" should be the time that the completed Offer, Bid, Award, and Notice of Withdrawal (as applicable) first appeared on the Transportation Service Provider's Electronic Bulletin Board (EBB) as a completed activity (or reached the completed state, in the event there was no EBB involved in the transaction. | TransCapacity | Recommendation | Request for Comments due May 11, 2005 |
||||
R97109 | WGQ | Change the field length of contract numbers associated with Standards No. 1.4.x, 2.4.x, 3.4.x and 5.4.x and their related implementation guides and change the remittance numbers associated with Standard No. 3.4.2 and related implementation guide items to utilize a field length of 12 characters instead of the current 30-character field length. | INGAA | Recommendation | |||||
R97108 | WGQ | Change the usage code of the Capacity Type Indicator contained in Standard 1.4.1 from Mutually Agreeable (MA) to Business Conditional (BC). | Texas Gas Transmission | Recommendation A
Recommendation B |
|||||
R97107 | WGQ | Add an optional ASC X12 name segment, N1, to send/receive meters in the GISB Measurement Information Report. | Texaco/El Paso Energy | ||||||
R97106 | WGQ | Add two code values (one warning and one error) for the validation code element in the nomination Quick Response transaction. | Enron Interstate Pipelines | ||||||
R97105 | WGQ | Modify Standard 1.3.27 to remove the data element "service proivder activity code" from the set of data elements which defines the key of the nomination. | TransCapacity | ||||||
R97104 | WGQ | Add a new standard to the current GISB Electronic Delivery Mechanisms standards to address testing. | TransCapacity | Recommendation | |||||
R97103 | WGQ | Develop version and revision level of technology standards. | Future Technology Task Force | ||||||
R97102 | WGQ | Develop standards to ensure a common "look and feel" for internet web page development and operations. | Natural Gas Clearinghouse | Recommendation | |||||
R97101 | WGQ | Technical Subcommittee recommended corrections to clean up version 1.2 | Technical Subcommittee | Recommendation - Same as Request | |||||
R97100 | WGQ | Technical Subcommittee recommended corrections to clean up version 1.2 | Technical Subcommittee | Recommendation - Same as Request | |||||
R97099 | WGQ | Technical Subcommittee recommended corrections to clean up version 1.2 | Technical Subcommittee | Recommendation - Same as Request | |||||
R97098 | WGQ | Technical Subcommittee recommended corrections to clean up version 1.2 | Technical Subcommittee | Recommendation - Same as Request | |||||
R97097 | WGQ | Technical Subcommittee recommended corrections to clean up version 1.2 | Technical Subcommittee | Recommendation - Same as Request | |||||
R97096 | WGQ | Create a standard contract for day trades. | El Paso Energy Marketing | Recommendation as Amended April 16, 1998 | |||||
R97095 | WGQ | Add a data element, Payment Method Code, to the Data Dictionary for the Payment Remittance (Standard 3.4.2) dataset. | Transco | Recommendation | |||||
R97094 | WGQ | Add two data elements to the Payment Remittance (Standard 3.4.2) dataset, the ABA Number (bank identification code) and the bank account number to which payment was made. | Transco | Recommendation | |||||
R97093 | WGQ | Add three data elements with the usage code of mutually agreeable to the imbalance statement: shrinkage gas quantity, flash gas quantity, lost/unaccounted for gas quantity. | Transco | Recommendation | |||||
R97092 | WGQ | Add a new Invoicing-related Standard to describe the timeliness requirements of the Payment Remittance statement. | Transco | Recommendation | |||||
R97091 | WGQ | Add a new Invoicing-related Standard to describe the timeliness requirements of the Payment Remittance statement. | Transco | Recommendation with Recommended Action (Item 1) Corrected | |||||
R97090 | WGQ | Add a data element, Service Requester Contract, to the data dictionary for the Statement of Account (Standard 3.4.3) dataset with usage code Mutually Agreeable (MA). | Transco | ||||||
R97089 | WGQ | Add a data element, Source Location, to the Nominations transaction. | Transco | Withdrawn by Submitter | Recommendation B | ||||
R97088 | WGQ | Add a data element called Capacity Release Cross Reference Contract to the data dictionary for the Invoice dataset (Standard 3.4.1) with usage code Sender's Option (SO). | Transco | Recommendation | |||||
R97087 | WGQ | Add three data elements to the PDA and Allocation Statement transactions: receipt location, delivery location, and transaction type. | Transco | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R97086 | WGQ | Add a data element -- statement type, to the Imbalance Statement transaction, with a usage code of mutally agreeable. | Transco | Recommendation | |||||
R97085 | WGQ | Add a data element, pressure base, to the existing Measurement Information report (2.4.5). Add an optional MEA (measurement) segment to the existing Measurement Information report (2.4.5). | Texaco | ||||||
R97084 | WGQ | Add several code values to the Adjustment Type data element in the Measurement Information document (Standard 2.4.5). These same code values were added to the Measured Volume Audit Statement (Standard 2.4.6); ratified by GISB membership on February 28, 1997. | Enron Interstate Pipelines | Recommendation | |||||
R97083 | WGQ | Modify GISB Standard 1.3.1 from 9:00 a.m. to 9:00 a.m. central clock time to 9:00 a.m. to 9:00 a.m. central clock time for gas day. | KN Energy | ||||||
R97082 | WGQ | Add two Transaction Type code values to the Nomination Transaction Type table. | Florida Gas Transmission | Withdrawn by Submitter | |||||
R97081 | WGQ | Add a code of "RD" to the BAK02 element of the 855RRFC transaction. Add (an) error/reduction reason code(s) to notify the operator of error(s). | El Paso Energy | ||||||
R97080 | WGQ | Add two new data elements to the Confirmation Response document -- confirmation provider's tracking ID, Unsolicited Confirmation Response Indicator, and one data element to the Operator Scheduled Quantity Document -- confirmation provider's tracking ID. | TransCapacity | Recommendation 1 Recommendation 2 |
|||||
R97079 | WGQ | Add a new code value to the existing data element 'Transaction Status Code' in the Nomination Quick Response (QR) to indicate a 'Partial Response - details for processed nominations follow. | TransCapacity | Recommendation | |||||
R97078 | WGQ | Add a data element for a Storage Flag on the request for confirmation and confirmation request transactions. | Southern Natural Gas | ||||||
R97077 | WGQ | Add a data element for Scheduled Service to the nominations and scheduled quantities transactions. | Southern Natural Gas | ||||||
R97076 | WGQ | Add a data element for Package ID to the request for confirmation and confirmation response transactions. | Southern Natural Gas | Recommendation - Revised with Additional Reference Information | |||||
R97075 | WGQ | Add a data element for Storage Service to the nominations, request for confirmation, confirmation response and scheduled quantities transactions. | Southern Natural Gas | ||||||
R97074 | WGQ | Add a data element for a Force Balance Flag to the nominations transaction. | Southern Natural Gas | ||||||
R97073 | WGQ | Add a data element for offer # to the nominations and scheduled quantities transactions. | Southern Natural Gas | ||||||
R97072 | WGQ | Add a data element for a Force Balance Flag to the nominations transactions. | Southern Natural Gas | ||||||
R97071 | WGQ | Add a new standard or standards language to the current GISB Electronic Delivery Mechanism standards. The proposed standards address the use of ISA (Envelope) Sender Identification codes when sending EDI files. | TransCapacity | ||||||
R97070 | WGQ | Add three codes to transaction type for contract demand limit overrun - fronthaul, shorthaul and backhaul. | El Paso Natural Gas | Recommendation | |||||
R97069 | WGQ | Standardize the dekatherm abbreviation to Dth in all GISB standards. | Texaco | Recommendation | |||||
R97068 | WGQ | Revise the SAC Segment in Capacity Release - Upload to the Pipeline of Prearranged Deal X12 transaction from Mandatory to Conditional, required when the biddable deal indicator is "Y" or the lesser rate indicator is "Y". | Enron Interstate Pipelines | Recommendation | |||||
R97067 | WGQ | Revise the usage of Rate Identification Code in the Capacity Release - Upload to the Pipeline of Prearranged Deal from Mandatory to Conditional. | Enron Interstate Pipelines | Recommendation | |||||
R97066 | WGQ | Revise the SAC Segment in Capacity Release - Firm Transportation and Storage - Offer X12 transaction from Mandatory to Conditional, required when the lesser rate indicator is "Y". | Enron Interstate Pipelines | Recommendation | |||||
R97065 | WGQ | Revise the usage of Rate Identification Code in the Capacity Release - Firm Transportation and Storage Offer - from Mandatory to Conditional. | Enron Interstate Pipelines | Recommendation | |||||
R97064 | WGQ | Correct the GISB implementation quides to use approved ASC X12 code values through requests to X12 to adopt the GISB codes, or through changes to the code values to use the X12 specified codes. | Texaco | Revised Recommendation A
Recommendation B Recommendation C Recommendation D - part 1 Recommendation D - part 2 Recommendation E Recommendation F Recommendation G Recommendation H (09/26/2011) Rec H - Attachment 1 Rec H - Attachment 2 Rec H - Attachment 3 Rec H - Attachment 4 Rec H - Attachment 5 Recommendation I (9/3/2014) |
Request for Comments Due October 26, 2011 Comments Submitted by the WGQ IR/Technical Chairs Request for Comments Due October 2, 2014 |
||||
R97063 | WGQ | Modify the GISB Base Contract for Short Term Purchases and Sales of Natural Gas to include the Fund Transfer Agency concept -- using two related agreements. | DOE/Natural Gas & Petroleum Tech. |
Recommendation | |||||
R97062 | WGQ | Add a mandatory data element, "Scheduled Quantity Statement Type", to the Scheduled Quantity transaction. | TransCapacity | Recommendation | |||||
R97061 | WGQ | Modify GISB Standard 1.3.14 to include terms for nominations on distribution systems behind city gates or for nominations by retail end users. | TransCapacity | ||||||
R97060 | WGQ | Adopt a short term Trading Partner Agreement as a GISB Operating Practice. | Enron Capital & Trade | Recommendation 1
Recommendation 2 |
|||||
R97059 | WGQ | Classify the methods of transporting gas for processing and identify those methods in the nomination process. | TransCapacity | ||||||
R97058 | WGQ | Add ability to use a transportation service provider's proprietary identifer when a trading partner's D-U-N-S number as not yet been issued or may not exist. | TransCapacity | Staffed Recommendation
Recommendation B - as adopted by the EC on 5/20/99 - (Revised 7/9/99) Recommendation B |
|||||
R97057 | WGQ | Add a data element, Validation Code, to the Confirmation Response. | Columbia Gas Transmission | Recommendation Recommendation B |
|||||
R97056 | WGQ | Rename the data element "confirmation requester's tracking number" to "confirmation requester's tracking ID" in the Request for Confirmation and Confirmation Response Transactions and clarify that the data element contains alpha-numberic data. | TransCapacity | Recommendation | |||||
R97055 | WGQ | Rename the data element "Nominator's Tracking Number" to "Nominator's Tracking ID" for the Nomination, Nomination Quick Response and Scheduled Quantity, transactions and clarify that the data element value contains alpha-numeric data. | TransCapacity | Recommendation | |||||
R97054 | WGQ | Add a new data element "Detail Code" to the Request for Confirmation and Confirmation Response transactions. | Columbia Gulf | Recommendation | |||||
R97053 | WGQ | Add a new business practice standard for capacity release: "All Capacity Release business practices with respect to rates, charges and surcharges, should be accommodated through one or more of the following manners: 1) total reservation charge/unit of reserved service, 2) total usage charge/unit of provided (or minimum commitment quantity of) service, 3) total surcharge/contract (unrelated to units of service reserved or provided), 4) total demand surcharges/unit of reserved service, or 5) total of usage surcharges/unit of provided (or minimum commitment quantity of) services. | TransCapacity | Recommendation | |||||
R97052 | WGQ | Modify GISB Standard 5.3.27 for more specificity in minimum/maximum rates specified by the releasing shipper. | TransCapacity | Recommendation | |||||
R97051 | WGQ | Remove the data element "Service Provider's Activity Code" from the transaction key defined in GISB standard 1.3.27. | Transco | Recommendation | |||||
R97050 | WGQ | Add all data elements in the Nominations transaction key to the data dictionary for the Invoice Data Set. | Transco | Recommendation | |||||
R97049 | WGQ | Add four code values to the allocation type codes in the PDA Data Set - Multi-level Operator, Multi-level Producer, Multi-level First Supplier, Multi-level Last Supplier. | Transco | Withdrawn by Submitter | Revised Recommendation - as adopted by the EC on 12/17/98 | ||||
R97048 | WGQ | Add data elements "First Supplier" and "Last Supplier" to the Nomination, Scheduled Quantity, Imbalance Statement, and Invoice Data Sets with appropriate error messages developed for Nomination Quick Response. | Transco | Withdrawn by Submitter | |||||
R97047 | WGQ | Add the data element "Source Location" to the Nominations, Scheduled Quantity, PDA, Shipper Imbalance, Allocation Statement, Invoice and Request for Confirmation Data Set with corresponding error codes defined for Nomination Quick Response and PDA Quick Responses. | Transco | ||||||
R97046 | WGQ | Add two definitions to the GISB Business Practice Standards for Transportation and Transportation Service Provider. | TransCapacity | Recommendation | |||||
R97045 | WGQ | Modify the list of permitted qualifiers for point code to include "Service Provider's Proprietary Point Code" with a description of only to be used when there is no verified DRN number. | TransCapacity | Recommendation | |||||
R97044 | WGQ | Modify the reduction reason codes of the Confirmation Response and Scheduled Quantity for consistency. | El Paso Natural Gas | Recommendation
Recommendation A |
|||||
R97043 | WGQ | Add a data element for Interest Owner to the Nominations, Request for Confirmation, Confirmation and Scheduled Quantities Transactions. | Southern Natural Gas | Revised Recommendation - as adopted by the EC on 12/17/98
Recommendation |
|||||
R97042 | WGQ | Add a charge type of "Prepayment Credit" to the Transportation/Sales invoice. | Northern Border | ||||||
R97041 | WGQ | Add a new fuel reimbursement option to the nominations related data sets allowing separate nominations for fuel gas. | NGC | ||||||
R97040 | WGQ | Add a new final dispostion response code "U6" -- Contract Validation Error to be used during the capacity release award process. | Texas Gas Transmission | Recommendation | |||||
R97039 | WGQ | Add two codes to the data element capacity type indicator in the nominations and the scheduled quantity data sets -- tertiary to primary, tertiary to secondary. | Tennessee Gas Pipeline | Recommendation | |||||
R97038 | WGQ | Add additional reduction reason codes to the Scheduled Quantity Data Set -- no delivery nomination, no supply. | NorAm | Recommendation | |||||
R97037 | WGQ | Develop a standard data format for sharing operational data between pipeline operators having physical pipe-to-pipe connections. | CNG | ||||||
R97036 | WGQ | Modify the GISB Implementation Guides to reflect the changes needed to support the Pathed Non-Threaded Model for Pre-Determined Allocation and Allocation Statement transactions. | KGPC and NGPL | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R97035 | WGQ | Modify the model trading partner agreement to accommodate the use of Internet electronic delivery mechanism. | FTTF | Corrected Recommendation | |||||
R97034 | WGQ | Add a service code to the invoice transaction data set -- balancing service. | Transwestern Pipeline | ||||||
R97033 | WGQ | Add additional tie breaking methods codes for the Upload of Pre-Arranged Deals transaction set -- pro-rata lottery and first come/first serve. | Transwestern & NNG | ||||||
R97032 | WGQ | Add a charge type code of Enrate to the Invoice transaction set. | Transwestern Pipeline | Withdrawn by Submitter | |||||
R97031 | WGQ | Add two data elements to the Invoice Document - invoice level charge/allowance descriptor and invoice level charge/allowance amount, both with usage codes of SO. | Market Settlement Task Force | Recommendation Recommendation A Recommendation B Recommendation C |
|||||
R97030 | WGQ | Add standards for shipper discount rates and include discount codes in the nomination process (previously AP9601). | NorAm Energy Services | ||||||
R97029 | WGQ | Add transaction type to the invoice as a mandatory data element including a description of the technical implementation and the addition of three codes for the data element -- gathering, unauthorized overrun, and capacity release. | Market Settlement Task Force | Recommendation | |||||
R97028 | WGQ | Change the conditionality of Receipt and Delivery Location in the GISB Invoice document to be based on location indicator rather than service code. | Market Settlement Task Force | Recommendation1 Recommendation2 |
|||||
R97027 | WGQ | Add three values for service code for operational balancing, imbalance settlement and plant thermal reduction for the invoice and payment remittance documents. | Market Settlement Task Force | Recommendation | |||||
R97026 | WGQ | Add language in the Technical Implementation of Business Process for the GISB Transportation/Sales Invoice regarding charge type. | Market Settlement Task Force | Recommendation | |||||
R97025 | WGQ | Modify the language of Standard 3.3.5. | Market Settlement Task Force | Recommendation | |||||
R97024 | WGQ | Modify GISB Standard 4.3.1 to reflect the Electronic Delivery Mechanism standards adopted in September 1996. | FTTF | Recommendation - Same as Request | |||||
R97023 | WGQ | Further define GISB Standard 4.3.6 on formats for non-transactional data. | FTTF | Recommendation | |||||
R97022 | WGQ | Add two data elements to the nominations related data sets -- upstream package ID and downstream package ID. | EPNG | Recommendation
Recommendation A Recommendation B |
|||||
R97021 | WGQ | Add "Adjustment Type" code values to the Measurement Information Statement. | Market Settlement Task Force | Recommendation1
Recommendation2 |
|||||
R97020 | WGQ | Modify the shipper imbalance statement for use with all nomination model types. | Market Settlement Task Force | Recommendation 1
Recommendation 2 Recommendation 3 Revised Recommendation |
|||||
R97019 | WGQ | Add additional elements for Provider, Supplier and Provider Contract to the Nominations dataset. | NorAm | Revised Recommendation - as adopted by the EC on 12/17/98 | |||||
R97018 | WGQ | Add error codes to the Nominations Quick Response dataset. | NorAm | Recommendation | |||||
R97017 | WGQ | Form a task force to study the implementations of intra day noms and develop standards to achieve a seamless implementation. | Texaco | Recommendation | |||||
R97016 | WGQ | Modify the mapping of the rate segment in capacity release. | PEC | Recommendation | |||||
R97015 | WGQ | Add additional Rate Identification Codes and Surcharge Identification Codes to 5 Capacity Release datasets. | PEC | Recommendation | |||||
R97014 | WGQ | Modify the mapping of the Response Reason Code. | PEC | ||||||
R97013 | WGQ | Modify the usage of the Contingency End Date/Time. | PEC | ||||||
R97012 | WGQ | Modify the mapping of the UPPD Number. | PEC | ||||||
R97011 | WGQ | Add Bidder Company Code to the detail on the Final Disposition. | PEC | Recommendation
Recommendation - Revised |
|||||
R97010 | WGQ | Add Rate Identification Code and Surcharge Identification Code to the UPPD Validation. | PEC | Recommendation | |||||
R97009 | WGQ | Add a comment segment to the Withdrawal Upload and Withdrawl Download datasets. | PEC | Recommendation1 Recommendation2 |
|||||
R97008 | WGQ | Add Stand Alone Terms to the Offer Download. | PEC | Recommendation A Recommendation B |
|||||
R97007 | WGQ | Add a data element to allow the customer to choose whether contact information is displayed / downloaded. | PEC | ||||||
R97006 | WGQ | Modify the PDA dataset to indicate the swing contract. | Koch Gateway | Recommendation | |||||
R97005 | WGQ | Add a volume type to the Nomination and Schedule Quantity data sets. | NNG | ||||||
R97004 | WGQ | Add 5 new Charge Type codes to the Transportation/ Sales Invoice. | Koch Gateway | Recommendation | |||||
R97003 | WGQ | Add validation codes to the UPPD Validation. | Transwestern | Recommendation | |||||
R97002 | WGQ | Modify the definition of Preparer ID. | Columbia Gas | Recommendation | |||||
R97001 | WGQ | Update the Invoice to include the Line Number only in the Sub-detail. | Columbia Gas | Recommendation | |||||
R96131 | WGQ | Update Flowing Gas Implementation Guide to expand discussion and examples pertaining to Volume Allocations Statement. | Market Settlement Task Force | Recommendation
Revised Recommendation 2 - as adopted by the EC on 7/15/99 |
|||||
R96130 | WGQ | Add transaction type indicators to delineate receipt deficiency and tender deficiency nominations. | Northern Border | Recommendation | |||||
R96129 | WGQ | Add a new capacity type indicator and associated error/warning messages to the Nomination, Nomination Quick Response, and Scheduled Quantity data sets to identify interruptible gas delivered to a firm contract. | Northern Border | ||||||
R96128 | WGQ | Add data elements "Location" and "Beginning Date/Time" to the PDA Quick Response to allow the receiver of the PDA to pinpoint errors to a single location. | Columbia Gulf | ||||||
R96127 | WGQ | Add a data element to the Payment Remittance data set to indicate the reasons for non-payment. | Columbia Gulf | ||||||
R96126 | WGQ | Add a data element to the Payment Remittance data set to indicate the party being paid. | Columbia Gulf | Recommendation | |||||
R96125 | WGQ | Add a data element to the PDA, PDA Quick Response and Allocation Statement data sets to identify the level of allocation. | Columbia Gulf | Recommendation1
Recommendation2 Revised Recommendation A - as adopted by the EC on 7/15/99; |
|||||
R96124 | WGQ | Modify Shipper Imbalance Transaction so that it supports the Pathed Non-Threaded nomination model. | NGPL | Recommendation 1
Recommendation 2 Revised Recommendation |
|||||
R96123 | WGQ | Add a data element, Balancing Agreement, to the UPPD - Bidder Confirmation and UPPD - Bidder Confirmation Validation Capacity Release Data Sets. | Columbia Gas | Recommendation | |||||
R96122 | WGQ | Add 2 new code values to Service Code on the Transportation/Sales Invoice. | ANR | Recommendation | |||||
R96121 | WGQ | Add clarifying descriptions to 2 code values on the Charge Type on the Transportation/Sales Invoice. | ANR | Recommendation1 Recommendation2 Recommendation A-1 Recommendation A-2 Recommendation A-3 Recommendation A-4 Recommendation A-5 Recommendation A-6 Recommendation A-7 Recommendation A-8 Recommendation A-9 Recommendation A-10 Recommendation A-11 Recommendation A-12 Recommendation A-13 Recommendation A-14 Recommendation A-15 Recommendation A-16 Recommendation A-17 Revised Recommendation A-18 Recommendation A-19 Recommendation A-20 Recommendation A-21 Recommendation A-22 Recommendation A-23/R07011 |
Request for Comments due November 5, 2008 | ||||
R96120 | WGQ | Add 4 new code values to Charge Type on the Transportation/Sales Invoice. | ANR | Recommendation | |||||
R96119 | WGQ | Add a new data element, Indemnification Clauses, to datasets in Capacity Release Standards. | Columbia Gas | Recommendation | |||||
R96118 | WGQ | Add two code types of "Capacity Discount" and "Market Affiliates" to the Notice Type on the System-Wide Notice. | Columbia Gas | Recommendation | |||||
R96117 | WGQ | Add a code type of "other" to the Service Code on the Invoice Statement. | Columbia Gas | ||||||
R96116 | WGQ | Add minimum, maximum and bid point level quantity elements to the Upload to Pipeline of Prearranged Deal data set and other applicable capacity release data sets. | PEC | Revised Recommendation | |||||
R96115 | WGQ | Create a dataset for acceptance or errors/warnings for the Capacity Release Withdrawal Data Set. | PEC | Withdrawn by Submitter | |||||
R96114 | WGQ | Eliminate seconds from the Upload to Pipeline of Prearranged Deal elements for Contingency End Date/Time, Bid Period Start Date/Time, Bid Period End Date/Time, Prearranged Deal Match Date/Time. | PEC | ||||||
R96113 | WGQ | Limit the length of the UPPD Number to 10 characters in the Upload to Pipeline of Prearranged Deal. | PEC | ||||||
R96112 | WGQ | Identify and assign adjustment reason codes for prior period adjustments on the Measurement Information Statement. | NNG & TWPL | Recommendation | |||||
R96111 | WGQ | Add reduction reason codes to Confirmation Response. | PEC | ||||||
R96110 | WGQ | Add two business conditional data elements, Aggregator's Suppply Point and Aggregater's Supplier to Confirmation, Confirmation Resonse and Allocation data sets. | PEC | Recommendation | |||||
R96109 | WGQ | Add reduction reason codes to Scheduled Quantity 12/97. | PEC | ||||||
R96108 | WGQ | Add error codes and warning codes to Nomination Quick Response. | PEC | Recommendation | |||||
R96107 | WGQ | Add data element "Previous Balance Forward" to Invoice data dictionary. | PEC | Recommendation | |||||
R96106 | WGQ | Modify usage requirement of Contact Person in all Flowing Gas and Invoicing Related Standards dictionaries. | PEC | Recommendation | |||||
R96105 | WGQ | Add additional error codes and warning codes to Pre-determined Allocation Quick Response. | PEC | Recommendation | |||||
R96104 | WGQ | Modify definition of Limit Value in Pre-determined Allocation data dictionary. | PEC | Recommendation | |||||
R96103 | WGQ | Modify Invoice dataset, Beginning Flow Date/Time and Ending Flow Date/Time to be Beginning Production Period and Ending Production Period. | PEC | Recommendation | |||||
R96102 | WGQ | Modify Remittance Number element in Payment Remittance dataset to limit field size. | PEC | Recommendation | |||||
R96101 | WGQ | Modify usage requirement of Service Requester and Account Number in Payment Remittance and Invoice datasets. | PEC | Recommendation | |||||
R96100 | WGQ | Modify the Payment Remittance to allow for multiple service requesters per billable party. | PEC | Recommendation | |||||
R96099 | WGQ | Modify the UPPD Validation to include location information for error conditions. | NNG | Recommendation | |||||
R96098 | WGQ | Modify the Transportation/Sales Invoice "Charge Type" element to add codes values. | FGT | Recommendation | |||||
R96097 | WGQ | Modify the level of response on the Nomination Quick Response from Transaction level to Contract level. | Enron (NNG, FGT, TWPL) | Recommendation | |||||
R96096 | WGQ | Modify the usage code of the Charge Type element on the Transportation/Sales Invoice. | FGT | ||||||
R96095 | WGQ | Add a code value to the Transportation / Sales Invoice "Charge Indicator" element. | FGT | ||||||
R96094 | WGQ | Add the Surcharge Identification Code values from the UPPD to the UPPD - Validation document's Surcharge Identification Code element values. | FGT | Recommendation | |||||
R96093 | WGQ | Modify the Notes/Special Instruction document to remove the Gas Transaction Point. | FGT | Recommendation | |||||
R96092 | WGQ | Modify the allocation statement data dictionary so that Beginning Flow Date/Time and Ending Flow Date/Time are split into four elements. | PEC | Recommendation | |||||
R96091 | WGQ | Add a Return Addressee company code to the Notes/ Special Instructions document for UPPD purposes. | FGT | Recommendation | |||||
R96090 | WGQ | Add a business conditional indicator to the UPPD and UPPD-Notify and Request to Confirm to allow releasing shippers to release their right to change points. | FGT | Recommendation | |||||
R96089 | WGQ | Add Replacement Shipper Contract Number to UPPD and UPPD-Notify and Request to Confirm. | FGT | Recommendation | |||||
R96088 | WGQ | Add new code values for Service Code to the Transportation / Sales Invoice. | Koch Gateway | Recommendation | |||||
R96087 | WGQ | Modify the nominations transactions to add additional values to transaction type data element. | CNG | Recommendation | |||||
R96086 | WGQ | Modify the capacity release transactions to add surcharge identificiation codes. | CNG | Recommendation | |||||
R96085 | WGQ | Modify the nomination transactions to add reduction reason codes. | CNG | Recommendation | |||||
R96084 | WGQ | Modify the invoice transaction to add charge type codes. | NNG | Recommendation | |||||
R96083 | WGQ | Modify the statement of account transaction usage code for date element. | NNG | Recommendation | |||||
R96082 | WGQ | Modify the capacity release offer review, award notice, upload of pre-arranged deals and upload of pre-arranged deals request to confirm transactions to add rate identification code and a conforming change to upload of pre-arranged deals surcharge identification codes. | NNG | Recommendation | |||||
R96081 | WGQ | Modify the scheduled quantity and confirmation response transactions to add additional reduction reason codes. | NNG & TWPL | Recommendation | |||||
R96080 | WGQ | Modify the measurement information and allocation statement transactions to add contact information at the detail level. | NGPL | Recommendation | |||||
R96079 | WGQ | Modify the nomination quick response transaction to add a warning message. | NorAm | ||||||
R96078 | WGQ | Modify the GISB Standard 1.3.1 regarding implementation date. | PSE&G | ||||||
R96077 | WGQ | Modify the nominations related standards to conform to GISB business practices. | Mk Exec Task Force | ||||||
R96076 | WGQ | Modify the upload of pre-arranged deals transaction to add new status codes. | Koch Gateway | Recommendation | |||||
R96075 | WGQ | Modify the capacity release related transactions to add an additional data element - indemnification clauses. | Columbia Gas Trans | Recommendation | |||||
R96074 | WGQ | Modify the capacity release related transactions to add notice types. | Columbia Gas Trans | Recommendation | |||||
R96073 | WGQ | Modify the invoice transaction to add service codes. | Columbia Gas Trans | Recommendation | |||||
R96072 | WGQ | Modify the scheduled quantity transaction to add additional reduction reason codes. | NNG & TWPL | Recommendation | |||||
R96071 | WGQ | Modify the nomination quick response transaction to add status of nomination. | Enron | Recommendation | |||||
R96070 | WGQ | Modify the nomination transaction to add an additional capacity type of primary firm. | NNG | Recommendation | |||||
R96069 | WGQ | Modify the nomination quick response transaction to add a warning message. | EPNG | Recommendation | |||||
R96068 | WGQ | Modify the nominations and shipper imbalance transaction to add transaction type codes. | EPNG | Recommendation | |||||
R96067 | WGQ | Modify nominations transaction to add an additional option for capacity type. | Northern Natural | Recommendation | |||||
R96066 | WGQ | Modify the Transportation/Sales Invoice to add two data elements -- electronic funds transfer due data, and electronic funds transfer remittance address. | EPNG | Recommendation | |||||
R96065 | WGQ | Modify Standard 3.3.14 to define rendered as "post-marked for U.S. Postal Service delivery of communication, time-stamped for facsimile communication and time-stamped and delivered to the designated site for electronic communication." | MSTF | Recommendation | |||||
R97064 | WGQ | Correct the GISB implementation quides to use approved ASC X12 code values through requests to X12 to adopt the GISB codes, or through changes to the code values to use the X12 specified codes. | Texaco | Revised Recommendation A
Recommendation B Recommendation C Recommendation D - part 1 Recommendation D - part 2 Recommendation E Recommendation F Recommendation G |
|||||
R97063 | WGQ | Modify the GISB Base Contract for Short Term Purchases and Sales of Natural Gas to include the Fund Transfer Agency concept -- using two related agreements. | DOE/Natural Gas & Petroleum Tech. |
Recommendation | |||||
R97062 | WGQ | Add a mandatory data element, "Scheduled Quantity Statement Type", to the Scheduled Quantity transaction. | TransCapacity | Recommendation | |||||
R97061 | WGQ | Modify GISB Standard 1.3.14 to include terms for nominations on distribution systems behind city gates or for nominations by retail end users. | TransCapacity | ||||||
R97060 | WGQ | Adopt a short term Trading Partner Agreement as a GISB Operating Practice. | Enron Capital & Trade | Recommendation 1
Recommendation 2 |
|||||
R97059 | WGQ | Classify the methods of transporting gas for processing and identify those methods in the nomination process. | TransCapacity | ||||||
R97058 | WGQ | Add ability to use a transportation service provider's proprietary identifer when a trading partner's D-U-N-S number as not yet been issued or may not exist. | TransCapacity | Staffed Recommendation
Recommendation B - as adopted by the EC on 5/20/99 - (Revised 7/9/99) Recommendation B |
|||||
R97057 | WGQ | Add a data element, Validation Code, to the Confirmation Response. | Columbia Gas Transmission | Recommendation Recommendation B |
|||||
R97056 | WGQ | Rename the data element "confirmation requester's tracking number" to "confirmation requester's tracking ID" in the Request for Confirmation and Confirmation Response Transactions and clarify that the data element contains alpha-numberic data. | TransCapacity | Recommendation | |||||
R97055 | WGQ | Rename the data element "Nominator's Tracking Number" to "Nominator's Tracking ID" for the Nomination, Nomination Quick Response and Scheduled Quantity, transactions and clarify that the data element value contains alpha-numeric data. | TransCapacity | Recommendation | |||||
R97054 | WGQ | Add a new data element "Detail Code" to the Request for Confirmation and Confirmation Response transactions. | Columbia Gulf | Recommendation | |||||
R97053 | WGQ | Add a new business practice standard for capacity release: "All Capacity Release business practices with respect to rates, charges and surcharges, should be accommodated through one or more of the following manners: 1) total reservation charge/unit of reserved service, 2) total usage charge/unit of provided (or minimum commitment quantity of) service, 3) total surcharge/contract (unrelated to units of service reserved or provided), 4) total demand surcharges/unit of reserved service, or 5) total of usage surcharges/unit of provided (or minimum commitment quantity of) services. | TransCapacity | Recommendation | |||||
R97052 | WGQ | Modify GISB Standard 5.3.27 for more specificity in minimum/maximum rates specified by the releasing shipper. | TransCapacity | Recommendation | |||||
R97051 | WGQ | Remove the data element "Service Provider's Activity Code" from the transaction key defined in GISB standard 1.3.27. | Transco | Recommendation | |||||
R97050 | WGQ | Add all data elements in the Nominations transaction key to the data dictionary for the Invoice Data Set. | Transco | Recommendation | |||||
R97049 | WGQ | Add four code values to the allocation type codes in the PDA Data Set - Multi-level Operator, Multi-level Producer, Multi-level First Supplier, Multi-level Last Supplier. | Transco | Withdrawn by Submitter | Revised Recommendation - as adopted by the EC on 12/17/98 | ||||
R97048 | WGQ | Add data elements "First Supplier" and "Last Supplier" to the Nomination, Scheduled Quantity, Imbalance Statement, and Invoice Data Sets with appropriate error messages developed for Nomination Quick Response. | Transco | Withdrawn by Submitter | |||||
R97047 | WGQ | Add the data element "Source Location" to the Nominations, Scheduled Quantity, PDA, Shipper Imbalance, Allocation Statement, Invoice and Request for Confirmation Data Set with corresponding error codes defined for Nomination Quick Response and PDA Quick Responses. | Transco | ||||||
R97046 | WGQ | Add two definitions to the GISB Business Practice Standards for Transportation and Transportation Service Provider. | TransCapacity | Recommendation | |||||
R97045 | WGQ | Modify the list of permitted qualifiers for point code to include "Service Provider's Proprietary Point Code" with a description of only to be used when there is no verified DRN number. | TransCapacity | Recommendation | |||||
R97044 | WGQ | Modify the reduction reason codes of the Confirmation Response and Scheduled Quantity for consistency. | El Paso Natural Gas | Recommendation
Recommendation A |
|||||
R97043 | WGQ | Add a data element for Interest Owner to the Nominations, Request for Confirmation, Confirmation and Scheduled Quantities Transactions. | Southern Natural Gas | Revised Recommendation - as adopted by the EC on 12/17/98
Recommendation |
|||||
R97042 | WGQ | Add a charge type of "Prepayment Credit" to the Transportation/Sales invoice. | Northern Border | ||||||
R97041 | WGQ | Add a new fuel reimbursement option to the nominations related data sets allowing separate nominations for fuel gas. | NGC | ||||||
R97040 | WGQ | Add a new final dispostion response code "U6" -- Contract Validation Error to be used during the capacity release award process. | Texas Gas Transmission | Recommendation | |||||
R97039 | WGQ | Add two codes to the data element capacity type indicator in the nominations and the scheduled quantity data sets -- tertiary to primary, tertiary to secondary. | Tennessee Gas Pipeline | Recommendation | |||||
R97038 | WGQ | Add additional reduction reason codes to the Scheduled Quantity Data Set -- no delivery nomination, no supply. | NorAm | Recommendation | |||||
R97037 | WGQ | Develop a standard data format for sharing operational data between pipeline operators having physical pipe-to-pipe connections. | CNG | ||||||
R97036 | WGQ | Modify the GISB Implementation Guides to reflect the changes needed to support the Pathed Non-Threaded Model for Pre-Determined Allocation and Allocation Statement transactions. | KGPC and NGPL | Revised Recommendation - as adopted by the EC on 7/15/99 | |||||
R97035 | WGQ | Modify the model trading partner agreement to accommodate the use of Internet electronic delivery mechanism. | FTTF | Corrected Recommendation | |||||
R97034 | WGQ | Add a service code to the invoice transaction data set -- balancing service. | Transwestern Pipeline | ||||||
R97033 | WGQ | Add additional tie breaking methods codes for the Upload of Pre-Arranged Deals transaction set -- pro-rata lottery and first come/first serve. | Transwestern & NNG | ||||||
R97032 | WGQ | Add a charge type code of Enrate to the Invoice transaction set. | Transwestern Pipeline | Withdrawn by Submitter | |||||
R97031 | WGQ | Add two data elements to the Invoice Document - invoice level charge/allowance descriptor and invoice level charge/allowance amount, both with usage codes of SO. | Market Settlement Task Force | Recommendation Recommendation A Recommendation B Recommendation C |
|||||
R97030 | WGQ | Add standards for shipper discount rates and include discount codes in the nomination process (previously AP9601). | NorAm Energy Services | ||||||
R97029 | WGQ | Add transaction type to the invoice as a mandatory data element including a description of the technical implementation and the addition of three codes for the data element -- gathering, unauthorized overrun, and capacity release. | Market Settlement Task Force | Recommendation | |||||
R97028 | WGQ | Change the conditionality of Receipt and Delivery Location in the GISB Invoice document to be based on location indicator rather than service code. | Market Settlement Task Force | Recommendation1 Recommendation2 |
|||||
R97027 | WGQ | Add three values for service code for operational balancing, imbalance settlement and plant thermal reduction for the invoice and payment remittance documents. | Market Settlement Task Force | Recommendation | |||||
R97026 | WGQ | Add language in the Technical Implementation of Business Process for the GISB Transportation/Sales Invoice regarding charge type. | Market Settlement Task Force | Recommendation | |||||
R97025 | WGQ | Modify the language of Standard 3.3.5. | Market Settlement Task Force | Recommendation | |||||
R97024 | WGQ | Modify GISB Standard 4.3.1 to reflect the Electronic Delivery Mechanism standards adopted in September 1996. | FTTF | Recommendation - Same as Request | |||||
R97023 | WGQ | Further define GISB Standard 4.3.6 on formats for non-transactional data. | FTTF | Recommendation | |||||
R97022 | WGQ | Add two data elements to the nominations related data sets -- upstream package ID and downstream package ID. | EPNG | Recommendation
Recommendation A Recommendation B |
|||||
R97021 | WGQ | Add "Adjustment Type" code values to the Measurement Information Statement. | Market Settlement Task Force | Recommendation1
Recommendation2 |
|||||
R97020 | WGQ | Modify the shipper imbalance statement for use with all nomination model types. | Market Settlement Task Force | Recommendation 1
Recommendation 2 Recommendation 3 Revised Recommendation |
|||||
R97019 | WGQ | Add additional elements for Provider, Supplier and Provider Contract to the Nominations dataset. | NorAm | Revised Recommendation - as adopted by the EC on 12/17/98 | |||||
R97018 | WGQ | Add error codes to the Nominations Quick Response dataset. | NorAm | Recommendation | |||||
R97017 | WGQ | Form a task force to study the implementations of intra day noms and develop standards to achieve a seamless implementation. | Texaco | Recommendation | |||||
R97016 | WGQ | Modify the mapping of the rate segment in capacity release. | PEC | Recommendation | |||||
R97015 | WGQ | Add additional Rate Identification Codes and Surcharge Identification Codes to 5 Capacity Release datasets. | PEC | Recommendation | |||||
R97014 | WGQ | Modify the mapping of the Response Reason Code. | PEC | ||||||
R97013 | WGQ | Modify the usage of the Contingency End Date/Time. | PEC | ||||||
R97012 | WGQ | Modify the mapping of the UPPD Number. | PEC | ||||||
R97011 | WGQ | Add Bidder Company Code to the detail on the Final Disposition. | PEC | Recommendation
Recommendation - Revised |
|||||
R97010 | WGQ | Add Rate Identification Code and Surcharge Identification Code to the UPPD Validation. | PEC | Recommendation | |||||
R97009 | WGQ | Add a comment segment to the Withdrawal Upload and Withdrawl Download datasets. | PEC | Recommendation1 Recommendation2 |
|||||
R97008 | WGQ | Add Stand Alone Terms to the Offer Download. | PEC | Recommendation A Recommendation B |
|||||
R97007 | WGQ | Add a data element to allow the customer to choose whether contact information is displayed / downloaded. | PEC | ||||||
R97006 | WGQ | Modify the PDA dataset to indicate the swing contract. | Koch Gateway | Recommendation | |||||
R97005 | WGQ | Add a volume type to the Nomination and Schedule Quantity data sets. | NNG | ||||||
R97004 | WGQ | Add 5 new Charge Type codes to the Transportation/ Sales Invoice. | Koch Gateway | Recommendation | |||||
R97003 | WGQ | Add validation codes to the UPPD Validation. | Transwestern | Recommendation | |||||
R97002 | WGQ | Modify the definition of Preparer ID. | Columbia Gas | Recommendation | |||||
R97001 | WGQ | Update the Invoice to include the Line Number only in the Sub-detail. | Columbia Gas | Recommendation | |||||
R96131 | WGQ | Update Flowing Gas Implementation Guide to expand discussion and examples pertaining to Volume Allocations Statement. | Market Settlement Task Force | Recommendation
Revised Recommendation 2 - as adopted by the EC on 7/15/99 |
|||||
R96130 | WGQ | Add transaction type indicators to delineate receipt deficiency and tender deficiency nominations. | Northern Border | Recommendation | |||||
R96129 | WGQ | Add a new capacity type indicator and associated error/warning messages to the Nomination, Nomination Quick Response, and Scheduled Quantity data sets to identify interruptible gas delivered to a firm contract. | Northern Border | ||||||
R96128 | WGQ | Add data elements "Location" and "Beginning Date/Time" to the PDA Quick Response to allow the receiver of the PDA to pinpoint errors to a single location. | Columbia Gulf | ||||||
R96127 | WGQ | Add a data element to the Payment Remittance data set to indicate the reasons for non-payment. | Columbia Gulf | ||||||
R96126 | WGQ | Add a data element to the Payment Remittance data set to indicate the party being paid. | Columbia Gulf | Recommendation | |||||
R96125 | WGQ | Add a data element to the PDA, PDA Quick Response and Allocation Statement data sets to identify the level of allocation. | Columbia Gulf | Recommendation1
Recommendation2 Revised Recommendation A - as adopted by the EC on 7/15/99; |
|||||
R96124 | WGQ | Modify Shipper Imbalance Transaction so that it supports the Pathed Non-Threaded nomination model. | NGPL | Recommendation 1
Recommendation 2 Revised Recommendation |
|||||
R96123 | WGQ | Add a data element, Balancing Agreement, to the UPPD - Bidder Confirmation and UPPD - Bidder Confirmation Validation Capacity Release Data Sets. | Columbia Gas | Recommendation | |||||
R96122 | WGQ | Add 2 new code values to Service Code on the Transportation/Sales Invoice. | ANR | Recommendation | |||||
R96121 | WGQ | Add clarifying descriptions to 2 code values on the Charge Type on the Transportation/Sales Invoice. | ANR | Recommendation1 Recommendation2 Recommendation A-1 Recommendation A-2 Recommendation A-3 Recommendation A-4 Recommendation A-5 Recommendation A-6 Recommendation A-7 Recommendation A-8 Recommendation A-9 Recommendation A-10 Recommendation A-11 Recommendation A-12 Recommendation A-13 Recommendation A-14 Recommendation A-15 Recommendation A-16 Recommendation A-17 Revised Recommendation A-18 Recommendation A-19 Recommendation A-20 Recommendation A-21 Recommendation A-22 Recommendation A-23/R07011 |
Request for Comments due November 5, 2008 | ||||
R96120 | WGQ | Add 4 new code values to Charge Type on the Transportation/Sales Invoice. | ANR | Recommendation | |||||
R96119 | WGQ | Add a new data element, Indemnification Clauses, to datasets in Capacity Release Standards. | Columbia Gas | Recommendation | |||||
R96118 | WGQ | Add two code types of "Capacity Discount" and "Market Affiliates" to the Notice Type on the System-Wide Notice. | Columbia Gas | Recommendation | |||||
R96117 | WGQ | Add a code type of "other" to the Service Code on the Invoice Statement. | Columbia Gas | ||||||
R96116 | WGQ | Add minimum, maximum and bid point level quantity elements to the Upload to Pipeline of Prearranged Deal data set and other applicable capacity release data sets. | PEC | Revised Recommendation | |||||
R96115 | WGQ | Create a dataset for acceptance or errors/warnings for the Capacity Release Withdrawal Data Set. | PEC | Withdrawn by Submitter | |||||
R96114 | WGQ | Eliminate seconds from the Upload to Pipeline of Prearranged Deal elements for Contingency End Date/Time, Bid Period Start Date/Time, Bid Period End Date/Time, Prearranged Deal Match Date/Time. | PEC | ||||||
R96113 | WGQ | Limit the length of the UPPD Number to 10 characters in the Upload to Pipeline of Prearranged Deal. | PEC | ||||||
R96112 | WGQ | Identify and assign adjustment reason codes for prior period adjustments on the Measurement Information Statement. | NNG & TWPL | Recommendation | |||||
R96111 | WGQ | Add reduction reason codes to Confirmation Response. | PEC | ||||||
R96110 | WGQ | Add two business conditional data elements, Aggregator's Suppply Point and Aggregater's Supplier to Confirmation, Confirmation Resonse and Allocation data sets. | PEC | Recommendation | |||||
R96109 | WGQ | Add reduction reason codes to Scheduled Quantity 12/97. | PEC | ||||||
R96108 | WGQ | Add error codes and warning codes to Nomination Quick Response. | PEC | Recommendation | |||||
R96107 | WGQ | Add data element "Previous Balance Forward" to Invoice data dictionary. | PEC | Recommendation | |||||
R96106 | WGQ | Modify usage requirement of Contact Person in all Flowing Gas and Invoicing Related Standards dictionaries. | PEC | Recommendation | |||||
R96105 | WGQ | Add additional error codes and warning codes to Pre-determined Allocation Quick Response. | PEC | Recommendation | |||||
R96104 | WGQ | Modify definition of Limit Value in Pre-determined Allocation data dictionary. | PEC | Recommendation | |||||
R96103 | WGQ | Modify Invoice dataset, Beginning Flow Date/Time and Ending Flow Date/Time to be Beginning Production Period and Ending Production Period. | PEC | Recommendation | |||||
R96102 | WGQ | Modify Remittance Number element in Payment Remittance dataset to limit field size. | PEC | Recommendation | |||||
R96101 | WGQ | Modify usage requirement of Service Requester and Account Number in Payment Remittance and Invoice datasets. | PEC | Recommendation | |||||
R96100 | WGQ | Modify the Payment Remittance to allow for multiple service requesters per billable party. | PEC | Recommendation | |||||
R96099 | WGQ | Modify the UPPD Validation to include location information for error conditions. | NNG | Recommendation | |||||
R96098 | WGQ | Modify the Transportation/Sales Invoice "Charge Type" element to add codes values. | FGT | Recommendation | |||||
R96097 | WGQ | Modify the level of response on the Nomination Quick Response from Transaction level to Contract level. | Enron (NNG, FGT, TWPL) | Recommendation | |||||
R96096 | WGQ | Modify the usage code of the Charge Type element on the Transportation/Sales Invoice. | FGT | ||||||
R96095 | WGQ | Add a code value to the Transportation / Sales Invoice "Charge Indicator" element. | FGT | ||||||
R96094 | WGQ | Add the Surcharge Identification Code values from the UPPD to the UPPD - Validation document's Surcharge Identification Code element values. | FGT | Recommendation | |||||
R96093 | WGQ | Modify the Notes/Special Instruction document to remove the Gas Transaction Point. | FGT | Recommendation | |||||
R96092 | WGQ | Modify the allocation statement data dictionary so that Beginning Flow Date/Time and Ending Flow Date/Time are split into four elements. | PEC | Recommendation | |||||
R96091 | WGQ | Add a Return Addressee company code to the Notes/ Special Instructions document for UPPD purposes. | FGT | Recommendation | |||||
R96090 | WGQ | Add a business conditional indicator to the UPPD and UPPD-Notify and Request to Confirm to allow releasing shippers to release their right to change points. | FGT | Recommendation | |||||
R96089 | WGQ | Add Replacement Shipper Contract Number to UPPD and UPPD-Notify and Request to Confirm. | FGT | Recommendation | |||||
R96088 | WGQ | Add new code values for Service Code to the Transportation / Sales Invoice. | Koch Gateway | Recommendation | |||||
R96087 | WGQ | Modify the nominations transactions to add additional values to transaction type data element. | CNG | Recommendation | |||||
R96086 | WGQ | Modify the capacity release transactions to add surcharge identificiation codes. | CNG | Recommendation | |||||
R96085 | WGQ | Modify the nomination transactions to add reduction reason codes. | CNG | Recommendation | |||||
R96084 | WGQ | Modify the invoice transaction to add charge type codes. | NNG | Recommendation | |||||
R96083 | WGQ | Modify the statement of account transaction usage code for date element. | NNG | Recommendation | |||||
R96082 | WGQ | Modify the capacity release offer review, award notice, upload of pre-arranged deals and upload of pre-arranged deals request to confirm transactions to add rate identification code and a conforming change to upload of pre-arranged deals surcharge identification codes. | NNG | Recommendation | |||||
R96081 | WGQ | Modify the scheduled quantity and confirmation response transactions to add additional reduction reason codes. | NNG & TWPL | Recommendation | |||||
R96080 | WGQ | Modify the measurement information and allocation statement transactions to add contact information at the detail level. | NGPL | Recommendation | |||||
R96079 | WGQ | Modify the nomination quick response transaction to add a warning message. | NorAm | ||||||
R96078 | WGQ | Modify the GISB Standard 1.3.1 regarding implementation date. | PSE&G | ||||||
R96077 | WGQ | Modify the nominations related standards to conform to GISB business practices. | Mk Exec Task Force | ||||||
R96076 | WGQ | Modify the upload of pre-arranged deals transaction to add new status codes. | Koch Gateway | Recommendation | |||||
R96075 | WGQ | Modify the capacity release related transactions to add an additional data element - indemnification clauses. | Columbia Gas Trans | Recommendation | |||||
R96074 | WGQ | Modify the capacity release related transactions to add notice types. | Columbia Gas Trans | Recommendation | |||||
R96073 | WGQ | Modify the invoice transaction to add service codes. | Columbia Gas Trans | Recommendation | |||||
R96072 | WGQ | Modify the scheduled quantity transaction to add additional reduction reason codes. | NNG & TWPL | Recommendation | |||||
R96071 | WGQ | Modify the nomination quick response transaction to add status of nomination. | Enron | Recommendation | |||||
R96070 | WGQ | Modify the nomination transaction to add an additional capacity type of primary firm. | NNG | Recommendation | |||||
R96069 | WGQ | Modify the nomination quick response transaction to add a warning message. | EPNG | Recommendation | |||||
R96068 | WGQ | Modify the nominations and shipper imbalance transaction to add transaction type codes. | EPNG | Recommendation | |||||
R96067 | WGQ | Modify nominations transaction to add an additional option for capacity type. | Northern Natural | Recommendation | |||||
R96066 | WGQ | Modify the Transportation/Sales Invoice to add two data elements -- electronic funds transfer due data, and electronic funds transfer remittance address. | EPNG | Recommendation | |||||
R96065 | WGQ | Modify Standard 3.3.14 to define rendered as "post-marked for U.S. Postal Service delivery of communication, time-stamped for facsimile communication and time-stamped and delivered to the designated site for electronic communication." | MSTF | Recommendation | |||||
R96064 | WGQ | Modify Upload of Pre-Arranged Deals transactions to add one new data element (retained quantity) and incorporate two existing data elements (production area indicator, gas transaction point 1 zone), with the addition also of error messages and warning messages. | EPNG | Recommendation | |||||
R96063 | WGQ | Add abbreviations developed by the Market Settlement Task Force for the invoicing functions. | MSTF | Recommendation | |||||
R96062 | WGQ | Modify the Nominations Transaction to add a new data element - role. | EPNG | Recommendation | |||||
R96061 | WGQ | Modify the Nominations and Scheduled Quantity Transactions to add two new data elements - accounting data 1 and accounting data 2. | EPNG | Recommendation | |||||
R96060 | WGQ | Modify the Nominations Transaction to add a new data element - cycle. | EPNG | Recommendation | |||||
R96059 | WGQ | Modify the Nominations and Scheduled Quantity Transactions to add a new data element to be used by the service requester - comments. | EPNG | Recommendation1 Recommendation2 |
|||||
R96058 | WGQ | Modify the Nominations Related Standards to correct the examples to path non-threaded routing , and correction to the cross reference. | Koch Gateway | Recommendation | |||||
R96057 | WGQ | Modify the Nominations, Flowing Gas, and Invoicing Related Standards to change two data elements lengths - package id and contract number. | EPNG | Recommendation | |||||
R96056 | WGQ | Develop the Producer Imbalance Statement. | Exxon | Recommendation as approved by the WGQ EC on August 26, 2004 | Request for Comments due August 23, 2004 Comments Submitted by COPAS Comments Submitted by ExxonMobil |
||||
R96055 | WGQ | Modify the Invoice Related Standards to refer to the data element invoice code as invoice identifier. | MSTF | Recommendation | |||||
R96054 | WGQ | Modify the Request for Confirmation and the Confirmation Response Transactions to include a new data element - service requester. | PanEnergy | Recommendation | |||||
R96053 | WGQ | Modify the Confirmation Response Transaction to provide for a usage code of "C" from "BC" for Downstream Contract Identifier, and modify the text of the data dictionary. | PanEnergy | Recommendation | |||||
R96052 | WGQ | Modify the Confirmation Response Transaction to provide for a usage code of "C" from "BC" for Upstream Contract Identifier, and modify the text of the data dictionary. | PanEnergy | Recommendation | |||||
R96051 | WGQ | Modify the Confirmation Response Transaction to provide for a usage code of "C" from "MA" for Service Requester Contract, and modify the text of the data dictionary. | PanEnergy | Recommendation | |||||
R96050 | WGQ | Modify the Upload of a Pre-Arranged Deal, Offer Download, and Invoicing Transactions to include a new data element - rate basis indicator. | Northern Border | Recommendation1 Recommendation2 |
|||||
R96049 | WGQ | Modify the Confirmation Request Transaction to support a "final" transmission of data for informational purposes only. | Northern Border | Recommendation | |||||
R96048 | WGQ | Modify the Nominations Related Standards to add a new data element and associated error messages to specify the confirming party at an interconnection. | Northern Border | Recommendation | |||||
R96047 | WGQ | Modify the Nominations Related Standards to add additional values to the transaction type data element to delineate backhaul nominations and associated error messages. | Northern Border | Recommendation | |||||
R96046 | WGQ | Modify the Nominations Related Standards to add additional values to the transaction type data element to delineate linepack nominations and associated error messages. | Northern Border | Recommendation | |||||
R96045 | WGQ | Modify the Nominations Related Standards to add additional values to the transaction type data element to delineate fuel nominations and associated error messages. | Northern Border | Recommendation | |||||
R96044 | WGQ | Develop a Confirmation Response Quick Response Transaction. | PanEnergy | Recommendation-1
Revised Recommendation-2 |
|||||
R96043 | WGQ | Modify the Nominations Transactions to add additional values to the transaction type data element. | PanEnergy | Recommendation | |||||
R96042 | WGQ | Modify the Nominations and Shipper Imbalance Transaction Sets to add additional values to the transaction type data element. | EPNG | Recommendation1 Recommendation2 |
|||||
R96041 | WGQ | Modification of Capacity Release Related Standards. | MITF | ||||||
R96040 | WGQ | Modify the Request for Confirmation and confirmation Response Transactions for the definition of contractual flow indicator. | PanEnergy | Recommendation | |||||
R96039 | WGQ | Correction to GISB Standard 2.3.9 - Heating Values. | I.S. Anderson | ||||||
R96038 | WGQ | Modify the Pre-Determined Allocation Transaction to change the definition of allocation rank level, and to add values for the rank method data element. | PanEnergy | Recommendation | |||||
R96037 | WGQ | Modify Payment Remittance Transaction to add three new data elements - disputed line item amount paid, unit price paid, quantity paid. | MSTF | Recommendation | |||||
R96036 | WGQ | Develop Cash Out Information Statement Transaction. | MSTF | ||||||
R96035 | WGQ | Develop Request for Measurement Information and Request for Gas Metered Volume Statement Transactions. | PanEnergy | ||||||
R96034 | WGQ | Modify the Flowing Gas Related Standards to add an additional allocation methodology type - End user value. | PanEnergy | Recommendation 1
Recommendation 2 |
|||||
R96033 | WGQ | Modify the Measurement Information Transaction to add two new data elements - pressure base indicator and pressure base. | TransCapacity | Recommendation | |||||
R96032 | WGQ | Modify the Nominations Related Standards to add additional codes to the reduction reason and transaction type data elements. | CNG | Recommendation | |||||
R96031 | WGQ | Modify the Scheduled Quantity Transaction by adding a data element for the status of "not confirmed". | NGPL | Recommendation | |||||
R96030 | WGQ | Modify the Invoicing Related Standards to add three new data elements, Paid Amount - flow period, Beginning Flow Date/Time, Ending Flow Date/Time - to comply with GISB Std. 3.3.21. | PanEnergy | Recommendation | |||||
R96029 | WGQ | Modify the Nominations, Quick Response, and Scheduled Quantity Transactions to add agent and shipper data elements. | NGPL | Recommendation | |||||
R96028 | WGQ | Modify Nominations Transaction to add additional codes to the transaction type data element. | PanEnergy | Recommendation | |||||
R96027 | WGQ | Develop Conformed Quantity Transaction as part of the Nominations Related Standards. | NrG | Recommendation | |||||
R96026 | WGQ | Modify Nominations Quick Response Transaction to add four new error codes. | NrG | Recommendation | |||||
R96025 | WGQ | Modify Nominations Related Standards to provide title transfer code for transaction type data element. | NrG | Recommendation | |||||
R96024 | WGQ | Modify Nominations Related Standards to provide receipt as well as delivered quantity data elements. | Col Gas | Recommendation | |||||
R96023 | WGQ | Modify Nominations Related Standards to include storage contract number data element. | Col Gas | Recommendation | |||||
R96022 | WGQ | Modify several standards from disposition of principle to disposition of standard. | Registry | Recommendation A | |||||
R96021 | WGQ | Modify Capacity Release Offer, Upload of Pre-Arranged Deals, Upload of Pre-Arranged Deals Notifications, Awards Transactions to support second field for storage releases data element. | Col Gas | Recommendation | |||||
R96020 | WGQ | Modify Nominations Quick Response Transaction to support additional error codes. | PanEnergy | Recommendation | |||||
R96019 | WGQ | Modify Stds 1.3.14 and 2.3.9 to include conversion factors for Mexico. | Pemex | Recommendation | |||||
R96018 | WGQ | Develop standards for real-time capacity information. | TransCapacity | Recommendation - 5/17/2010 Attachment 1 - Data Dictionary Attachment 2 - EDI Technical |
Request for Comments Due June 17, 2010 | ||||
R96017 | WGQ | Modify Offer, Bid Review, Award Notice, and Upload of Pre-Arranged Deals Transactions to support maximum Appalachian receipt quantity data element. | CNG | Recommendation | |||||
R96016 | WGQ | Modify Nominations Transaction to support source 2 data element. | CNG | Recommendation1 Recommendation2 |
|||||
R96015 | WGQ | Modify Nominations Transaction to support fuel method indicator type data element. | Koch Gateway | Recommendation | |||||
R96014 | WGQ | Modify Nominations Transaction to support offer type data element. | Koch Gateway | Recommendation | |||||
R96013 | WGQ | Modify Nominations and Scheduled Quantity Transactions to support additional values for transaction types. | Tenneco Energy | Recommendation | |||||
R96012 | WGQ | Modify Confirmation and Confirmation Response Transactions to support receipt rank and delivery rank data element. | Tenneco Energy | Recommendation | |||||
R96011 | WGQ | Modify Scheduled Quantity Transaction to support additional values for reduction reason code. | Tenneco Energy | Recommendation | |||||
R96010 | WGQ | Modify Scheduled Quantity Transaction to support sending the transaction to operators, producers and end users. | Tenneco Energy | Recommendation | |||||
R96009 | WGQ | Develop the Request for Scheduled Quantity Information Transaction. | PanEnergy | Recommendation | |||||
R96008 | WGQ | Develop the Request for Shipper Imbalance Transaction. | PanEnergy | Recommendation 1
Recommendation 2 - amended and adopted by the EC on 10/12/00 and 10/19/00 Recommendation 2 - corrected, amended and adopted by the EC on 10/12/00 and 10/19/00 |
|||||
R96007 | WGQ | Develop the Request for Allocation Statement. | PanEnergy | Recommendation 1
Recommendation 2 - amended and adopted by the EC on 10/12/00 and 10/19/00 Recommendation 2 - corrected, amended and adopted by the EC on 10/12/00 and 10/19/00 |
|||||
R96006 | WGQ | Modify nominations standards to incorporate granting firm shippers the ability to nominate outside the primary contract path. | Williston Basin | Recommendation | |||||
R96005 | WGQ | Develop standards for Gas Metered Volume Statements. | Texaco | Recommendation | |||||
R96004 | WGQ | Enhance Model Trading Partner Agreement and adopt as a standard. | TransCapacity | Recommendation
Adopted Recommendation |
|||||
R96003 | WGQ | Changes to Definition of Gas Day -- Std. 1.3.1. | Northern Dist. Gas Group/ Minnegasco |
||||||
R96002 | WGQ | Enhancement to Standard 5.3.22. | NGPL | ||||||
R96001 | WGQ | Reliance on Actual Data Only for Prior Period Adjustments. | Texaco | ||||||
R95003 | WGQ | Develop Operational Balancing Agreement. | EC, Valero | Recommendation
Recommendation A |
|||||
R95002 | WGQ | Standardized Reporting. | AGD | ||||||
R95001 | WGQ | One Call National System for Natural Gas Emergencies. | NERC,INGAA |
Note: Older completed requests have been archived. To access these requests, please send an email to the NAESB office (naesb@naesb.org) indicating the request number. |
If you should encounter any problems or need further
information, please call (713) 356-0060. Copyright © 2025 North American Energy Standards Board,
Inc. All Rights Reserved. |